Boßler Tunnel (original) (raw)

About DBpedia

The Boßler Tunnel is a railway tunnel currently under construction as part of the new Wendlingen–Ulm high-speed railway. The tunnel is approximately 8,806 metres (28,891 ft) long, built as two parallel single-track tunnels. The tunnel runs between Aichelberg and Mühlhausen im Täle under the Roter Wasen and the Boßler mountain. It is one of a series of tunnels underneath the Swabian Jura range. When completed, it will be the longest tunnel on the line and the fifth longest tunnel in Germany (after the Landrücken Tunnel, the Münden Tunnel, the Filder Tunnel and the Katzenberg Tunnel).

thumbnail

Property Value
dbo:Infrastructure/length 8.806
dbo:abstract The Boßler Tunnel is a railway tunnel currently under construction as part of the new Wendlingen–Ulm high-speed railway. The tunnel is approximately 8,806 metres (28,891 ft) long, built as two parallel single-track tunnels. The tunnel runs between Aichelberg and Mühlhausen im Täle under the Roter Wasen and the Boßler mountain. It is one of a series of tunnels underneath the Swabian Jura range. When completed, it will be the longest tunnel on the line and the fifth longest tunnel in Germany (after the Landrücken Tunnel, the Münden Tunnel, the Filder Tunnel and the Katzenberg Tunnel). (en) Der Boßlertunnel ist ein Eisenbahntunnel der Schnellfahrstrecke Wendlingen–Ulm. Mit einer Länge von 8808 m (Streckenkilometer 45,367 bis 54,175) ist der aus zwei jeweils eingleisigen Röhren bestehende Tunnel der längste Tunnel der Strecke sowie der fünftlängste Eisenbahntunnel Deutschlands (nach dem Landrückentunnel, dem Mündener Tunnel, dem Fildertunnel und dem Katzenbergtunnel). Der Durchschlag der zweiten Röhre erfolgte am 8. Juni 2018. (de)
dbo:length 8806.000000 (xsd:double)
dbo:numberOfTracks 2 (xsd:nonNegativeInteger)
dbo:owner dbr:Deutsche_Bahn
dbo:railwayLineUsingTunnel dbr:Wendlingen–Ulm_high-speed_railway
dbo:status under construction
dbo:thumbnail wiki-commons:Special:FilePath/NBS-Wendlinge-Ulm_PFA2.2_Umpfental.jpg?width=300
dbo:wikiPageExternalLink http://www.bahnprojekt-stuttgart-ulm.de/en/
dbo:wikiPageID 50986939 (xsd:integer)
dbo:wikiPageLength 27238 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID 1095530423 (xsd:integer)
dbo:wikiPageWikiLink dbr:Deutsche_Bahn dbr:White_Jurassic dbr:Boßler dbr:Mühlhausen_im_Täle dbr:NATM dbr:Single_track_(rail) dbr:Stuttgart dbr:Feldbahn dbr:Site_survey dbr:Bundesautobahn_8 dbr:Tunnel_boring_machine dbr:Weilheim_an_der_Teck dbr:Wendlingen–Ulm_high-speed_railway dbr:Westerheim,_Baden-Württemberg dbr:Wiesensteig dbr:Karst dbr:Landrücken_Tunnel dbr:Aichelberg dbr:Swabian_Jura dbc:High-speed_railway_lines_in_Germany dbc:Railway_tunnels_in_Germany dbr:Katzenberg_Tunnel dbr:Highway_location_marker dbr:Middle_Jurassic dbr:Neidlingen dbr:Münden_Tunnel dbr:Overburden dbr:Eisenbahnbundesamt dbr:A8_motorway_(Germany) dbr:File:Baustelle_Boßlertunnel_Aichelberg_Abraumhalde_April_2016.jpg dbr:File:Bosslertunnel_Wiesensteig_vor_Durchstich.png dbr:File:NBS_Wendlingen-Ulm_Profil.png dbr:Fils_Viaduct dbr:Steinbühltunnel
dbp:caption Boßler Tunnel (en)
dbp:date July 2016 (en)
dbp:grade 2.5
dbp:line dbr:Wendlingen–Ulm_high-speed_railway
dbp:notrack 2 (xsd:integer)
dbp:officialName Boßlertunnel (en)
dbp:opens December 2022 (en)
dbp:owner dbr:Deutsche_Bahn
dbp:reason Reads like a machine translation of the de article (en)
dbp:startwork 2013 (xsd:integer)
dbp:status under construction (en)
dbp:traffic high speed passenger trains (en)
dbp:wikiPageUsesTemplate dbt:Cleanup dbt:Commons_category dbt:Convert dbt:Coord dbt:Reflist dbt:Infobox_tunnel
dcterms:subject dbc:High-speed_railway_lines_in_Germany dbc:Railway_tunnels_in_Germany
georss:point 48.6015 9.6044
rdf:type owl:Thing dbo:Infrastructure dbo:RouteOfTransportation dbo:RailwayTunnel geo:SpatialThing dbo:ArchitecturalStructure wikidata:Q1311958
rdfs:comment The Boßler Tunnel is a railway tunnel currently under construction as part of the new Wendlingen–Ulm high-speed railway. The tunnel is approximately 8,806 metres (28,891 ft) long, built as two parallel single-track tunnels. The tunnel runs between Aichelberg and Mühlhausen im Täle under the Roter Wasen and the Boßler mountain. It is one of a series of tunnels underneath the Swabian Jura range. When completed, it will be the longest tunnel on the line and the fifth longest tunnel in Germany (after the Landrücken Tunnel, the Münden Tunnel, the Filder Tunnel and the Katzenberg Tunnel). (en) Der Boßlertunnel ist ein Eisenbahntunnel der Schnellfahrstrecke Wendlingen–Ulm. Mit einer Länge von 8808 m (Streckenkilometer 45,367 bis 54,175) ist der aus zwei jeweils eingleisigen Röhren bestehende Tunnel der längste Tunnel der Strecke sowie der fünftlängste Eisenbahntunnel Deutschlands (nach dem Landrückentunnel, dem Mündener Tunnel, dem Fildertunnel und dem Katzenbergtunnel). Der Durchschlag der zweiten Röhre erfolgte am 8. Juni 2018. (de)
rdfs:label Boßler Tunnel (en) Boßlertunnel (de)
owl:sameAs wikidata:Boßler Tunnel dbpedia-de:Boßler Tunnel https://global.dbpedia.org/id/53c5y
geo:geometry POINT(9.6043996810913 48.601501464844)
geo:lat 48.601501 (xsd:float)
geo:long 9.604400 (xsd:float)
prov:wasDerivedFrom wikipedia-en:Boßler_Tunnel?oldid=1095530423&ns=0
foaf:depiction wiki-commons:Special:FilePath/Baustelle_Boßlertunnel_Aichelberg_Abraumhalde_April_2016.jpg wiki-commons:Special:FilePath/Bosslertunnel_Wiesensteig_vor_Durchstich.png wiki-commons:Special:FilePath/NBS-Wendlinge-Ulm_PFA2.2_Umpfental.jpg wiki-commons:Special:FilePath/NBS_Wendlingen-Ulm_Profil.png
foaf:isPrimaryTopicOf wikipedia-en:Boßler_Tunnel
is dbo:wikiPageRedirects of dbr:Bossler_Tunnel
is dbo:wikiPageWikiLink of dbr:Boßler dbr:Wendlingen–Ulm_high-speed_railway dbr:Bossler_Tunnel
is foaf:primaryTopic of wikipedia-en:Boßler_Tunnel