Minto Flywheel Facility (original) (raw)

The Minto Flywheel Facility for grid frequency regulation was the first in Canada. The 2 MW (for 15 min) flywheel storage facility in Minto Ontario, Canada opened in 2014. The flywheel system (developed by and built by ) uses 10 spinning steel flywheels on magnetic bearings.