Indianapolis International Airport: New RON Parking Apron (original) (raw)
Abstract
The Indianapolis International Airport was at capacity for overnight aircraft parking at the terminal gates and the existing terminal apron. The solution required the design and construction of a new remain overnight (RON) parking apron with space for up to seven commercial aircrafts simultaneously. The project entailed extensive utility relocations, grading and drainage, concrete and asphalt paving, and airfield electrical. Join us for a discussion of the construction challenges and successes.
Session Title
Indianapolis International Airport: RON Parking Project and Risk Management for Airfield Pavement
Date of Version
March 2024
Start Date
3-13-2024 9:00 AM
End Date
3-13-2024 9:50 AM
DOWNLOADS
Since May 17, 2024
COinS
Mar 13th, 9:00 AM Mar 13th, 9:50 AM
Indianapolis International Airport: New RON Parking Apron
STEW 218 CD
The Indianapolis International Airport was at capacity for overnight aircraft parking at the terminal gates and the existing terminal apron. The solution required the design and construction of a new remain overnight (RON) parking apron with space for up to seven commercial aircrafts simultaneously. The project entailed extensive utility relocations, grading and drainage, concrete and asphalt paving, and airfield electrical. Join us for a discussion of the construction challenges and successes.