The Channel Tunnel Rail Link (or CTRL) is a project to construct a 108 km high speed rail line from London to the British end of the Channel Tunnel. When it is completed it will be possible to reach Paris from St Pancras in 2hrs 15mins and Brussels in 2hrs.
Background
A high-speed rail track has been in operation on the French and Belgian sections of the Eurostar rail link since the Channel Tunnel's opening, carrying trains at 300km/h. In Britain trains have had to share existing standard track with local traffic, limiting average speeds to 100km/h. In addition, the generally poor state of Britain's rail infrastructure has caused frequent and unpredictable delays.
The project
Section 1 of the CTRL, a 74km section of high-speed track from the Channel Tunnel to Fawkham Junction in north Kent, was opened in September 2003. This cut the London-Paris journey time by around 20 minutes to 2hrs 35mins. The section includes a 1.2km bridge over the River Medway and 3.2km-long, 12m-diameter tunnel through the North Downs. In safety testing on the section prior to opening, a new UK rail speed record of 334.7km/h was set. Trains continue to use existing suburban lines to enter London, and terminate at London Waterloo, on the south side of central London.
Section 2 of the project, due to open in 2007, is a 34km stretch of track from Fawkham Junction to London St Pancras. It includes two new stations (at Ebbsfleet and London Stratford), a 3km tunnel under the Thames near Dartford, and a 19km twin tunnel running into central London. When the second phase of the CTRL is opened, most Eurostar trains will run to St Pancras although a few will continue to run to Waterloo.
Engineering notes
- The CTRL project is in 2003 one of Britain's largest civil engineering projects, encompassing new bridges and tunnels as well as many kilometres of track.
- The track itself is essentially a product of the engineering expertise of the French railway company SNCF, operator of existing TGV high-speed lines in France.
- The twin tunnel being bored under London is being driven from Stratford (westwards towards St Pancras and eastwards towards Dagenham) and from Dagenham (westwards to connect with the tunnel from Stratford). The tunnel boring machines are 120m long and weigh 1,100 tonnes. The depth of the tunnel varies from 24m to 50m.
- At St Pancras station a new extension will double the length and number of platforms to accommodate the Eurostar trains.
Additional information
After local protests, early plans were modified to put much more of the track in tunnel where it nears St Pancras. The CTRL building works are causing considerable disruption, but bringing in their wake much redevelopment of the run-down area of post-industrial and ex-railway land close to Kings Cross and St Pancras.
The project is due to be completed in 2007.
See also: High speed rail, Eurostar, TGV, British railway system
External links
- CTRL company site with photos, progress reports etc.
- www.railway-technology.com/projects/chunnel/
- Guardian Unlimited Interactive Guide to the CTRL (requires Flash)