The Sărdăneşti Power Station will be one of the largest electricity producers in Romania, having 4 groups of 175 MW each totalling an installed capacity of 700 MW and an electricity generation capacity of around 5.3 TW/year. The power plant will be situated in the Gorj County (South-Western Romania) on the banks of the Jiu River in Sărdăneşti. The construction of the power plant will begin in 2009 and it will be finished in 2013 at a total cost of US$ 1.3 billion. (en) |
dbo:installedCapacity |
700000000.000000 (xsd:double) |
dbo:location |
dbr:Gorj_County |
dbo:owner |
dbr:Energy_Holding |
dbo:status |
Approved |
dbo:wikiPageID |
18644660 (xsd:integer) |
dbo:wikiPageLength |
1664 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID |
968523151 (xsd:integer) |
dbo:wikiPageWikiLink |
dbr:Romania dbc:Coal-fired_power_stations_in_Romania dbr:List_of_power_stations_in_Romania dbr:1,000,000,000_(number) dbc:Proposed_coal-fired_power_stations dbr:Electricity dbr:Gorj_County dbr:Sub-bituminous_coal dbr:US$ dbr:Watt dbc:Proposed_power_stations_in_Romania dbr:Terawatt dbr:Plopșoru dbr:Jiu_River dbr:Power_plant dbr:Energy_Holding |
dbp:location |
dbr:Gorj_County |
dbp:name |
Sărdăneşti Power Plant (en) |
dbp:owner |
dbr:Energy_Holding |
dbp:psElectricalCapacity |
700.0 (dbd:megawatt) |
dbp:psUnitsOperational |
4 (xsd:integer) |
dbp:status |
Approved (en) |
dbp:thFuelPrimary |
dbr:Sub-bituminous_coal |
dbp:wikiPageUsesTemplate |
dbt:Coord_missing dbt:Portal dbt:Reflist dbt:Short_description dbt:Update dbt:Infobox_power_station dbt:Power_stations_in_Romania dbt:Powerstation-stub dbt:Romania-struct-stub |
dct:subject |
dbc:Coal-fired_power_stations_in_Romania dbc:Proposed_coal-fired_power_stations dbc:Proposed_power_stations_in_Romania |
rdf:type |
owl:Thing dbo:Infrastructure wikidata:Q159719 yago:WikicatCoal-firedPowerStationsInRomania dbo:ArchitecturalStructure yago:Artifact100021939 yago:Facility103315023 yago:Object100002684 yago:PhysicalEntity100001930 yago:PowerStation103996655 yago:YagoGeoEntity yago:YagoPermanentlyLocatedEntity dbo:PowerStation yago:Station104306080 yago:Whole100003553 yago:WikicatProposedCoal-firedPowerStations yago:WikicatProposedPowerStationsInRomania |
rdfs:comment |
The Sărdăneşti Power Station will be one of the largest electricity producers in Romania, having 4 groups of 175 MW each totalling an installed capacity of 700 MW and an electricity generation capacity of around 5.3 TW/year. The power plant will be situated in the Gorj County (South-Western Romania) on the banks of the Jiu River in Sărdăneşti. The construction of the power plant will begin in 2009 and it will be finished in 2013 at a total cost of US$ 1.3 billion. (en) |
rdfs:label |
Sărdănești Power Station (en) |
owl:sameAs |
freebase:Sărdănești Power Station wikidata:Sărdănești Power Station https://global.dbpedia.org/id/4w2q9 |
prov:wasDerivedFrom |
wikipedia-en:Sărdănești_Power_Station?oldid=968523151&ns=0 |
foaf:isPrimaryTopicOf |
wikipedia-en:Sărdănești_Power_Station |
foaf:name |
Sărdăneşti Power Plant (en) |
is dbo:wikiPageRedirects of |
dbr:Sardanesti_Power_Station dbr:Sărdăneşti_Power_Station |
is dbo:wikiPageWikiLink of |
dbr:Sardanesti_Power_Station dbr:Sărdăneşti_Power_Station |
is foaf:primaryTopic of |
wikipedia-en:Sărdănești_Power_Station |