Genale Dawa III Hydroelectric Power Station (original) (raw)
The Genale Dawa III Power Station, also GD-3 Power Station, is a hydroelectric power station across the Ganale Doria River in Ethiopia. Construction began circa March 2011 and the power station was commercially commissioned in February 2020. The renewable energy infrastructure development is owned by the government of Ethiopia and was constructed by China Gezhouba Group, a subsidiary of China Energy Engineering Corporation at an estimated cost of £352.7 million ($451 million), co-financed by the Exim Bank of China and the Ethiopian Government.