Der Bumbuna-Damm ist der größte Staudamm in Sierra Leone. Er staut den Seli. Die Talsperre befindet sich wenige Kilometer von im Distrikt Tonkolili. Der Staudamm beherbergt das erste und einzige Wasserkraftwerk des Landes und ist das einzige öffentliche, überregionale Kraftwerk im Land. Die Ausgangsleistung beträgt maximal 50 Megawatt.
Property | Value |
---|---|
dbo:Infrastructure/length | 0.44 |
dbo:abstract | The Bumbuna Dam is a concrete-face rock-fill dam on the Seli River near Bumbuna in Tonkolili District, Sierra Leone, and 350 kilometres (220 mi) from the capital of Freetown, the main consumer. The country's first hydroelectric dam, it supports a 50-megawatt (67,000 hp) power station. The site for the dam at Bumbuna Falls was first identified in 1971, and construction was begun in 1975. Work was halted in May 1997, about 85% completed, due to the Sierra Leone Civil War, and did not restart until 2005. The project was completed and went online in 2009. Nearly a third of the dam's US$327 million cost ($103 million) was supplied by the African Development Bank. A 26 January 2005 report noted that 33 villages would be affected by the dam, although only one (of 16 households and 135 people) would require resettlement. The dam has a maximum height of 87 metres (285 ft), a length of 400 metres (1,300 ft) at the crest and a volume of 2,500,000 cubic metres (88,000,000 cu ft). The volume of the reservoir created is 410,000,000 cubic metres (1.4×1010 cu ft), 428,000,000 cubic metres (1.51×1010 cu ft) or 480,000,000 cubic metres (1.7×1010 cu ft). There are two Francis turbines, each rated for 25 megawatts (34,000 hp). After completion, the project has been plagued with problems, and barely produces 10 megawatts (13,000 hp) or 25 megawatts (34,000 hp) as of 2013. A second phase is planned, for a 110-megawatt (150,000 hp) power station. In June 2011, the government announced it had awarded the $750 million Phase II project to Joule Africa, a UK-based company. This will entail a second dam and plant. Construction was set to begin in 2014 and continue on until at least 2017. (en) Der Bumbuna-Damm ist der größte Staudamm in Sierra Leone. Er staut den Seli. Die Talsperre befindet sich wenige Kilometer von im Distrikt Tonkolili. Der Staudamm beherbergt das erste und einzige Wasserkraftwerk des Landes und ist das einzige öffentliche, überregionale Kraftwerk im Land. Die Ausgangsleistung beträgt maximal 50 Megawatt. (de) ГЕС Бумбуна – гідроелектростанція у Сьєрра-Леоне, споруджена на найбільшій річці країни Селі (бере початок у горах Лома та впадає в Атлантичний океан утворюючи естуарій Сьєрра-Леоне). Спорудження станції почалось ще у 1975 році та тягнулось кілька десятиліть. Станом на 1997-й за проектом виконали біля 85% робіт, проте далі будівництво зупинилось через громадянську війну, що тривала з 1991 по 2002 роки. По її завершенні у 2005-му роботи відновились, а за чотири роки ГЕС нарешті ввели в експлуатацію. Річку перекрили кам’яно-накидною греблею з бетонним облицюванням висотою 88 метрів та довжиною 400 метрів (товщина облицювання 4 метри), яка потребувала 2,5 млн м3 матеріалу (об’єм бетонних конструкцій – 150 тис м3). Вона утворила водосховище площею поверхні 21 км2 та об’ємом 410 млн.м3. У сховищі спорудили водозабірну вежу висотою 93 метри та діаметром 7,5 метрів, з якої через тунель під греблею діаметром 9 метрів та довжиною 0,6 км відбувається подача води на турбіни. Пригреблевий машинний зал обладнаний двома гідрогрегатами з турбінами типу Френсіс потужністю по 25 МВт, що працюють при напорі від 47 до 80 метрів. Їх проектне виробництво має складати 315 млн.кВт-год електроенергії на рік. Втім, одразу після спорудження станція працювала з максимальною потужністю 35 МВт, причиною чого зокрема була нестача води у сховищі. При цьому на річці планується спорудити другу чергу комплексу, яка завдяки ще одному сховищу забезпечить накопичення додаткового ресурсу та надасть можливість ГЕС Бумбуна працювати в повну силу. Видача продукції відбувається по ЛЕП, що працює під напругою 161 кВ. (uk) |
dbo:buildingStartDate | 1979 |
dbo:buildingStartYear | 1979-01-01 (xsd:gYear) |
dbo:country | dbr:Sierra_Leone |
dbo:description | Embankment, concrete-face rock-fill (en) |
dbo:height | 88.000000 (xsd:double) |
dbo:lake | dbr:Bumbuna_Dam__Lake__1 |
dbo:length | 440.000000 (xsd:double) |
dbo:location | dbr:Bumbuna |
dbo:openingYear | 2009-01-01 (xsd:gYear) |
dbo:part | dbr:Bumbuna_Dam__PowerStation__1 |
dbo:purpose | Power |
dbo:river | dbr:Seli_River |
dbo:status | O |
dbo:wikiPageExternalLink | https://web.archive.org/web/20140221061321/http:/www.bumbuna.sl/ |
dbo:wikiPageID | 42307613 (xsd:integer) |
dbo:wikiPageLength | 6771 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID | 1061921363 (xsd:integer) |
dbo:wikiPageWikiLink | dbr:Hydroelectric dbr:Freetown dbr:Sierra_Leone dbr:Sierra_Leone_Civil_War dbr:Bumbuna dbr:Bumbuna_II_Hydroelectric_Power_Station dbc:Hydroelectric_power_stations_in_Sierra_Leone dbc:Concrete-face_rock-fill_dams dbr:Tonkolili_District dbr:African_Development_Bank dbc:Dams_completed_in_2009 dbc:Energy_infrastructure_completed_in_2009 dbr:Francis_turbine dbc:Northern_Province,_Sierra_Leone dbr:Reservoir dbc:Dams_in_Sierra_Leone dbc:Infrastructure_in_Sierra_Leone dbr:Concrete-face_rock-fill_dam dbr:Seli_River |
dbp:constructionBegan | 1979 (xsd:integer) |
dbp:cost | 3.27E8 |
dbp:country | dbr:Sierra_Leone |
dbp:damCrosses | dbr:Seli_River |
dbp:damType | Embankment, concrete-face rock-fill (en) |
dbp:location | dbr:Bumbuna |
dbp:locationMap | Sierra Leone (en) |
dbp:name | Bumbuna Dam (en) |
dbp:opening | 2009 (xsd:integer) |
dbp:plantCommission | 2009 (xsd:integer) |
dbp:plantTurbines | 2 (xsd:integer) |
dbp:purpose | Power (en) |
dbp:spillwayType | Bell-mouth (en) |
dbp:status | O (en) |
dbp:website | https://web.archive.org/web/20140221061321/http:/www.bumbuna.sl/ |
dbp:wikiPageUsesTemplate | dbt:Convert dbt:Coord dbt:Portal dbt:Reflist dbt:Stack dbt:Infobox_dam |
dcterms:subject | dbc:Hydroelectric_power_stations_in_Sierra_Leone dbc:Concrete-face_rock-fill_dams dbc:Dams_completed_in_2009 dbc:Energy_infrastructure_completed_in_2009 dbc:Northern_Province,_Sierra_Leone dbc:Dams_in_Sierra_Leone dbc:Infrastructure_in_Sierra_Leone |
gold:hypernym | dbr:Dam |
georss:point | 9.071494444444445 -11.722897222222223 |
rdf:type | owl:Thing dbo:Infrastructure wikidata:Q12323 dbo:Dam yago:WikicatConcrete-faceRock-fillDams yago:WikicatDamsCompletedIn2009 yago:WikicatDamsInSierraLeone geo:SpatialThing dbo:ArchitecturalStructure yago:Artifact100021939 yago:Barrier102796623 yago:Dam103160309 yago:Facility103315023 yago:Object100002684 yago:Obstruction103839993 yago:PhysicalEntity100001930 yago:PowerStation103996655 yago:WikicatHydroelectricPowerStationsInSierraLeone yago:YagoGeoEntity yago:YagoPermanentlyLocatedEntity yago:Station104306080 yago:Structure104341686 yago:Whole100003553 |
rdfs:comment | Der Bumbuna-Damm ist der größte Staudamm in Sierra Leone. Er staut den Seli. Die Talsperre befindet sich wenige Kilometer von im Distrikt Tonkolili. Der Staudamm beherbergt das erste und einzige Wasserkraftwerk des Landes und ist das einzige öffentliche, überregionale Kraftwerk im Land. Die Ausgangsleistung beträgt maximal 50 Megawatt. (de) The Bumbuna Dam is a concrete-face rock-fill dam on the Seli River near Bumbuna in Tonkolili District, Sierra Leone, and 350 kilometres (220 mi) from the capital of Freetown, the main consumer. The country's first hydroelectric dam, it supports a 50-megawatt (67,000 hp) power station. After completion, the project has been plagued with problems, and barely produces 10 megawatts (13,000 hp) or 25 megawatts (34,000 hp) as of 2013. (en) ГЕС Бумбуна – гідроелектростанція у Сьєрра-Леоне, споруджена на найбільшій річці країни Селі (бере початок у горах Лома та впадає в Атлантичний океан утворюючи естуарій Сьєрра-Леоне). Спорудження станції почалось ще у 1975 році та тягнулось кілька десятиліть. Станом на 1997-й за проектом виконали біля 85% робіт, проте далі будівництво зупинилось через громадянську війну, що тривала з 1991 по 2002 роки. По її завершенні у 2005-му роботи відновились, а за чотири роки ГЕС нарешті ввели в експлуатацію. Видача продукції відбувається по ЛЕП, що працює під напругою 161 кВ. (uk) |
rdfs:label | Bumbuna Dam (en) Bumbuna-Stausee (de) ГЕС Бумбуна (uk) |
owl:sameAs | freebase:Bumbuna Dam yago-res:Bumbuna Dam wikidata:Bumbuna Dam geodata:Bumbuna Dam http://ceb.dbpedia.org/resource/Bumbuna_Dam dbpedia-de:Bumbuna Dam dbpedia-fa:Bumbuna Dam dbpedia-uk:Bumbuna Dam https://global.dbpedia.org/id/eaN6 |
geo:geometry | POINT(-11.722897529602 9.071494102478) |
geo:lat | 9.071494 (xsd:float) |
geo:long | -11.722898 (xsd:float) |
prov:wasDerivedFrom | wikipedia-en:Bumbuna_Dam?oldid=1061921363&ns=0 |
foaf:homepage | https://web.archive.org/web/20140221061321/http:/www.bumbuna.sl/ https://web.archive.org/web/20140221061321/http://www.bumbuna.sl/ |
foaf:isPrimaryTopicOf | wikipedia-en:Bumbuna_Dam |
foaf:name | Bumbuna Dam (en) |
is dbo:wikiPageWikiLink of | dbr:List_of_power_stations_in_Sierra_Leone dbr:Sierra_Leone dbr:Sierra_Leonean_leone dbr:Bumbuna dbr:Bumbuna_II_Hydroelectric_Power_Station dbr:Rokel_River dbr:List_of_dams_and_reservoirs |
is foaf:primaryTopic of | wikipedia-en:Bumbuna_Dam |