Optimal design of flood-control multi-reservoir system on a watershed scale (original) (raw)
Acanal N, Yurtal R, Haktanir T (2000) Multi-stage flood routing for gated reservoirs and conjunctive optimization of hydroelectricity income with flood losses. J Hydrol Sci 45(5):675–688 Article Google Scholar
Afshar A, Barkhordary A, Marino MA (1994) Optimizing river diversion under hydraulic and hydrologic uncertainties. J Water Resour Plan Manag ASCE 120(1):36–47 Article Google Scholar
Afshar A, Sharifi F, Jalali MR (2009a) Non-dominated archiving multi-colony ant algorithm for multi-objective optimization: Application to multi-purpose reservoir operation. Eng Optim 41(4):313–325 Article Google Scholar
Afshar A, Rasekh A, Afshar MH (2009b) Risk-based optimization of large flood-diversion systems using genetic algorithms. Eng Optim 41(3):259–273 Article Google Scholar
ASCE Task Committee on Evolutionary Computation in Environmental and Water Resources Engineering (2009) State of the art for genetic algorithms and beyond in water resources planning and management. J Water Resour Plan Manag ASCE. doi:10.1061/(ASCE)WR.1943-5452.0000053
Atiquzzaman M, Liong S-Y, Yu X (2006) Alternative decision making in water distribution network with NSGA-II. J Water Resour Plan Manag 132(2):122–126 Article Google Scholar
Bialas WF, Loucks DP (1978) Nonstructural floodplain planning. J Water Resour Res 14(1):67–74 Google Scholar
Bureau of Technical Affairs and Standards (2001) Basic computational measures in economic analysis of water resources projects. No. 215, Management and Planning Organization, Ministry of Energy, Islamic Republic of Iran
Chang LC (2008) Guiding rational reservoir flood operation using penalty-type genetic algorithm. J Hydrol 354:65–74 Article Google Scholar
Cheng CT, Chau KW (2004) Flood control management system for reservoirs. Environ Model Softw 19:1141–1150 Article Google Scholar
Cheng C, Hsu N, Wei C (2008) Decision-tree analysis on optimal release of reservoir storage under typhoon warnings. J Nat Hazard 44:65–84. doi:10.1007/s11069-007-9142-1 Article Google Scholar
Corry M, Jones J, Thompson D (1980) The design of encroachments of floodplains using risk analysis. Hydraulic Engineering Circular, No. 17, Department of Transportation, Federal Highway Administration, Washington, DC
Davis D, Faber BA, Stedinger JR (2008) USACE experience in implementing risk analysis for flood damage reduction projects. J Contemp Water Res Edu 140:3–14 Article Google Scholar
Deb K, Agrawal S, Pratap A, Meyarivan T (2000) A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization: NSGA-II. KANGALRep. No. 200001
FEMA (1998) Homeowner’s guide for retrofitting, six ways to protect your house from flooding, June 1998, Federal emergency management agency, Mitigation Directorate, 500 C Street, SW., Washington, DC 20472
Ganoulis J (2003) Risk-based floodplain management: a case study from Greece. Int J River Basin Manag 1(1):41–47 (IAHR & INBO) Article Google Scholar
Golian S, Saghafian B, Elmi M, Maknoon R (2011) Probabilistic rainfall thresholds for flood forecasting: evaluating different methodologies for modeling rainfall spatial dependence. Hydrol Process 25:2046–2055 Article Google Scholar
Green CH, Parker DJ, Tunstall SM (2000) Assessment of flood control and management options. World Commission on Dams, Flood Hazard Research Centre, Middlesex University, 19 June 2000
Karaboga D, Bagis A, Haktanir T (2007) Controlling spillway gates of dams by using fuzzy logic controller with optimum rule number. Appl Soft Comput J. doi:10.1016/j.asoc.2007.01.004
Karamouz M, Abesi O, Moridi A, Ahmadi A (2008) Development of optimization schemes for floodplain management; A case study. J Water Resour Manag. doi:10.1007/s11269-008-9350-9
KGS Group (2000) Red River Basin-stage-damage curves update and preparation of flood damage maps. Report prepared for international joint commission, Winnipeg, Manitoba, Canada
Kumar DN, Baliarsingh F, Raju KS (2010) Optimal reservoir operation for flood control using folded dynamic programming. Water Resour Manag 24:1045–1064 Article Google Scholar
Li Y, Zhou J, Zhang Y, Qin H, Liu L (2010) Novel multi objective shuffled frog leaping algorithm with application to reservoir flood control operation. J Water Resour Plan Manag ASCE 136(2):217–226 Article Google Scholar
Malekmohammadi B (2010) Optimal operation model for river-reservoir systems based on flood risk management. PhD thesis, Faculty of civil engineering, Tehran University, Iran
Malekmohammadi B, Zahraie B, Kerachian R (2009) A real-time operation optimization model for flood management in river-reservoir systems. Nat Hazards 53:459–482. doi:10.1007/s11069-009-9442-8 Article Google Scholar
Messner F, Meyer V (2005) Flood damage, vulnerability and risk perception—challenges for flood damage research. UFZ Discussion Papers
Messner F, Penning-Rowsell E, Green C, Meyer V, Tunstall S, Veen D (2007) Evaluating flood damages: guidance and recommendations on principles and models. Sixth framework programme for European research and technological development, integrated project flood site, Document Reference T09-06-01
Morin TL, Meier WL, Nagaraj KS (1989) Dynamic programming for flood control planning: the optimal mix of adjustments to flood. In: Esogbue AO (ed) Dynamic programming for optimal water resources systems analysis. Prentice-Hall, Englewood Cliffs, NJ, pp 286–306
Murty YSR, MurtyBhallamudi S, Srinivasan K (2006) Non-uniform flow effect on optimal waste load allocation in rivers. Water Resour Manag 20(4):509–530 Article Google Scholar
Ngo LL, Madsen H, Rosbjerg D (2007) Simulation and optimization modeling approach for operation of the HoaBinh reservoir, Vietnam. J Hydrol 336:269–281 Article Google Scholar
Niksokhan MH, Kerachian R, Amin P (2009) A stochastic conflict resolution model for trading pollutant discharge permits in river systems. Environ Monit Assess 154:219–232 Article Google Scholar
Penning-Rowsell C, Johnson C, Tunstall S, Tapsell S, Morris J, Chatterton J, Coker A, Green C (2003) The benefits of flood and costal defense techniques. Flood Hazard Research Center, Middlesex University, Enfield Google Scholar
Rasekh A, Afshar A, Afshar MH (2010) Risk-cost optimization of hydraulic structures: methodology and case study. Water Resour Manag. doi:10.1007/s11269-010-9582-3
Reddy MJ, Kumar DN (2007) Multi-objective differential evolution with application to reservoir system optimization. J Comput Civ Eng ASCE 21(2):136–146 Article Google Scholar
Reed PM, Minsker BS (2004) Striking the balance: long-term groundwater monitoring design for conflicting objectives. J Water Resour Plan Manag ASCE 130(2):140–149 Article Google Scholar
Sadeghi SHR, Jalili KH, Nikkami D (2009) Land use optimization in watershed scale. Land Use Policy 26:186–193 Article Google Scholar
Tung YK (1987) Effects of uncertainties on optimal risk-based design of hydraulic structures. J Water Resour Plan Manag ASCE 113(5):709–722 Article Google Scholar
Tung YK, Mays LW (1981) Optimal risk-based design of flood levee systems. J Water Resour Res 17(4):843–852 Article Google Scholar
US Army Corps of Engineers (USACE) (1994) Framework for estimating national economic development benefits and other beneficial effects of flood warning and preparedness systems. Institute for Water Resources, Alexandra, VA
Valeriano OCS, Koike T, Yang K, Yang D (2010) Optimal dam operation during flood season using a distributed hydrological model and a heuristic algorithm. ASCE J Hydrol Eng 15(7):580–586 Google Scholar
Wei C, Hsu N (2008) Multireservoir flood-control optimization with neural-based linear channel level routing under tidal effects. Water Resour Manag 22:1625–1647. doi:10.1007/s11269-008-9246-8 Article Google Scholar
Wei C, Hsu N (2009) Optimal tree-based release rules for real-time flood control operations on a multipurpose multireservoir system. J Hydrol 365:213–224 Article Google Scholar
WRI (2011a) Integrated flood management, case study: Kan basin. Report of hydraulic modeling and flood zoning, Water Research Institute, Ministry of Energy, Iran
WRI (2011b) Integrated flood management, case study: Kan basin. Report of flood vulnerability assessment, Water Research Institute, Ministry of Energy, Iran
WRI (2011c) Integrated flood management, case study: Kan basin. Report of assigning the feasibility of flood mitigation measures. Water Research Institute, Ministry of Energy, Iran
WRI (2011d) Integrated flood management, case study: Kan basin. Report of economical analysis of flood mitigation measures. Water Research Institute, Ministry of Energy, Iran
Yandamuri SRM, Srinivasan K, Bhallamudi SM (2006) Multiobjective optimal waste load allocation models for rivers using nondominated sorting genetic algorithm-II. J Water Resour Plan Manag ASCE 132(3):133–143 Article Google Scholar