Bui Power Authority (original) (raw)

#11 Dodi Link, Airport Residential Area, Accra

+233 302 52244/5 info@buipower.com

Select menu item

BPA Holds Annual General Meeting 2024 read more Bui Power Authority (BPA) Wins at the
Internal Audit Conference 2024 read more Bui Power Authority Corporate Affairs Honored
at the 6th National Communication Awards read more Bui Power Authority Honoured at the National
Governance and Business Leadership Awards read more Ministry of Energy bids Farewell to
Hon. Dr. Matthew Opoku Prempeh read more Bui Power Authority Commissions and
Hands Over 6-Unit Classroom Block
to Anloga-Avete D.A Basic School read more BPA Holds Mid-Year Retreat read more Bui Power Authority Engages Investors at the
Africa Energy Forum 2024 in Barcelona, Spain read more BPA Pays Courtesy Call on
National House of Chiefs. read more Cashew Factory Commissioned
within the Bui Enclave read more BPA Commissions Mechanised
Borehole in Jama read more BPA Unveils Military Base in Bui read more BPA holds Annual General Meeting read more BPA secures triple win at 7th
Ghana Energy Awards (2023). read more Bui Power Authority Leads the Way for
Floating Solar Installation in the West African read more Ghana Commissions First Hydro-Solar Hybrid
Generating System and Floating Solar PV read more BPA’s Clean Energy Projects
Will Address Climate Change read more

Renewable Energy Leaders

## Our Portfolio

BPA is exploring renewable energy projects in line with the Government of Ghana's target of increasing Renewable Energy in the country’s energy mix by 10% by 2030 to help achieve the Sustainable Development Goals of the United Nations

WIND POWER

#### WIND POWER

250MWp SOLAR PROJECT

#### 250MWp SOLAR PROJECT

5MWp FLOATING SOLAR

#### 5MWp FLOATING SOLAR

FOREST RESOURCES ENHANCEMENT PROGRAM (FREP)

#### FOREST RESOURCES ENHANCEMENT PROGRAM (FREP)

45kW TSATSADU GENERATING STATION

#### 45kW TSATSADU GENERATING STATION

Bui Power Authority Bui Power Authority

BPA has completed the construction of a 5MWp Floating Solar PV System on the Bui reservoir. It is the first of its kind in the West African sub-region. The floating solar power plant is an innovative approach of using photovoltaic modules on water infrastructures to conserve the land along with increase in efficiency of the module. Additionally, the water is also conserved due to reduction in evaporation of water from the water body. The plant can be installed on a pond, lake, reservoir, or on any other water body. The completion of this project also contributes to delivering on the promise in our National Energy plan to increase the penetration of renewable energy by 10% by 2030. The 5MW Floating Solar plant is also part of the successful implementation of the Bui Hydro-Solar Hybrid (HSH) system, a significant milestone for Ghana within the West African sub-region. This innovative system in addition to the already existing 50MWp land based solar farm is the largest farm so far in Ghana. The combined generation from 404MW hydro plant and 55MWp solar plants, further advances the region’s renewable energy capabilities. Largest Floating Solar Plant in Africa. #floatingsolarplant #renewableenergyleaders YouTube Video UCzvxgu9fuF7vj0WryrqktEw_D-jfLEnSPP4

On November 27, 2020, the Senior Minister, Hon. Yaw Osafo Marfo commissioned Phase One of the 250MW BPA Hydro-Solar Project at the Bui Generating Station (Montage shot by the late renowned Emmanuel Bobbie. May he Rest in Peace). Commissioning of Phase One of the 250MW BPA Hydro-Solar Hybrid Project YouTube Video UCzvxgu9fuF7vj0WryrqktEw_kioiUBjZ6qs

The Bui Power Authority Cashew Factory is breathing new life into the Bono Region. Beyond just producing electricity, it's transforming livelihoods and fostering employment opportunities. BPA Cashew Factory Video YouTube Video UCzvxgu9fuF7vj0WryrqktEw_s7U0h4i-FGQ

The Bui dam is designed to hold water up to elevation 183metres above sea level (masl) as the maximum designed water level. However, as of October 16, 2019, the water level at the Bui Reservoir was 181.78masl with a daily rise of 0.20m per day hence the need for the Controlled Spilling to  spill excess water to acceptable levels to safeguard the structural integrity of the dam and also for effective power generation.  #ControlledSpilling2019 #BuiGeneratingStation #RenewableEnergyLeaders #BPA #ThrowbackThursday 2019 Controlled Spilling - Bui Generating Station YouTube Video UCzvxgu9fuF7vj0WryrqktEw_rVa6hMewmcg

Load More... Subscribe

## News & Events

CSR

### BPA Donates Branded Exercise to BGS Enclave Schools

Latest News

### Bui Power Authority Engages Investors at the Africa Energy Forum 2024 in Barcelona, Spain

CSR

### Bui Power Authority Commissions and Hands Over 6-Unit Classroom Block to Anloga-Avete D.A Basic School

Latest News

### BPA Unveils Military Base in Bui

CSR

### BPA Commissions Mechanised Borehole in Jama

Latest News

### Bui Power Authority holds Annual General Meeting

Latest News

### BPA woos investors at COP28 towards supporting Ghana’s climate change commitments to renewable energy.

Latest News

### Bui Power Authority Secures Triple Win at 7th Ghana Energy Awards 2023

CSR

### Bui Power Authority extends a hand of solidarity to Volta River Authority for Akosombo spillage relief efforts.

Latest News

### Bui Power Authority leads the way for floating solar Installation in the West African Sub-Region

## Our Partners

energy commission

VRA LOGO

Ministry of Energy

Gridco

ecg

© 2024 All Rights Reserved Buipower.com

BPA IT Unit