Harbanspura Interchange (original) (raw)
The Harbansupura Interchange is an interchange constructed in Harbanspura Canal Crossing, Lahore. The Ring Road is elevated by a flyover to allow free movement of traffic. It is a 3 lane dual carriage way with an auxiliary lane on either side, 3 meter outer shoulder and 1.275 meter inner shoulder. The project was started on March 1, 2009 and completed January 30th, 2010. After a total cost of 1200 million PKR, it was integrated with Ring Road Lahore on April 21, 2010.