Details 82902 (original) (raw)

Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
**More Details for 2006-07-06
STS-121 MCC Status Report #05
There is a crew of three aboard the International Space Station today for the first time in more than three years, and for the first time ever that crew includes an American, a Russian and a European.
European Space Agency astronaut Thomas Reiter of Germany was delivered as the newest member of ISS Expedition 13 just hours after Space Shuttle Discovery docked at the station�s Pressurized Mating Adapter 2 at 9:52 a.m. CDT, as the two ships flew above the south Pacific Ocean south of Pitcairn Island.
Commander Steve Lindsey piloted Discovery�s approach to ISS, halting 600 feet directly below the station to perform the rendezvous pitch maneuver: the shuttle was commanded to do a nose-over-tail somersault so ISS Commander Pavel Vinogradov and Flight Engineer Jeff Williams could photograph the thermal protection system tiles on the orbiter�s underside. Imagery experts on the ground will study the high-resolution still pictures for evidence of any damage to the insulating tiles.
Lindsey and his crew�Pilot Mark Kelly and Mission Specialists Mike Fossum, Lisa Nowak, Stephanie Wilson, Piers Sellers and Reiter�greeted the station crewmembers when the hatches between the vehicles were opened at 11:30 a.m. CDT.
After Vinogradov�s safety briefing for the shuttle crew, he helped Reiter install his customized Soyuz seat liner into the Russian rescue vehicle and check his pressurized Sokol suit, finalizing Reiter�s transfer from Discovery to ISS. Other first-day transfers from Discovery included the spacesuits that Sellers and Fossum will wear on their spacewalks out of the Quest airlock on Flight Days 5 and 7.
In preparation for the first EVA, Nowak, Wilson and Williams lifted the Orbiter Boom Sensor System with the station�s robotic arm and handed it over to the shuttle�s robotic arm. During the first spacewalk Sellers and Fossum will simulate orbiter repair tasks while attached to the OBSS/shuttle arm combination to test that 100-foot-long construction crane as a work platform.
On the second spacewalk the astronauts will deliver a spare Pump Module to an external stowage platform before replacing a damaged power and data cable reel assembly in the station�s truss. The repair will allow the Mobile Transporter to move along the truss during installation of new truss segments on future shuttle assembly missions.
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2017 Mark Wade - Contact
© / Conditions for Use