The Sabuncubeli Tunnel (Turkish: Sabuncubeli Tüneli) is a road tunnel located on the Mount Sipylus (Turkish: Spil Dağı) in Aegean Region as part of the Manisa-Izmir highway D.565 E881 in Turkey. Situated near Kocakara village in the northeast and Beşyol village of Bornova district in the southwest on the province border of Manisa and Izmir, the twin-tube tunnel is 4,070 m (13,350 ft) long carrying two lanes of traffic in each direction. In 2011, the Manisa-Izmir route had a daily traffic rate of 30,000 vehicles. The tunnel is being built to bypass the steep and twisty route at , reducing the grade of highway from 7–8% to 1.5%. When completed, it will shorten the travel time between Manisa and Izmir from 45 minutes to 15 minutes, and will contribute to elimination of traffic congestion in

thumbnail

Property Value
dbo:Infrastructure/length 4.085 (dbd:kilometre)
dbo:abstract The Sabuncubeli Tunnel (Turkish: Sabuncubeli Tüneli) is a road tunnel located on the Mount Sipylus (Turkish: Spil Dağı) in Aegean Region as part of the Manisa-Izmir highway D.565 E881 in Turkey. Situated near Kocakara village in the northeast and Beşyol village of Bornova district in the southwest on the province border of Manisa and Izmir, the twin-tube tunnel is 4,070 m (13,350 ft) long carrying two lanes of traffic in each direction. In 2011, the Manisa-Izmir route had a daily traffic rate of 30,000 vehicles. The tunnel is being built to bypass the steep and twisty route at , reducing the grade of highway from 7–8% to 1.5%. When completed, it will shorten the travel time between Manisa and Izmir from 45 minutes to 15 minutes, and will contribute to elimination of traffic congestion in the winter time. The contract for the building of the tunnel was awarded to Koçoğlu and Makimsan Consortium on the build-operate-transfer basis, and was signed on August 18, 2011. It was projected that the 2,800 m (9,200 ft)-long tunnel was to be finished within three years costing ₺110 million. The groundbreaking ceremony took place in presence of Minister of Transport, Maritime and Communication Binali Yıldırım on September 9, 2011. The construction works were suspended for seven months right after the groundbreaking in order to undertake a revision in the tunnel project. The new project featured the extension of the tunnel length from initially planned 2.8 km (1.7 mi) to 4,070 m (13,350 ft), and a lesser road grade than of previously designed. The tunnel runs in average 150 m (490 ft) underground with a maximum depth of 250 m (820 ft). Excavation works continue at a daily rate of 1.5 m (4.9 ft) with a total of 150 personnel. The estimated cost was revised to ₺150 million. A landslide, which occurred in the western tube on the northeast portal during the excavation works in 2013, caused the lengthening of the tunnel to now 6,480 m (21,260 ft), and hence a delay in the construction's completion. The tunnel opening is postponed from 2015 to end 2016 but it did not open. The constructing company had the concession to operate the tunnel for a time span of 11 years 11 months and 11 days after its opening, and to collect the Turkish lira equivalent of US$2.50 as toll but it went bankrupt. The tunnel opened on 11 June 2018. Turkish Prime Minister Binali Yıldırım was the first one who drove in the tunnel. (en)
dbo:length 4085.000000 (xsd:double)
dbo:location dbr:Bornova dbr:Manisa_Province dbr:Izmir_Province
dbo:numberOfLanes 2 (xsd:nonNegativeInteger)
dbo:operator dbr:General_Directorate_of_Highways_(Turkey)
dbo:owner dbr:General_Directorate_of_Highways_(Turkey)
dbo:speedLimit 80.000000 (xsd:double)
dbo:status Operational
dbo:thumbnail wiki-commons:Special:FilePath/Tunnel.png?width=300
dbo:wikiPageID 42523592 (xsd:integer)
dbo:wikiPageLength 9796 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID 1117093543 (xsd:integer)
dbo:wikiPageWikiLink dbr:Binali_Yıldırım dbr:Bornova dbr:Build-operate-transfer dbr:General_Directorate_of_Highways_(Turkey) dbr:Mount_Sipylus dbr:Fault_(geology) dbc:Transport_in_Manisa_Province dbc:Transport_in_İzmir_Province dbr:Turkish_lira dbr:Aegean_Region dbc:Manisa dbc:Tunnels_completed_in_2018 dbr:Earthquake dbc:Bornova_District dbr:Engineering_Geology dbr:Ministry_of_Transport,_Maritime_and_Communication_(Turkey) dbr:Tunnel dbr:Dokuz_Eylül_University dbr:Manisa_Province dbr:Izmir_Province dbr:Sabuncubeli_Pass
dbp:caption Location of Sabuncubeli Tunnel in Turkey (en)
dbp:character Twin-tube highway tunnel (en)
dbp:construction Koçoğlu and Makimsan Consortium (en)
dbp:grade 1.5 (dbd:perCent)
dbp:label Sabuncubeli Tunnel (en)
dbp:lanes 2 (xsd:integer)
dbp:lat 38.545278 (xsd:double)
dbp:length and (en)
dbp:location Karakoca, Manisa, Manisa Province – Beşyol, Bornova, Izmir Province (en)
dbp:long 27.301667 (xsd:double)
dbp:mark Tunnel.png (en)
dbp:name Sabuncubeli Tunnel (en) (Sabuncubeli Tüneli) (en)
dbp:opened 2018-06-11 (xsd:date)
dbp:operator General Directorate of Highways (en)
dbp:owner dbr:General_Directorate_of_Highways_(Turkey)
dbp:position right (en)
dbp:relief yes (en)
dbp:speed 80.0 (dbd:kilometrePerHour)
dbp:startwork 2011-09-09 (xsd:date)
dbp:status Operational (en)
dbp:toll Free (en)
dbp:traffic automotive (en)
dbp:width 250 (xsd:integer)
dbp:wikiPageUsesTemplate dbt:Convert dbt:Coord dbt:Jct dbt:Location_map dbt:Reflist dbt:Short_description dbt:Start_date_and_age dbt:Turkish_lira dbt:Use_dmy_dates dbt:Infobox_tunnel dbt:Tunnels_in_Turkey
dct:subject dbc:Transport_in_Manisa_Province dbc:Transport_in_İzmir_Province dbc:Manisa dbc:Tunnels_completed_in_2018 dbc:Bornova_District
gold:hypernym dbr:Tunnel
georss:point 38.54527777777778 27.301666666666666
rdf:type owl:Thing dbo:Infrastructure dbo:RouteOfTransportation wikidata:Q2354973 yago:WikicatBuildingsAndStructuresInIzmirProvince yago:WikicatBuildingsAndStructuresInManisaProvince yago:WikicatBuildingsAndStructuresUnderConstructionInTurkey geo:SpatialThing dbo:ArchitecturalStructure yago:Artifact100021939 yago:Building102913152 yago:Object100002684 yago:PhysicalEntity100001930 yago:YagoGeoEntity yago:YagoPermanentlyLocatedEntity dbo:RoadTunnel yago:Structure104341686 yago:Whole100003553
rdfs:comment The Sabuncubeli Tunnel (Turkish: Sabuncubeli Tüneli) is a road tunnel located on the Mount Sipylus (Turkish: Spil Dağı) in Aegean Region as part of the Manisa-Izmir highway D.565 E881 in Turkey. Situated near Kocakara village in the northeast and Beşyol village of Bornova district in the southwest on the province border of Manisa and Izmir, the twin-tube tunnel is 4,070 m (13,350 ft) long carrying two lanes of traffic in each direction. In 2011, the Manisa-Izmir route had a daily traffic rate of 30,000 vehicles. The tunnel is being built to bypass the steep and twisty route at , reducing the grade of highway from 7–8% to 1.5%. When completed, it will shorten the travel time between Manisa and Izmir from 45 minutes to 15 minutes, and will contribute to elimination of traffic congestion in (en)
rdfs:label Sabuncubeli Tunnel (en)
owl:sameAs freebase:Sabuncubeli Tunnel yago-res:Sabuncubeli Tunnel wikidata:Sabuncubeli Tunnel dbpedia-tr:Sabuncubeli Tunnel https://global.dbpedia.org/id/4nrQi
geo:geometry POINT(27.301666259766 38.545276641846)
geo:lat 38.545277 (xsd:float)
geo:long 27.301666 (xsd:float)
prov:wasDerivedFrom wikipedia-en:Sabuncubeli_Tunnel?oldid=1117093543&ns=0
foaf:depiction wiki-commons:Special:FilePath/Tunnel.png
foaf:isPrimaryTopicOf wikipedia-en:Sabuncubeli_Tunnel
foaf:name Sabuncubeli Tunnel (en) (Sabuncubeli Tüneli) (en)
is dbo:wikiPageWikiLink of dbr:Parti_Pehlivan dbr:Mount_Sipylus dbr:Conurbation dbr:List_of_tunnels_in_Turkey