Kadapa Ultra Mega Solar Park is a solar park spread over a total area of 5,927.76 acres (23.9888 km2) in the Mylavaram mandal of Kadapa district, Andhra Pradesh. The project is being implemented by the Andhra Pradesh Solar Power Corporation Private Limited (APSPCL), a joint venture of Solar Energy Corporation of India (SECI), Andhra Pradesh Power Generation Corporation and the New & Renewable Energy Development Corporation of Andhra Pradesh Ltd. In February 2020, 250 MW capacity was commissioned by Solairedirect and the remaining 750 MW is under various stages of construction.
Property | Value |
---|---|
dbo:abstract | Kadapa Ultra Mega Solar Park is a solar park spread over a total area of 5,927.76 acres (23.9888 km2) in the Mylavaram mandal of Kadapa district, Andhra Pradesh. The project is being implemented by the Andhra Pradesh Solar Power Corporation Private Limited (APSPCL), a joint venture of Solar Energy Corporation of India (SECI), Andhra Pradesh Power Generation Corporation and the New & Renewable Energy Development Corporation of Andhra Pradesh Ltd. A 1,000 MW solar park at Kadapa was approved by the Union Government in August 2015. NTPC Limited invited bids from solar power developers to develop 250 MW capacity in March 2016, and 650 MW capacity in July 2016. The auction for 250 MW concluded on 11 April 2017. NTPC awarded the contract to French firm Solairedirect for a record-low tariff of INR 3.15 per kWh, beating the previous low of INR 3.29 per kWh awarded in auctions for the Rewa Solar Park on 10 February 2017. The price is the levellized tariff for 25 years. Although the Rewa contract was awarded at a cost of INR 2.97 per kWh, the levellized tariff over the contract's 25 year period amounts to INR 3.30 per kWh. In January 2017, SECI issued India's first grid-scale solar-plus-storage tender to install 5MW/2.5MWh battery energy storage systems to two separate solar projects of 50 MW each in the park. The project has been delayed due to Andhra Pradesh discoms refusing to purchase the power generated at the solar plant. Discoms argue that solar tariffs have dropped considerably since the auction for the Kadapa park took place and prefer to source power from other sources. In February 2020, 250 MW capacity was commissioned by Solairedirect and the remaining 750 MW is under various stages of construction. (en) |
dbo:installedCapacity | 1000000000.000000 (xsd:double) |
dbo:location | dbr:Mylavaram,_Kadapa dbr:Andhra_Pradesh |
dbo:openingYear | 2018-01-01 (xsd:gYear) |
dbo:wikiPageExternalLink | https://www.apspcl.ap.gov.in/content/kadapa-ultra-mega-solar-park-1000-mw-1 |
dbo:wikiPageID | 53542224 (xsd:integer) |
dbo:wikiPageLength | 7414 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID | 1100729137 (xsd:integer) |
dbo:wikiPageWikiLink | dbr:Power_sector_of_Andhra_Pradesh dbc:Buildings_and_structures_in_Kadapa_district dbc:Energy_in_Andhra_Pradesh dbr:Mylavaram,_Kadapa dbr:NP_Kunta_Ultra_Mega_Solar_Park dbr:NTPC_Limited dbr:Andhra_Pradesh dbr:Andhra_Pradesh_Power_Generation_Corporation dbc:Photovoltaic_power_stations_in_India dbc:2020_establishments_in_Andhra_Pradesh dbc:Energy_infrastructure_completed_in_2020 dbr:Solairedirect dbr:Kadapa_district dbr:Solar_Energy_Corporation_of_India dbr:Kurnool_Ultra_Mega_Solar_Park dbr:Photovoltaic_power_station |
dbp:commissioned | 2018 (xsd:integer) |
dbp:country | India (en) |
dbp:location | Mylavaram mandal Kadapa district, Andhra Pradesh (en) |
dbp:name | Kadapa Ultra Mega Solar Park (en) |
dbp:owner | Andhra Pradesh Solar Power Corporation Private Limited (en) |
dbp:psElectricalCapacity | 1000.0 (dbd:megawatt) |
dbp:psUnitsOperational | 250.0 (dbd:megawatt) |
dbp:psUnitsUc | 750.0 (dbd:megawatt) |
dbp:solarSiteResource | 5.500000 (xsd:double) |
dbp:solarType | pv (en) |
dbp:website | https://www.apspcl.ap.gov.in/content/kadapa-ultra-mega-solar-park-1000-mw-1 |
dbp:wikiPageUsesTemplate | dbt:Convert dbt:Coord dbt:Reflist dbt:Short_description dbt:Use_Indian_English dbt:Use_dmy_dates dbt:Infobox_power_station dbt:SPIN |
dct:subject | dbc:Buildings_and_structures_in_Kadapa_district dbc:Energy_in_Andhra_Pradesh dbc:Photovoltaic_power_stations_in_India dbc:2020_establishments_in_Andhra_Pradesh dbc:Energy_infrastructure_completed_in_2020 |
georss:point | 14.91638888888889 78.29194444444444 |
rdf:type | owl:Thing dbo:Infrastructure wikidata:Q159719 geo:SpatialThing dbo:ArchitecturalStructure dbo:PowerStation |
rdfs:comment | Kadapa Ultra Mega Solar Park is a solar park spread over a total area of 5,927.76 acres (23.9888 km2) in the Mylavaram mandal of Kadapa district, Andhra Pradesh. The project is being implemented by the Andhra Pradesh Solar Power Corporation Private Limited (APSPCL), a joint venture of Solar Energy Corporation of India (SECI), Andhra Pradesh Power Generation Corporation and the New & Renewable Energy Development Corporation of Andhra Pradesh Ltd. In February 2020, 250 MW capacity was commissioned by Solairedirect and the remaining 750 MW is under various stages of construction. (en) |
rdfs:label | Kadapa Ultra Mega Solar Park (en) |
owl:sameAs | yago-res:Kadapa Ultra Mega Solar Park wikidata:Kadapa Ultra Mega Solar Park https://global.dbpedia.org/id/2jD31 |
geo:geometry | POINT(78.291946411133 14.916388511658) |
geo:lat | 14.916389 (xsd:float) |
geo:long | 78.291946 (xsd:float) |
prov:wasDerivedFrom | wikipedia-en:Kadapa_Ultra_Mega_Solar_Park?oldid=1100729137&ns=0 |
foaf:homepage | https://www.apspcl.ap.gov.in/content/kadapa-ultra-mega-solar-park-1000-mw-1 |
foaf:isPrimaryTopicOf | wikipedia-en:Kadapa_Ultra_Mega_Solar_Park |
foaf:name | Kadapa Ultra Mega Solar Park (en) |
is dbo:wikiPageWikiLink of | dbr:Power_sector_of_Andhra_Pradesh dbr:Ultra_Mega_Solar_Power_Projects dbr:NP_Kunta_Ultra_Mega_Solar_Park dbr:Solar_power_in_India dbr:Kurnool_Ultra_Mega_Solar_Park |
is foaf:primaryTopic of | wikipedia-en:Kadapa_Ultra_Mega_Solar_Park |