The Shuakhevi Hydro Power Plant (Skuakhevi HPP) is a run-of-the-river plant in Adjara, Georgia. Construction on the project began in 2013 and was completed in June 2017. It has an installed capacity of 187 megawatts (251,000 hp) with expected electricity output of 452 gigawatt-hours (1,630 TJ). The plant has the capacity for diurnal storage in two reservoirs (22-metre (72 ft) Skhalta dam with a 19.4-hectare (48-acre) reservoir and 39-metre (128 ft) Didachara dam with a 16.9-hectare (42-acre) reservoir), allowing Shuakhevi HPP to store water for up to 12 hours and sell electricity at peak demand times. Three main tunnels were constructed on the Shuakhevi project; the 5.8 km Chirukhistsqali to Skhalta transfer tunnel, the 9.1 kilometres (5.7 mi) Skhalta to Didachara transfer tunnel and the 1

Property Value
dbo:abstract The Shuakhevi Hydro Power Plant (Skuakhevi HPP) is a run-of-the-river plant in Adjara, Georgia. Construction on the project began in 2013 and was completed in June 2017. It has an installed capacity of 187 megawatts (251,000 hp) with expected electricity output of 452 gigawatt-hours (1,630 TJ). The plant has the capacity for diurnal storage in two reservoirs (22-metre (72 ft) Skhalta dam with a 19.4-hectare (48-acre) reservoir and 39-metre (128 ft) Didachara dam with a 16.9-hectare (42-acre) reservoir), allowing Shuakhevi HPP to store water for up to 12 hours and sell electricity at peak demand times. Three main tunnels were constructed on the Shuakhevi project; the 5.8 km Chirukhistsqali to Skhalta transfer tunnel, the 9.1 kilometres (5.7 mi) Skhalta to Didachara transfer tunnel and the 17.8 km Shuakhevi headrace and pressure tunnel. It is estimated that the project will cost US$417 million. For the purposes of developing, constructing and operating the Shuakhevi HPP, ADB and EBRD extended a loan to Adjaristsqali Georgia LLC of up to $86.5 million and IFC a loan of 80m USD. Adjaristsqali Georgia LLC is owned by the Norwegian Clean Energy Invest AS (40%), India's Tata Power (40%) and IFC Infraventures (20%), an investment fund created by the International Finance Corporation. Alstom was chosen to supply the electromechanical equipment for the project. (en) ГЕС Шуахеві — гідроелектростанція у південно-західній частині Грузії. Знаходячись перед Аджаріс-Цкальською ГЕС (16 МВт), становить верхній ступінь у каскаді на річці Аджарисцкалі, яка дренує північний схил Арсіанського хребта та є правою притокою Чорохі (впадає до Чорного моря у місті Батумі). Для збору ресурсу облаштували кілька об'єктів на Аджарісцкалі та її лівих притоках Чірукітскалі і Скхалта: - бетонну гравітаційну водозабірну греблю висотою 7 метрів на лівій притоці Аджарісцкалі річці Чірукітскалі; - тунель довжиною 6,3 км з діаметром 4,2 метра та пропускною спроможністю 10 м3/с від Чірукітскалі до іншої лівої притоки Аджарісцкалі річки Скхалта (на цьому етапі працює мала ГЕС Скхалта з підземним машинним залом та трьома турбінами потужністю по 3 МВт); - кам'яно-накидну греблю з бетонним ядром висотою 17 метрів на Схалті, яка утримує водосховище з площею поверхні 0,12 км2 та об'ємом 748 тис. м3; - тунель довжиною 9,2 км з діаметром 5,2 метра та пропускною спроможністю 25 м3/с від Скхалта до Аджарісцкалі; - бетонну греблю висотою 52 метри на Аджарісцкалі, яка утримує водосховище Дідачара з площею поверхні 0,15 км2 та об'ємом 998 тис. м3. Від сховища Дідачара ресурс подається через прокладений у правобережному гірському масиві головний дериваційний тунель довжиною 17,8 км з діаметром 6,2 метра та пропускною спроможністю 48 м3/с. Наземний машинний зал станції Шуахеві обладнали двома турбінами типу Френсіс потужністю по 89,3 МВт. При напорі у 396 метрів вони повинні забезпечувати виробництво 470 млн кВт-год електроенергії на рік. Видача продукції відбувається по ЛЕП, розрахованій на роботу під напругою 220 кВ. Інвесторами проекту через компанію Adjaristskali Georgia є індійська Tata Power, норвезька Clean Energy та група міжнародних фінансових інституцій. Основне обладнання замовили у філії французького концерну Alstom із Вадодари (штат Гуджарат). Введення станції у експлуатацію прийшлось на 2017 рік. (uk)
dbo:wikiPageExternalLink https://english.caucasianjournal.org/2020/03/bjorn-brandtzaeg-as-georgia-develops-it.html/
dbo:wikiPageID 43390294 (xsd:integer)
dbo:wikiPageLength 9312 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID 1068760568 (xsd:integer)
dbo:wikiPageWikiLink dbr:Property_tax dbr:Protest dbr:Electricity_generation dbr:Energy_in_Georgia_(country) dbr:Mott_MacDonald dbr:Batumi dbr:River_ecosystem dbr:Investment dbr:Investment_fund dbr:List_of_power_stations_in_Georgia_(country) dbr:Peak_demand dbr:Contract dbr:Corporate_governance dbr:Corporate_social_responsibility dbr:Electricity dbr:Energy dbr:Georgia_(country) dbr:Municipality dbr:Confidentiality dbr:Dam dbr:Demand dbr:Employment dbr:Population dbr:Strategy dbr:Tariff dbr:Business dbc:Run-of-the-river_power_stations dbr:Turkey dbc:Dams_in_Georgia_(country) dbc:Hydroelectric_power_stations_in_Georgia_(country) dbr:Landslide dbr:Adjara dbr:Akhaltsikhe_Municipality dbr:Alstom dbr:European_Bank_for_Reconstruction_and_Development dbr:Special_forces dbr:Private_sector dbr:Project dbr:Reservoir dbr:Run-of-the-river_hydroelectricity dbr:International_Finance_Corporation dbr:Tata_Power dbr:Hydropower dbr:Asian_Development_Bank dbr:Trout dbr:Policemen dbr:Population_transfer dbr:Financial_compensation dbr:Warranty dbr:Water dbr:Export dbr:State_budget dbr:Economic_profitability dbr:EBRD dbr:Installed_capacity dbr:River_flow
dbp:wikiPageUsesTemplate dbt:Convert dbt:Coord dbt:Portal dbt:Reflist
dcterms:subject dbc:Run-of-the-river_power_stations dbc:Dams_in_Georgia_(country) dbc:Hydroelectric_power_stations_in_Georgia_(country)
gold:hypernym dbr:Plant
georss:point 41.6576 42.3497
rdf:type geo:SpatialThing dbo:Plant
rdfs:comment The Shuakhevi Hydro Power Plant (Skuakhevi HPP) is a run-of-the-river plant in Adjara, Georgia. Construction on the project began in 2013 and was completed in June 2017. It has an installed capacity of 187 megawatts (251,000 hp) with expected electricity output of 452 gigawatt-hours (1,630 TJ). The plant has the capacity for diurnal storage in two reservoirs (22-metre (72 ft) Skhalta dam with a 19.4-hectare (48-acre) reservoir and 39-metre (128 ft) Didachara dam with a 16.9-hectare (42-acre) reservoir), allowing Shuakhevi HPP to store water for up to 12 hours and sell electricity at peak demand times. Three main tunnels were constructed on the Shuakhevi project; the 5.8 km Chirukhistsqali to Skhalta transfer tunnel, the 9.1 kilometres (5.7 mi) Skhalta to Didachara transfer tunnel and the 1 (en) ГЕС Шуахеві — гідроелектростанція у південно-західній частині Грузії. Знаходячись перед Аджаріс-Цкальською ГЕС (16 МВт), становить верхній ступінь у каскаді на річці Аджарисцкалі, яка дренує північний схил Арсіанського хребта та є правою притокою Чорохі (впадає до Чорного моря у місті Батумі). Для збору ресурсу облаштували кілька об'єктів на Аджарісцкалі та її лівих притоках Чірукітскалі і Скхалта: - бетонну гравітаційну водозабірну греблю висотою 7 метрів на лівій притоці Аджарісцкалі річці Чірукітскалі; Видача продукції відбувається по ЛЕП, розрахованій на роботу під напругою 220 кВ. (uk)
rdfs:label Shuakhevi Hydro Power Plant (en) ГЕС Шуахеві (uk)
owl:sameAs freebase:Shuakhevi Hydro Power Plant yago-res:Shuakhevi Hydro Power Plant wikidata:Shuakhevi Hydro Power Plant dbpedia-ka:Shuakhevi Hydro Power Plant dbpedia-uk:Shuakhevi Hydro Power Plant https://global.dbpedia.org/id/4nE1T
geo:geometry POINT(42.349700927734 41.657600402832)
geo:lat 41.657600 (xsd:float)
geo:long 42.349701 (xsd:float)
prov:wasDerivedFrom wikipedia-en:Shuakhevi_Hydro_Power_Plant?oldid=1068760568&ns=0
foaf:isPrimaryTopicOf wikipedia-en:Shuakhevi_Hydro_Power_Plant
is dbo:wikiPageRedirects of dbr:Shuakhevi_hydro_power_plant
is dbo:wikiPageWikiLink of dbr:Environmental_issues_in_Georgia_(country) dbr:List_of_longest_tunnels dbr:CEE_Bankwatch_Network dbr:Shuakhevi_hydro_power_plant
is foaf:primaryTopic of wikipedia-en:Shuakhevi_Hydro_Power_Plant