Planning for the installation is a critical phase of any project as it involves coordinating activites of many people and companies. The best way to keep everything straight is to develop a checklist based on the design path. This is comprehensive but each project may have some of its own unique requirements that need to be added to the list.
Pre-install checklist:
- Main point of contact/project manager chosen
- Link communications requirements set
- Equipment and component requirements set and vendors chosen
- Link route chosen, permits obtained
- Cable plant components and vendors chosen
- Coordination with facilities and electrical personnel complete
- Documentation completed and ready for installation, preliminary restoration plans ready
- Test plan complete
- Schedule and start date set for installation, all parties notified
- Components ordered and delivery date set, plans made for receiving materials (time, place,) arrange security if left outside or on construction site
- Contractor/installer chosen and start date set
- Link route tour with contractor(s)
- Construction plans reviewed with contractor(s)
- Components chosen reviewed with contractor(s)
- Schedule reviewed with contractor(s)
- Safety rules reviewed with contractor(s)
- Excess materials being kept for restoration reviewed with contractor(s)
- Test plan reviewed with contractor(s)
Before starting the install:
- All permits available for inspection
- Sites prepared, power available
- All components on site, inspected, 24-hour security arranged if necessary
- Contractor available
- Relevant personnel notified
- Safety rules posted on the job site(s) and reviewed with all supervisors and installation personnel
During The Installation:
- Inspect workmanship
- Daily review of process, progress, test data
- Immediate notification and solution of problems, shortages, etc.
After completion of cable plant installation:
- Inspect workmanship
- Review test data on cable plant
- Set up and test communications system
- Update and complete documentation
- Update and complete restoration plan
- Store restoration plan, documentation, components, etc.