Mission reliability estimation of mobile robot system (original) (raw)
Abstract
Reliability analysis of a mobile robot system over a period of 34 months was carried out. Most of the failure modes were identified and the descriptive statistics at component level were calculated. Several theoretical distributions were applied and the best fit of failure data was identified. Furthermore, the reliability, probability density functions and hazard rate modes for all components and the entire system were calculated. It was found out that, (a) the encoder and the tires stand for 73.8 % of all the failures of the mobile robot system, (b) for the mobile robot the time-between-failure ranges from 5 to 2128 h, and (c) the highest reliability is observed at the battery, whereas the lowest reliability is observed at the encoder. The proposed method could be a useful tool towards assessing the current conditions, and predicting reliability for improving the mobile robot maintenance policy, and for helping robot manufacturers to improve the design and operation of the system that they manufacture and operate.
Access this article
Subscribe and save
- Starting from 10 chapters or articles per month
- Access and download chapters and articles from more than 300k books and 2,500 journals
- Cancel anytime View plans
Buy Now
Price excludes VAT (USA)
Tax calculation will be finalised during checkout.
Instant access to the full article PDF.
Similar content being viewed by others
References
- Ascher H, Feingold H (1984) Repairable system reliability: modeling, inference, misconceptions and their causes. Marcel Dekker, New York, Basel
MATH Google Scholar - Barabady J, Kumar U (2008) Reliability analysis of mining equipment: a case study of crushing plan at Jajarm Bauxite mine in Iran. Reliab Eng Syst Saf 93:647–653. doi:10.1016/j.ress.2007.10.006
Article Google Scholar - Bererton C, Khosla P (2002) An analysis of cooperative repair capabilities in a team of robots. In: Proceedings of 2002 IEEE international conference robotics and automation, pp 476-486. doi:10.1109/ROBOT.2002.1013405
- Carlson J, Murphy RR (2003) Reliability analysis of mobile robots. In: Proceedings of the IEEE annual reliability and maintainability symposium (vol 1), pp 274–281. doi:10.1109/ROBOT.2003.1241608
- Carlson J, Murphy RR and Nelson A (2004) Follow up analysis of mobile robot failures. In: Proceedings of the IEEE annual reliability and maintainability symposium 5:4987–4994. doi:10.1109/ROBOT.2004.1302508
- Carreras C, Walker ID (2000) On interval methods applied to robot reliability quantification. Reliab Eng Syst Saf 70(3):291–303. doi:10.1016/S0951-8320(00)00063-6
Article Google Scholar - Cherroun L, Boumehraz M (2014) Path following behavior for an autonomous mobile robot using neuro-fuzzy controller. Int J Syst Assur Eng Manag 5(3):352–360. doi:10.1007/s13198-013-0174-5
Article Google Scholar - Dhillon BS, Anude OC (1993) Robot safety and reliability: a review. Microelectron Reliab 3(3):413–429. doi:10.1016/0026-2714(93)90030-3
Article MathSciNet MATH Google Scholar - Dhillon BS, Fashandi ARM (1997) Robotic system’s probabilistic analysis. Microelectron Reliab 37(2):211–224. doi:10.1016/S0026-2714(96)00074-1
Article Google Scholar - Dhillon BS, Yang N (1996) Availability analysis of a robot with safety system. Microelectron Reliab 36(2):169–177. doi:10.1016/0026-2714(95)00103-9
Article Google Scholar - Foucher B, Das D, Boulie J, Meslet B (2002) A review of reliability prediction methods for electronic devices. Microelectron Reliab 42(8):1155–1162. doi:10.1016/S0026-2714(02)00087-2
Article Google Scholar - Gustafson A, Schunnesson H, Kumar U (2015) Reliability analysis and comparison between automatic and manual load haul dump machines. Qual Reliab Eng Int 31:523–531. doi:10.1002/qre.1610
Article Google Scholar - Hoshino S, Seki H, Ota J (2011) Optimal maintenance strategy in fault-tolerant multi-robot systems. In: IEEE/RSJ international conference on intelligent robots and systems, September 25–30, pp 2314–2320. doi:10.1109/IROS.2011.6094528
- Khodabandehloo K (1996) Analysis of robot systems using fault and event trees: case studies. Reliab Eng Syst Saf 53(3):247–264. doi:10.1016/S0951-8320(96)00052-X
Article Google Scholar - Kumar A, Sharma SP, Kumar D (2007) Robot reliability using Petri nets and fuzzy lambda-tau Methodology. In: Proceeding of the 3rd international conference on reliability and safety engineering, Udaipur, pp 517–521
- Kumar N, Borm J-H, Kumar A (2012) Reliability analysis of waste clean-up manipulator using genetic algorithms and fuzzy methodology. Comput Oper Res 39:310–319. doi:10.1016/j.cor.2011.04.005
Article MathSciNet MATH Google Scholar - MIL-HDBK-189 (1981) Relibility growth management. Headquartes, US Army Communication Research and Development Command, ATTN: DRDCO-PT, Fort Monmouth, NJ, USA
- MIL-HDBK-338B (1998) Electronic Reliability Design Handbook. Department of Defense, USA, pp 44–97
- Nourbakhsh I (2003) The mobot museum robot installations: a five year experiment. In: Proceedings of the IEEE/RSJ IROS 2003 workshop on robots in exhibitions, pp 14–19. doi:10.1109/IROS.2003.1249720
- Philip A, Sharma RK (2013) A stochastic reward net approach for reliability analysis of a flexible manufacturing module. Int J Syst Assur Eng Manag 4(3):293–302. doi:10.1007/s13198-013-0175-4
Article Google Scholar - Rausand M, Høyland A (2004) System reliability theory, models, statistical methods, and applications. Wiley Series in Probability and Statistics, pp 35–74
- Rigdon SE, Basu AP (2000) Statistical methods for the reliability of repairable systems. Wiley, New York, pp 73–110
MATH Google Scholar - Sharma SP, Sukavanam N, Kumar N, Kumar A (2010) Reliability analysis of complex robotic system using Petri nets and fuzzy lambda-tau methodology. Eng Comput 27(3):354–364. doi:10.1108/02644401011029925
Article MATH Google Scholar - Sharma SP, Kumar D, Kumar A (2012) Reliability analysis of complex multi-robotic system using GA and fuzzy methodology. Appl Soft Comput 12:405–415. doi:10.1016/j.asoc.2011.08.031
Article Google Scholar - Stancliff SB, Dolan JM, Trebi-Ollenu A (2006) Mission reliability estimation for repairable robot teams. Int J Adv Rob Syst 3(2):155–164
Google Scholar - Starr A, Wynne R, Kennedy I (1999) Failure analysis of mature robots in automated production. In Proceedings of the institution of mechanical engineers-part B (J Eng Manuf) 213:813–824. doi:10.1243/0954405991517245
- Tomatis N, Terrien G, Piguet R, Burnier D, Bouabdallah S, Siegwart R (2002) Design and system integration for the expo.02 robot. In: Proceedings of the IEEE/RSJ IROS 2002 workshop on robots in exhibitions, pp 67–72
- Tsarouhas P (2012) Reliability, availability, and maintainability (RAM) analysis in food production lines: a review. Int J Food Sci Technol 47(11):2243–2251. doi:10.1111/j.1365-2621.2012.03073.x
Article Google Scholar - Tsarouhas PH (2014a) Maintainability analysis in the yogurt industry. Int J Syst Assur Eng Manag. doi:10.1007/s13198-014-0254-1
Google Scholar - Tsarouhas PH (2014b) Application of statistical approaches for analyzing the reliability and maintainability of food production lines: a case study of mozzarella cheese. In: Granato D, Ares G (eds) Mathematical and statistical methods in food science and technology. Wiley, New York, pp 491–510
Google Scholar - Tsarouhas PH, Arvanitoyannis IS (2014) Yogurt production line: reliability analysis. Prod Manuf Res 2(1):11–23. doi:10.1080/21693277.2014.881268
Google Scholar - Tsarouhas P, Fourlas G (2014) Reliability analysis of the mobile robot: a case study. In: International conference on mechanical engineering (ME’14), Venice, Italy, March 15–17, 1:151–155
- Tsarouhas PH, Fourlas G (2015) Reliability and maintainability analysis of a robotic system for industrial applications: a case study. Int J Perform Eng 11(5):453–462
Google Scholar - Vagenas N, Runciman N, Clement SR (1997) A methodology for maintenance analysis of mining equipment. Int J Surf Min Reclam Environ 11(1):33–40. doi:10.1080/09208119708944053
Article Google Scholar - Wang H, Pham H (2006) Reliability and optimal maintenance. Springer-Verlag London Limited, London Limited, NJ, USA
MATH Google Scholar
Author information
Authors and Affiliations
- Department of Supply Chain Management and Logistics, Technological Educational Institute of Central Macedonia, Kanellopoulou 2, 60100, Katerini, Greece
Panagiotis H. Tsarouhas - Department of Informatics and Computer Technology, Technological Education Institute of Lamia, 3rd Km Old National Road Lamia Athens, 35100, Lamia, Greece
George K. Fourlas
Authors
- Panagiotis H. Tsarouhas
- George K. Fourlas
Corresponding author
Correspondence toPanagiotis H. Tsarouhas.
Rights and permissions
About this article
Cite this article
Tsarouhas, P.H., Fourlas, G.K. Mission reliability estimation of mobile robot system.Int J Syst Assur Eng Manag 7, 220–228 (2016). https://doi.org/10.1007/s13198-015-0408-9
- Received: 07 August 2015
- Revised: 14 November 2015
- Published: 11 January 2016
- Issue date: June 2016
- DOI: https://doi.org/10.1007/s13198-015-0408-9