A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning (original) (raw)

References

  1. Akcali, E., Cetinkaya, S.: Quantitative models for inventory and production planning in closed-loop supply chains. Int. J. Prod. Res. 49(8), 2373–2407 (2011)
    Article Google Scholar
  2. Bertsekas, D.P.: Constrained Optimization and Lagrangian Multiplier Methods. Academic Press, New York (1982)
    MATH Google Scholar
  3. Chen, M., Abrishami, P.: A mathematical model for production planning in hybrid manufacturing–remanufacturing systems. Int. J. Adv. Manuf. Technol. 71(5–8), 1187–1196 (2014)
    Article Google Scholar
  4. Chen, Z.L., Li, S.L., Tirupati, D.: A scenario-based stochastic programming approach for technology and capacity planning. Comput. Oper. Res. 29(7), 781–806 (2002)
    Article MathSciNet MATH Google Scholar
  5. Fleischmann, M., BloemhofRuwaard, J.M., Dekker, R., et al.: Quantitative models for reverse logistics: a review. Eur. J. Oper. Res. 103(1), 1–17 (1997)
    Article MATH Google Scholar
  6. Han, S.H., Dong, M.Y., Lu, S.X., et al.: Production planning for hybrid remanufacturing and manufacturing system with component recovery. J. Oper. Res. Soc. 64(10), 1447–1460 (2013)
    Article Google Scholar
  7. Hsu, C.I., Li, H.C.: An integrated plant capacity and production planning model for high-tech manufacturing firms with economies of scale. Int. J. Prod. Econ. 118(2), 486–500 (2009)
    Article Google Scholar
  8. Kaya, O., Bagci, F., Turkay, M.: Planning of capacity, production and inventory decisions in a generic reverse supply chain under uncertain demand and returns. Int. J. Prod. Res. 52(1), 270–282 (2014)
    Article Google Scholar
  9. Kenne, J.P., Dejax, P., Gharbi, A.: Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain. Int. J. Prod. Econ. 135(1), 81–93 (2012)
    Article Google Scholar
  10. Lage, M., Godinho, M.: Production planning and control for remanufacturing: literature review and analysis. Prod. Plan. Control 23(6), 419–435 (2012)
    Article Google Scholar
  11. Li, C.B., Liu, F., Cao, H.J., Wang, Q.L.: A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system. Int. J. Prod. Res. 47(13), 3657–3668 (2009)
    Article MATH Google Scholar
  12. Li, J., Gonzales, M., Zhu, Y.: A hybrid simulation optimization method for production planning of dedicated remanufacturing. Int. J. Prod. Econ. 117(2), 286–301 (2009)
    Article Google Scholar
  13. Li, Y.J., Chen, J., Cai, X.Q.: Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing. Int. J. Prod. Econ. 105(2), 301–317 (2007)
    Article Google Scholar
  14. Liu, S.S., Papageorgiou, L.G.: Multiobjective optimisation of production, distribution and capacity planning of global supply chains in the process industry. Omega 41(2), 369–382 (2013)
    Article Google Scholar
  15. Lusa, A., Matinez-costa, C., Mas-Machura, M.: An integral planning model that includes production, selling price, cash flow management and flexible capacity. Int. J. Prod. Res. 50(6), 1568–1581 (2012)
    Article Google Scholar
  16. Merzifonluoglu, Y., Geunes, J., Romeijn, H.E.: Integrated capacity, demand, and production planning with subcontracting and overtime options. Nav. Res. Logist. 54(4), 433–447 (2007)
    Article MathSciNet MATH Google Scholar
  17. Naeem, M.A., Dias, D.J., Tibrewal, R., et al.: Production planning optimization for manufacturing and remanufacturing system in stochastic environment. J. Intell. Manuf. 24(4), 717–728 (2013)
    Article Google Scholar
  18. Pan, Z.D., Tang, J.F., Liu, O.: Capacitated dynamic lot sizing problems in closed-loop supply chain. Eur. J. Oper. Res. 198(3), 810–821 (2009)
    Article MathSciNet MATH Google Scholar
  19. Rockafellar, R.T.: Augmented Lagrangians and application of the proximal point algorithm in convex programming. Math. Oper. Res. 1(2), 97–116 (1976)
    Article MathSciNet MATH Google Scholar
  20. Rockafellar, R.T., Wets, R.J.B.: Scenarios and policy aggregation in optimization under uncertainty. Math. Oper. Res. 16(1), 119–147 (1991)
    Article MathSciNet MATH Google Scholar
  21. Shi, J.M., Zhang, G.Q., Sha, J.C.: Optimal production planning for a multi-product closed loop system with uncertain demand and return. Comput. Oper. Res. 38(3), 641–650 (2011)
    Article MathSciNet MATH Google Scholar
  22. Tang, L.X., Che, P., Liu, J.Y.: A stochastic production planning problem with nonlinear cost. Comput. Oper. Res. 39(9), 1977–1987 (2012)
    Article MathSciNet MATH Google Scholar
  23. Tempelmeier, H., Derstroff, M.: A Lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times. Manage. Sci. 42(5), 738–757 (1996)
    Article MATH Google Scholar
  24. vanderLaan, E., Salomon, M.: Production planning and inventory control with remanufacturing and disposal. Eur. J. Oper. Res. 102(2), 264–278 (1997)
    Article MATH Google Scholar
  25. Zanjani, M.K., Nourelfath, M., Ait-Kadi, D.: A scenario decomposition approach for stochastic production planning in sawmills. J. Oper. Res. Soc. 64(1), 48–59 (2013)
    Article Google Scholar
  26. Zhang, J., Liu, X., Tu, Y.L.: A capacitated production planning problem for closed-loop supply chain with remanufacturing. Int. J. Adv. Manuf. Technol. 54(5–8), 757–766 (2011)
    Article Google Scholar

Download references