US 33 Over Blue River: ABC’s With Steel (original) (raw)
- Brandon Arnold, USI Consultants, Inc.
- Kurt Heidenreich, Engineering Resources, Inc.
- Stephanie Wagner, INDOTFollow
Abstract
The US 33 over the Blue River Bridge Replacement project is the first INDOT project of its kind, and a great example of Accelerated Bridge Construction (ABC). The project used prefabricated steel beam modular super- structure units with prefabricated substructure units, approach slabs, terminal joints, and “steel-like” UHPC for the 8-inch closure pours. Correcting the substan- dard roadway superelevation added complexity to the design and detailing. Join us to learn more.
Session Title
US 33 Over Blue River: ABC’s With Steel
Date of Version
March 2024
Start Date
3-12-2024 11:00 AM
End Date
3-12-2024 11:50 AM
DOWNLOADS
Since May 17, 2024
COinS
Mar 12th, 11:00 AM Mar 12th, 11:50 AM
US 33 Over Blue River: ABC’s With Steel
CL50 224
The US 33 over the Blue River Bridge Replacement project is the first INDOT project of its kind, and a great example of Accelerated Bridge Construction (ABC). The project used prefabricated steel beam modular super- structure units with prefabricated substructure units, approach slabs, terminal joints, and “steel-like” UHPC for the 8-inch closure pours. Correcting the substan- dard roadway superelevation added complexity to the design and detailing. Join us to learn more.