Fuping station (original) (raw)

Shenzhen Metro Line 3 station

Fuping富坪Shenzhen Metro
Platform
Chinese name
Chinese 富坪
TranscriptionsStandard MandarinHanyu PinyinFùpíngYue: CantoneseYale RomanizationFupìngJyutpingFu3ping4
General information
Location Intersection of Fuping North Road (富坪北路) and Zhenxing Road (振兴路)Pingdi Subdistrict, Longgang District, Shenzhen, GuangdongChina
Coordinates 22°46′58.357″N 114°18′21.042″E / 22.78287694°N 114.30584500°E / 22.78287694; 114.30584500
Operated by SZMC (Shenzhen Metro Group)
Line Line 3
Platforms 2 (1 island platform)
Tracks 2
Construction
Structure type Underground
Accessible Yes
History
Opened 28 December 2024 (14 months ago) (2024-12-28)
Services
Preceding station SZM Shenzhen Metro Following station Baishitangtowards Futian Bonded Area Line 3 Pingdi LiulianTerminus
LocationMap

Fuping station (Chinese: 富坪; pinyin: Fùpíng Zhàn; Jyutping: Fu3ping4 Zaam6; Cantonese Yale: Fupìng Jaahm) is a station on Line 3 of Shenzhen Metro. It opened on 28 December 2024,[1] and is located underground in Pingdi Subdistrict in Longgang District.[2]

The station is part of the fourth phase of Line 3 (East Extension).[3][4]

G - Exits
B1FConcourse Lobby Ticket Machines, Customer Service, Shops, Vending Machines
B2FPlatforms Platform arrow for L 3 towards Futian Bonded Area (Baishitang)
Island platform, doors will open on the left
Platform 3 towards Pingdi Liulian (terminus) arrow for R

The station has 4 points of entry/exit, with Exits A and C being accessible via elevators. Exit B has a toilet.

  1. ^ "定了!深圳地铁13号线南段明日开通" [It’s settled! The southern section of Shenzhen Metro Line 13 will open tomorrow]. Shekou News (in Simplified Chinese). 27 December 2024. Retrieved 19 January 2025.
  2. ^ "深圳地铁3号线东延线近期开建,延至低碳城和坪地" [Shenzhen Metro Line 3 East Extension Line will be built soon, extending to Low Carbon City and Pingdi]. Shenzhen Business Daily (in Simplified Chinese). 28 July 2020. Archived from the original on 8 October 2020. Retrieved 19 January 2025.
  3. ^ "深圳地铁集团党委书记、董事长辛杰参加《民心桥》节目听众问题的落实情况" [The implementation of the audience's questions raised by Xin Jie, Party Secretary and Chairman of Shenzhen Metro Group, on the "Bridge of People's Hearts" program]. Shenzhen Government Online (in Simplified Chinese). 8 September 2020. Archived from the original on 9 October 2020.
  4. ^ "深圳地铁3号线东延"可研"获批!开工在即!建设工期为5年" [Shenzhen Metro Line 3 East Extension "Feasibility Study" approved! Construction is about to start! The construction period is 5 years]. Shenzhen News Network (in Simplified Chinese). 24 July 2020. Archived from the original on 9 October 2020. Retrieved 19 January 2025.