First fix and second fix are terms used in the UK and Irish housebuilding and commercial building construction industry. First fix comprises all the work needed to take a building from foundation to putting plaster on the internal walls. This includes constructing walls, floors and ceilings, and inserting cables for electrical supply and pipes for water supply. Some argue that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Here is a list, in no particular order, of the elements of First Fix. The list is not exhaustive.

Property Value
dbo:abstract First fix and second fix are terms used in the UK and Irish housebuilding and commercial building construction industry. First fix comprises all the work needed to take a building from foundation to putting plaster on the internal walls. This includes constructing walls, floors and ceilings, and inserting cables for electrical supply and pipes for water supply. Some argue that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Here is a list, in no particular order, of the elements of First Fix. * Drain runs: must be downhill and straight * Spare conduits: draw strings * Soil pipes * Copper pipes * MVHR (mechanical heat recovery ventilation runs) * Push-fit or other plastic piping * Electrical back boxes * Electricity cable runs * Telephone, data and audiovisual cables * Socket location * Security * Fire alarm * Normal pipes * Door bell * Door frames * Pocket doorframes * Stair well: floating / cantilevered? * Sound insulation * Plasterboarding The list is not exhaustive. Second fix comprises all the work after the plastering of a finished house. Electrical fixtures are connected to the cables, sinks and baths connected to the pipes, and doors fitted into doorframes. Second fix work requires a neater finish than first fix. The division of work is a convenient description because electricians, plumbers and carpenters will probably have to make two separate visits to one property under construction, at separate times. Project managers can report "first fix complete" or "second fix 50% done" and others can understand. Some construction companies specialise in first fix work or second fix work, but most do both. In North America, terms such as roughing in and finishing or rough-in and finish work are often heard, referring to similar concepts. Another related set of terms is outside work and inside work (the building is closed to the weather when the latter occurs). Carpenters speak of rough work and trim work (or framing versus trimming), and other fields have analogues, such as machining (roughing versus finishing cuts) and communications (rough draft versus revised draft). (en)
dbo:wikiPageID 10018162 (xsd:integer)
dbo:wikiPageLength 5360 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID 1124422821 (xsd:integer)
dbo:wikiPageWikiLink dbr:Carpenter dbr:Electrical_cable dbr:Electrician dbr:Bathtub dbr:Door dbr:Integrated_circuit dbr:Construction dbr:Cleanroom dbr:Plaster dbr:Plumber dbr:Machining dbr:Water_pipe dbr:Draft_document dbc:Building_engineering dbr:Ceiling dbr:Floor dbr:Heat_recovery_ventilation dbr:Building dbr:Mains_electricity dbr:Project_manager dbr:Semiconductor_device dbr:Sink dbr:Wall dbr:Server_room dbr:Water_supply dbr:Foundation_(architecture) dbr:Discrete_component
dbp:wikiPageUsesTemplate dbt:Reflist
dct:subject dbc:Building_engineering
gold:hypernym dbr:Terms
rdf:type dbo:Country
rdfs:comment First fix and second fix are terms used in the UK and Irish housebuilding and commercial building construction industry. First fix comprises all the work needed to take a building from foundation to putting plaster on the internal walls. This includes constructing walls, floors and ceilings, and inserting cables for electrical supply and pipes for water supply. Some argue that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Here is a list, in no particular order, of the elements of First Fix. The list is not exhaustive. (en)
rdfs:label First fix and second fix (en)
owl:sameAs freebase:First fix and second fix wikidata:First fix and second fix https://global.dbpedia.org/id/4jshP
prov:wasDerivedFrom wikipedia-en:First_fix_and_second_fix?oldid=1124422821&ns=0
foaf:isPrimaryTopicOf wikipedia-en:First_fix_and_second_fix
is dbo:wikiPageRedirects of dbr:First_fix dbr:Second_fix
is dbo:wikiPageWikiLink of dbr:Index_of_construction_articles dbr:Grand_Designs dbr:Glossary_of_structural_engineering dbr:First_fix dbr:Second_fix
is foaf:primaryTopic of wikipedia-en:First_fix_and_second_fix