Line 28 (Beijing Subway) (original) (raw)
From Wikipedia, the free encyclopedia
Proposed railway line in Beijing, China
Line 28 | |
---|---|
28 | |
![]() |
|
Overview | |
Other names | M28 (planned name)CBD line |
Status | Under construction[1] |
Locale | Chaoyang districtBeijing |
Termini | DongdaqiaoGuangqudonglu |
Stations | 9 |
Service | |
Type | Rapid Transit |
System | Beijing Subway |
Rolling stock | 6-car Type LB |
History | |
Planned opening | 2029; 4 years' time (2029) (planned)[2] |
Technical | |
Line length | 8.877 km (5.516 mi) (Phase 1)[3] |
Character | Underground |
Operating speed | 80 km/h (50 mph)[3] |
Route map Legend ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a rapid transit line under construction in Beijing. It was formerly known as CBD line.
Construction started in July 2021.[1] It is planned to open in 2029.[2]
| Station Name[4] | Connections | Distancekm | Location | | |
| ------------------------------------------------------------------------------------------------------------------------------- | ----------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | -------- | | ----------------------------------------------------------------------------- |
| English | Chinese | | | | |
| | | | | | |
| Dongdaqiao | 东大桥 | 6 17 Pinggu | | | Chaoyang |
| Jintai Xizhao | 金台夕照 | 10 Pinggu | | | |
| Guanghualu | 光华路 | | | | |
| Hexinqu | 核心区 | | | | |
| Dawang Lu | 大望路 | 1 14 | | | |
| Beijing East railway station | 北京东站 | Sub-Central BOP | | | |
| Dajiaoting | 大郊亭 | 7 | | | |
| Guangqulu | 广渠路 | | | | |
| Guangqudonglu | 广渠东路 | | | | |
| | | | | | |
In August 2015, planning authorities proposed an underground automatic people mover (APM) line through the Central Business District (CBD).[5]
According to the most recent plan announced in August 2019, the line will run 8.877 km (5.516 mi), have 9 stations from Dongdaqiao to Guangqudonglu.[3] The line was redesigned into a higher capacity light metro line, not an automatic people mover (APM).[3]
A feasibility study for the line was approved in October 2020.[4]
Construction started in July 2021.[1]
It will use 6-car Type LB linear motor rolling stock, similar to the Capital Airport Express of Beijing Subway, and Guangzhou Metro's Line 4, Line 5 and Line 6.[1]
- ^ a b c d "北京地铁28号线首站启动建设". 2021-07-27.
- ^ a b "多座车站开工建设,这条下穿CBD的北京地铁线有了新消息". www.bjews.com.cn. 2023-11-18. Archived from the original on 2023-11-19. Retrieved 2023-12-19.
- ^ a b c d "北京地铁28号线最新车站方案公布:5座车站可以换乘". 2019-08-20.
- ^ a b www.bjnews.com.cn. "地铁28号线可行性研究报告批复,纳入今年北京市政府重点工程". www.bjnews.com.cn. Retrieved 2020-10-21.
- ^ Cao Zheng (曹政) (13 August 2015). CBD拟通'地下小火车:初步设8站 呈Z形斜穿'. Beijing Daily. Archived from the original on 26 November 2015. Retrieved 12 November 2015.