Comparative Analysis of Two Fuzzy Modeling Through Investigation of Condensate System (original) (raw)

References

  1. Gupta, S.: Stochastic modelling and availability analysis of a critical engineering system. Int. J. Qual. Reliab. Manag. 36(5), 782–796 (2019)
    Article Google Scholar
  2. Tanaka, H., Fan, L.T., Lai, F.S., Toguchi, K.: Fault-tree analysis by fuzzy probability. IEEE Trans. Reliab. 32(5), 453–457 (1983)
    Article MATH Google Scholar
  3. Arora, N., Kumar, D.: Availability analysis of steam and power generation systems in the thermal power plant. Microelectron. Reliab. 37(5), 795–799 (1997)
    Article Google Scholar
  4. Arora, N., Kumar, D.: Stochastic analysis and maintenance planning of ash handling system in thermal power plant. Microelectron. Reliab. 37(5), 819–834 (2000)
    Article Google Scholar
  5. Knezevic, J., Odoom, E.R.: Reliability modelling of repairable systems using Petri nets and fuzzy Lambda-Tau methodology. Reliab. Eng. Syst. Saf. 73(1), 1–17 (2001)
    Article Google Scholar
  6. Wang, P., Coit, D.W., et al.: Repairable systems reliability trend tests and evaluation. In: Annual Reliability and Maintainability Symposium. 2005. Proceedings., Alexandria, VA, USA, pp. 416–421 (2005)
  7. Fodor, J., Bede B.: Arithmetics with fuzzy numbers: a comparative overview. Proceeding of 4th Slovakian-Hungarian joints (2006)
  8. Sharma, R.K., Kumar, D., Kumar, P.: Modeling system behavior for risk and reliability analysis using KBARAM. Qual. Reliab. Eng. Int. 23(8), 973–998 (2007)
    Article Google Scholar
  9. Saraswat, S., Yadava, G.S.: An overview on reliability, availability, maintainability and supportability (RAMS) engineering. Int. J. Qual. Reliab. Manag. 25(3), 330–344 (2008)
    Article Google Scholar
  10. Zio, E.: Reliability engineering: Old problems and new challenges. Reliab. Eng. Syst. Saf. 94(2), 125–141 (2009)
    Article Google Scholar
  11. Sharma, R.K., Sharma, P.: Computing RAM indices for reliable operation of production systems. Adv. Prod. Eng. Manag. 7(4), 245–254 (2012)
    Google Scholar
  12. Garg, H.: Performance and behavior analysis of repairable industrial systems using vague Lambda-Tau methodology. Appl. Soft Comput. 22, 323–328 (2014)
    Article Google Scholar
  13. Panchal, D., Kumar, D.: Reliability analysis of CHU system of a coal fired thermal power plant using fuzzy λ-τ approach. In: 12th Global Congress on Manufacturing and Management, Procedia Engineering, Vol. 97, pp. 2323–2332 (2014)
  14. Garg, H.: An approach for analyzing the reliability of industrial system using Fuzzy Kolmogorov’s differential equations. Arab. J. Sci. Eng. 40, 975–987 (2015)
    Article MATH Google Scholar
  15. Panchal, D., Kumar, D.: Stochastic behaviour analysis of power generating unit in thermal power plant using fuzzy methodology. Oper. Res. Soc. India 53(1), 16–40 (2016)
    MATH Google Scholar
  16. Dhiman, P., Garg, H.: Reliability analysis of an industrial system using improved arithmetic operations. Master’s thesis. School of Mathematics, Thapar University Patiala, India (2016)
  17. Panchal, D., Kumar, D.: Risk analysis of compressor house unit in thermal power plant using integrated fuzzy FMEA and GRA approach. Int. J. Ind. Syst. Eng. 25(2), 228–250 (2017)
    Google Scholar
  18. Komal, K.: Fuzzy reliability analysis of the washing system in a paper plant using the TBFLT technique. Int. J. Qual. Reliab. Manag. 34(8), 1352–1372 (2017)
    Article Google Scholar
  19. Panchal, D., Srivastva, P.: Qualitative analysis of CNG dispensing system using fuzzy FMEA–GRA integrated approach. Int. J. Syst. Assur. Eng. Manag. 10(1), 44–56 (2018)
    Article Google Scholar
  20. Panchal, D., Mangala, S., Tyagi, M., Mange, R.: Risk analysis for clean and sustainable production in a urea fertilizer industry. Int. J. Qual. Reliab. Manag. 35(7), 1459–1476 (2018)
    Article Google Scholar
  21. Garg, H.: Analysis of an industrial system under uncertain environment by using different types of fuzzy numbers. Int. J. Syst. Assur. Eng. Manag. 9(2), 525–538 (2018)
    Article Google Scholar
  22. Choudhary, D., Tripathi, M., Shankar, R.: Reliability, availability and maintainability analysis of a cement plant: a case study. Int. J. Qual. Reliab. Manag. 36(3), 298–313 (2019)
    Article Google Scholar
  23. Panchal, D., Singh, A.K., Chatterjee, P., Zavadskas, E.K., Ghorabaee, M.K.: A new fuzzy methodology-based structured framework for RAM and risk analysis. Appl. Soft Comput. 74, 242–254 (2019)
    Article Google Scholar
  24. Dhiman, P., Kumar, A.: RAM assessment of the repairable industrial structure with genuine human-mistake working conditions with generalized fuzzy numbers. Int. J. Qual. Reliab. Manag. 38(7), 1614–1627 (2020)
    Article Google Scholar
  25. Tsarouhas, P.: Reliability, availability, and maintainability (RAM) study of an ice cream industry. Appl. Sci. 10(12), 4265 (2020)
    Article Google Scholar
  26. Panchal, D., Tyagi, M., Sachdeva, A., Garg, R.K.: Reliability analysis of complex repairable system in thermal power plant. In: Ram, M., Pham, H. (eds.) Advances in Reliability Analysis and its Applications, pp. 361–372. Springer Series in Reliability Engineering, Springer, Cham (2020)
    Chapter Google Scholar
  27. Kowal, K., Tarobi, M.: Failure mode and reliability study for electrical facility of the high temperature engineering. Test Reactor. Reliab. Eng. Syst. Saf. 210, 107529 (2021)
    Article Google Scholar

Download references