Oinoi–Chalcis railway (original) (raw)

From Wikipedia, the free encyclopedia

Railway line in Greece

Oinoi–Chalcis railway
Chalcis railway station in June 2001.
Overview
Status Operational
Owner GAIAOSE[1]
Locale Central Greece, Greece
Termini Oinoi 38°19′21″N 23°36′34″E / 38.3224°N 23.6095°E / 38.3224; 23.6095Chalcis 38°27′46″N 23°35′10″E / 38.4627°N 23.5862°E / 38.4627; 23.5862
Stations 6
Service
Type railway line
Services Athens Suburban Railway Athens Suburban Railway
Operator(s) Hellenic Train
History
Opened 8 March 1904; 120 years ago (1904-03-08)
Technical
Line length 21.69 km (13.48 mi)[2]
Number of tracks Single[2]
Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification 25 kV AC[2]
Operating speed 120 km/h (75 mph) (maximum)
Route map Legend km 21.665 Chalcis Chalcis depot salt marsh Euripus Bridge LaFarge - AGETIraklis Cement 16.282 Chalkis Shipyards 13.390 Steno/Nafpigeia Interchem 11.092 Avlida 8.900 Kalochori-Pantichi 4.220 Agios Georgios 2.050 Dilesi Fourlis Logistics Piraeus–Platy railwayto Thessaloniki Hellenic AerospaceIndustry 0.0)(71.4) Oinoi Piraeus–Platy railwayto Athens This diagram: viewtalkedit

A MAN-2000 DMU train leaves Avlis station towards Chalkis in 2007

The Oinoi–Chalcis railway is an 21.69-kilometre-long (13.48 mi) railway line that connects Oinoi (West Attica) with Chalcis, capital of Euboea in Greece.[2] It is one of the most important railway lines in Central Greece. Its southern terminus is Oinoi, where there are connections to Athens and Thessaloniki.

The southern terminus of the Oinoi-Chalkida line is Oinoi railway station in Oinoi, Boeotia. It is separated from the Athens-Thessaloniki line and follows a branch of approximately 22 kilometres (14 mi). It passes through Kalochori-Panteichi, continuing via Avlida, proceeding north before turning right and ending in Chalcis, in Chalcis, west of the Euripus Strait. The journey time between Athens and Chalcis is around 1 hour and 19 minutes.

The stations on the line are

The Oinoi–Chalcis railway line was opened on 8 March 1904. Construction of the line had been authorized in 1889 by the law AΨΜΕ / 7-4-1889 concerning the construction and operation of the Piraeus-Larissa and Border railway line, but it was started only in 1902 after the foundation of Hellenic State Railways. The inauguration of the line took place on 6 March 1904, along with the construction of the first 121 kilometres (75 mi) of the line, when an official dinner for 400 people was given on the premises of Chalcis railway station, with the presence of three warships, one British, one French and one Greek. The line opened to the traffic two days later on 8 March 1904.

Line 3 of the Athens Suburban Railway operates on the railway, between Athens and Chalcis via Oinoi, calling at all stations except Pyrgos Vasilissis and Kato Acharnes.

  1. ^ "Γαια Οσε". Gaiaose.com. Retrieved 2022-08-31.
  2. ^ a b c d "Network Statement Validity: 2020 ANNEXES". Athens: OSE. Retrieved 17 August 2020.