dbo:abstract |
Orange Line 12 (Extension), or the Kalyan-Dombivli-Taloja Line is a proposed line of Mumbai Metro. It will be an extension of Orange Line. The total length of the line is planned to be 20.75 kilometres (12.89 mi), and the route will be completely elevated. The total cost of the construction is planned to be Rs 4,132 crore. MMRDA approved the Kalyan-Dombivli-Taloja Metro line. There will be 18 stations. This line will connect Navi Mumbai city with Kalyan-Dombivali city. Delhi Metro authority show red flag to Kalyan-Dombivli-Taloja Metro line.However the construction work started on 01/11/2019 and is expected to be completed on 31/10/2024 with Revenue Opening Date (ROD) as 01/11/2024.MMRDA in its 138th Authority Meeting held on 26/08/2015 vide Resolution No. 1340 has granted In-principle Approval to develop growth Centre in Kalyan Taluka (area approx. 1089 Ha.) through implementation of Town Planning Schemes (TPS). (en) |
dbo:isPartOf |
dbr:Mumbai_Metro |
dbo:lineLength |
20750.000000 (xsd:double) |
dbo:location |
dbr:Maharashtra dbr:Thane dbr:Navi_Mumbai |
dbo:numberOfStations |
18 (xsd:nonNegativeInteger) |
dbo:operator |
dbr:MMRDA |
dbo:owner |
dbr:Mumbai_Metropolitan_Region_Development_Authority |
dbo:routeEnd |
dbr:Taloja |
dbo:routeStart |
dbr:Kalyan |
dbo:status |
Approved |
dbo:thumbnail |
wiki-commons:Special:FilePath/Maha_Mumbai_Metro.png?width=300 |
dbo:wikiPageID |
59143629 (xsd:integer) |
dbo:wikiPageLength |
5775 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID |
1107858058 (xsd:integer) |
dbo:wikiPageWikiLink |
dbr:Kalyan-Dombivali dbr:MMRDA dbr:English_language dbr:Mumbai_Metro dbr:Mumbai_Metropolitan_Region_Development_Authority dbr:Line_1_(Navi_Mumbai_Metro) dbr:Line_5_(Mumbai_Metro) dbr:Maharashtra dbc:Mumbai_Metro_lines dbr:Thane dbr:Kalyan dbr:Marathi_language dbr:Taloja dbr:Navi_Mumbai |
dbp:character |
Elevated (en) |
dbp:color |
ffa500 (en) |
dbp:end |
dbr:Taloja |
dbp:linelengthKm |
20.750000 (xsd:double) |
dbp:linenumber |
12 (xsd:integer) |
dbp:locale |
Navi Mumbai and Thane, Maharashtra, India (en) |
dbp:mapState |
collapsed (en) |
dbp:name |
Mumbai Metro Orange Line 12 Extension (en) |
dbp:operator |
dbr:MMRDA |
dbp:owner |
dbr:Mumbai_Metropolitan_Region_Development_Authority |
dbp:start |
dbr:Kalyan |
dbp:stations |
18 (xsd:integer) |
dbp:status |
Approved (en) |
dbp:system |
dbr:Mumbai_Metro |
dbp:tracks |
2 (xsd:integer) |
dbp:type |
Metro (en) |
dbp:wikiPageUsesTemplate |
dbt:Color_box dbt:Convert dbt:Infobox_rail_line dbt:Reflist dbt:Stl dbt:Track_gauge dbt:Use_dmy_dates dbt:MM_Line_12 dbt:India-rail-transport-stub dbt:Mumbai_Metro_navbox |
dcterms:subject |
dbc:Mumbai_Metro_lines |
rdf:type |
owl:Thing dbo:Infrastructure dbo:RouteOfTransportation wikidata:Q728937 dbo:ArchitecturalStructure dbo:RailwayLine |
rdfs:comment |
Orange Line 12 (Extension), or the Kalyan-Dombivli-Taloja Line is a proposed line of Mumbai Metro. It will be an extension of Orange Line. The total length of the line is planned to be 20.75 kilometres (12.89 mi), and the route will be completely elevated. The total cost of the construction is planned to be Rs 4,132 crore. MMRDA approved the Kalyan-Dombivli-Taloja Metro line. There will be 18 stations. This line will connect Navi Mumbai city with Kalyan-Dombivali city. (en) |
rdfs:label |
Line 12 (Mumbai Metro) (en) |
owl:sameAs |
wikidata:Line 12 (Mumbai Metro) dbpedia-mr:Line 12 (Mumbai Metro) https://global.dbpedia.org/id/9Loty |
prov:wasDerivedFrom |
wikipedia-en:Line_12_(Mumbai_Metro)?oldid=1107858058&ns=0 |
foaf:depiction |
wiki-commons:Special:FilePath/Maha_Mumbai_Metro.png |
foaf:isPrimaryTopicOf |
wikipedia-en:Line_12_(Mumbai_Metro) |
foaf:name |
Mumbai Metro Orange Line 12 Extension (en) |
is dbo:wikiPageDisambiguates of |
dbr:Line_12 |
is dbo:wikiPageWikiLink of |
dbr:List_of_automated_train_systems dbr:Mumbai_Metro dbr:Line_1_(Navi_Mumbai_Metro) dbr:Line_5_(Mumbai_Metro) dbr:List_of_Mumbai_Metro_stations dbr:Line_12 |
is foaf:primaryTopic of |
wikipedia-en:Line_12_(Mumbai_Metro) |