Swansea Barrage (original) (raw)

Property Value
dbo:abstract The Swansea barrage (or the Tawe barrage) was completed in 1992 creating a new marina at the mouth of the River Tawe extending the leisure boat facilities already being offered by the old South Dock. The barrage structure includes a boat lock, spillway, fish pass and generator turbine. The turbine serves a dual use: acting as a power generator for the National Grid as well as being used to pump water back into the Tawe river system. The barrage scheme gave rise to a number of environmental concerns. Fish navigation up the river and dissolved oxygen levels were problems that arose after completion. Salt water that came in at high spring tides sank to the bottom and stayed there, reducing oxygen levels. The was commissioned to undertake an aeration scheme trial in the River Tawe in the summer of 1998. The system was based on a diffuser design and propeller mixer, which proved highly effective at exporting the saltwater from the deep area of the trial site and raising dissolved oxygen concentrations at the bed. Following the success of the trial system a more extensive system was designed for the river for installation in 1999 -2000. The first stage of the installation of the designed system was undertaken in June 1999 and comprised a combination of diffusers and a large propeller mixer. The installation was conducted using a diving team to ensure optimal location of the diffusers within the river channel. The installation will be completed over two years to treat all the problem areas over a 4 kilometres (2.5 mi) long reach of river and ameliorate the poor water quality presented in these areas. Monitoring results from the system installed to date have indicated that aeration has effectively raised the oxygen concentration and assisted in the export of saline water from the system. Following the success of this work the Environmental Advice Centre is currently examining designs for other reaches of tidal river within the United Kingdom that display similar problems. Following the success of the River Tawe aeration scheme the neighbouring Welsh city of Cardiff used the same method to improve the quality of the water in its newly created bay. Other fears that arose with the building of the barrage such as the raising of the water table causing ground subsidence problems in the low-lying areas around the River Tawe. Since completion, no significant subsidence problems have arisen. (en)
dbo:thumbnail wiki-commons:Special:FilePath/Swansea_bay_barrage.jpg?width=300
dbo:wikiPageExternalLink http://www.explore-gower.co.uk/Content/pa=showpage/pid=62.html
dbo:wikiPageID 6247434 (xsd:integer)
dbo:wikiPageLength 3912 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID 1082178925 (xsd:integer)
dbo:wikiPageWikiLink dbr:Cardiff dbc:Tidal_barrages dbr:United_Kingdom dbr:Stream_bed dbr:Electrical_generator dbr:Water_table dbc:Hydroelectric_power_stations_in_Wales dbc:Pumped-storage_hydroelectric_power_stations_in_the_United_Kingdom dbr:Wales dbr:Seawater dbr:Oxygen_saturation dbc:Dams_in_Wales dbc:Buildings_and_structures_in_Swansea dbc:Energy_infrastructure_completed_in_1992 dbc:Dams_completed_in_1992 dbc:Swansea_Bay dbr:Aeration dbr:Tidal_river dbr:Turbine dbr:National_Grid_(UK) dbr:Marina dbr:Saline_water dbr:Water_quality dbr:Fish_ladder dbr:Fish_migration dbr:River_Tawe dbr:Subsidence dbr:Canal_lock dbr:Spillway dbr:File:Swansea_bay_barrage.jpg dbr:Environmental_Advice_Centre
dbp:wikiPageUsesTemplate dbt:Convert dbt:Coord dbt:More_footnotes_needed dbt:Portal dbt:Reflist dbt:Stack dbt:Use_dmy_dates dbt:Energy_in_Wales
dct:subject dbc:Tidal_barrages dbc:Hydroelectric_power_stations_in_Wales dbc:Pumped-storage_hydroelectric_power_stations_in_the_United_Kingdom dbc:Dams_in_Wales dbc:Buildings_and_structures_in_Swansea dbc:Energy_infrastructure_completed_in_1992 dbc:Dams_completed_in_1992 dbc:Swansea_Bay
georss:point 51.616 -3.929
rdf:type yago:WikicatDamsInWales geo:SpatialThing yago:Artifact100021939 yago:Barrier102796623 yago:Dam103160309 yago:Facility103315023 yago:Object100002684 yago:Obstruction103839993 yago:PhysicalEntity100001930 yago:PowerStation103996655 yago:WikicatHydroelectricPowerStationsInWales yago:YagoGeoEntity yago:YagoPermanentlyLocatedEntity yago:Station104306080 yago:Structure104341686 yago:Whole100003553 yago:WikicatPumpedStoragePowerStations
rdfs:comment The Swansea barrage (or the Tawe barrage) was completed in 1992 creating a new marina at the mouth of the River Tawe extending the leisure boat facilities already being offered by the old South Dock. The barrage structure includes a boat lock, spillway, fish pass and generator turbine. The turbine serves a dual use: acting as a power generator for the National Grid as well as being used to pump water back into the Tawe river system. (en)
rdfs:label Swansea Barrage (en)
owl:sameAs freebase:Swansea Barrage yago-res:Swansea Barrage wikidata:Swansea Barrage https://global.dbpedia.org/id/4vSa5
geo:geometry POINT(-3.9289999008179 51.61600112915)
geo:lat 51.616001 (xsd:float)
geo:long -3.929000 (xsd:float)
prov:wasDerivedFrom wikipedia-en:Swansea_Barrage?oldid=1082178925&ns=0
foaf:depiction wiki-commons:Special:FilePath/Swansea_bay_barrage.jpg
foaf:isPrimaryTopicOf wikipedia-en:Swansea_Barrage
is dbo:wikiPageRedirects of dbr:Swansea_barrage dbr:Swansea_bay_barrage dbr:Tawe_barrage dbr:River_Tawe_barrage dbr:Swansea_Bay_barrage
is dbo:wikiPageWikiLink of dbr:Cardiff_Bay_Barrage dbr:List_of_dams_and_reservoirs_in_the_United_Kingdom dbr:1992_in_Wales dbr:Swansea_barrage dbr:Swansea_bay_barrage dbr:River_Tawe dbr:Tawe_barrage dbr:River_Tawe_barrage dbr:Swansea_Bay_barrage
is foaf:primaryTopic of wikipedia-en:Swansea_Barrage