Delhi–Alwar Regional Rapid Transit System (Delhi–Alwar RRTS) is a 164 km long under-construction semi-high speed rail corridor connecting Delhi, Gurgaon, Rewari and Alwar. It is one of the three rapid-rail corridors planned under Phase-1 of the Rapid Rail Transport System of the National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h and average speed of 105 km/h, the distance between Delhi and Alwar will be covered in 104 minutes. The project is expected to cost ₹37,000 crores. The Phase-I construction is expected to be complete by December 2024.