Serial-batching group scheduling with release times and the combined effects of deterioration and truncated job-dependent learning (original) (raw)
References
Wang, J.B., Jiang, Y., Wang, G.: Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning. Int. J. Adv. Manuf. Technol. 41(11–12), 1221–1226 (2009) Article Google Scholar
Wang, J.B., Gao, W.J., Wang, L.Y., Wang, D.: Single machine group scheduling with general linear deterioration to minimize the makespan. Int. J. Adv. Manuf. Technol. 43, 146–150 (2009) Article Google Scholar
Cheng, T.C.E., Lee, W.-C., Wu, C.-C.: Scheduling problems with deteriorating jobs and learning effects including proportional setup times. Comput. Ind. Eng. 58(2), 326–331 (2010) Article Google Scholar
Kuo, W.-H.: Single-machine group scheduling with time-dependent learning effect and position-based setup time learning effect. Ann. Oper. Res. 196, 349–359 (2012) ArticleMathSciNetMATH Google Scholar
Wang, J.B., Huang, X., Wu, Y.B., Ji, P.: Group scheduling with independent setup times, ready times, and deteriorating job processing times. Int. J. Adv. Manuf. Technol. 60, 643–649 (2012) Article Google Scholar
Yang, S.-J.: Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time. Appl. Math. Model. 37, 2995–3005 (2013) ArticleMathSciNetMATH Google Scholar
Yang, S.-W., Wan, L., Yin, N.: Research on single machine SLK/DIF due window assignment problem with learning effect and deteriorating jobs. Appl. Math. Model. 39, 4593–4598 (2015) ArticleMathSciNet Google Scholar
Wu, C.-C., Wu, W.-H., Hsu, P.-H., Lai, K.: A two-machine flowshop scheduling problem with a truncated sum of processing-times-based learning function. Appl. Math. Model. 36, 5001–5014 (2012) ArticleMathSciNetMATH Google Scholar
He, H., Liu, M., Wang, J.B.: Resource constrained scheduling with general truncated job-dependent learning effect. J. Comb. Optim. (2015). doi:10.1007/s10878-015-9984-5 MATH Google Scholar
Wu, Y.-B., Wang, J.-J.: Single-machine scheduling with truncated sum-of-processing-times-based learning effect including proportional delivery times. Neural. Comput. Appl. 27, 937–943 (2016) Article Google Scholar
Niu, Y.-P., Wang, J., Yin, N.: Scheduling problems with effects of deterioration and truncated job-dependent learning. J. Appl. Math. Comput. 47, 315–325 (2015) ArticleMathSciNetMATH Google Scholar
Wang, J.B., Wang, X.-Y., Sun, L.-H., Sun, L.-Y.: Scheduling jobs with truncated exponential learning functions. Optim. Lett. 7, 1857–1873 (2013) ArticleMathSciNetMATH Google Scholar
Wu, C.-C., Yin, Y., Cheng, S.-R.: Single-machine and two-machine flowshop scheduling problems with truncated position-based learning functions. J. Oper. Res. Soc. 64, 147–156 (2013) Article Google Scholar
Pei, J., Liu, X., Pardalos, P.M., Migdalas, A., Yang, S.: Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine. J. Glob. Optim. 67(1), 251–262 (2017) ArticleMathSciNetMATH Google Scholar
Pei, J., Pardalos, P.M., Liu, X., Fan, W., Yang, S.: Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan. Eur. J. Oper. Res. 244(1), 13–25 (2015) ArticleMathSciNetMATH Google Scholar
Pei, J., Liu, X., Pardalos, P.M., Fan, W., Yang, S.: Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times. Ann. Oper. Res. 249, 175–195 (2017) ArticleMathSciNetMATH Google Scholar
Pei, J., Liu, X., Pardalos, P.M., Li, K., Fan, W., Migdalas, A.: Single-machine serial-batching scheduling with a machine availability constraint, position-dependent processing time, and time-dependent set-up time. Optim. Lett. (2016). doi:10.1007/s11590-016-1074-9 MATH Google Scholar
Xuan, H., Tang, L.X.: Scheduling a hybrid flowshop with batch production at the last stage. Comput. Oper. Res. 34(9), 2718–2733 (2007) ArticleMATH Google Scholar
Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation indeterministic sequencing and scheduling: a survey. Ann. Discret. Math. 5, 287–326 (1979) ArticleMATH Google Scholar
Wang, L., Ni, H., Yang, R., Pardalos, P.M., Du, X., Fei, M.: An adaptive simplified human learning optimization algorithm. Inf. Sci. 320, 126–139 (2015) ArticleMathSciNet Google Scholar
Xia, H., Li, X., Gao, L.: A hybrid genetic algorithm with variable neighborhood search for dynamic integrated process planning and scheduling. Comput. Ind. Eng. 102, 99–112 (2016) Article Google Scholar
Borges, P., Eid, T., Bergseng, E.: Applying simulated annealing using different methods for the neighborhood search in forest planning problems. Eur. J. Oper. Res. 233(3), 700–710 (2014) ArticleMathSciNetMATH Google Scholar
Liang, X., Li, W., Zhang, Y., Zhou, M.: An adaptive particle swarm optimization method based on clustering. Soft Comput. 19(2), 431–448 (2015) Article Google Scholar