Artikel: Construction of Trans-Tokyo Bay Highway (original) (raw)

Titelseiten

1

Vorwort

3

Sonstiges

4

Inhaltsverzeichnis

5

Rubrik: Opening Session

11

Artikel: The swedish road system on the threshold of the 21st century

11

Artikel: IABSE Colloquium "Tunnel strcutures 1998"

20

Rubrik: Session 1: Current and planned projects

21

Artikel: The stockholm urban road tunnels - an overall status report

23

Artikel: Central artery project technical overview

33

Artikel: Construction of Trans-Tokyo Bay Highway

43

Artikel: Optimizing the construction method if a surface tunnel south of Vienna

49

Artikel: A50 Blythe Bridge to Longton - Meir Tunnel

57

Artikel: Planning of tunnel structures for mass rapid transport system, Delhi

63

Rubrik: Session 2A: Structural design - soil and foundation

69

Artikel: Computational model and charts for cut-and-cover tunnels

71

Artikel: Over-crossing concrete tunnels in Arlandabanan

87

Artikel: Underpinning of Red Line South station

93

Artikel: Study on practical application of the MMST method

99

Artikel: Basel's new motorway link to France - tunnel construction under inner-city conditions

105

Artikel: The design of the Øresund tunnel anchored ramps

111

Artikel: Challenging use of immersed tubes in the Fort Point Channel, Boston, MA

117

Artikel: Geotechnical instrumentation supporting central artery construction

125

Artikel: Reliabiility-based design method for cut-and-cover tunnels

131

Rubrik: Session 2B: Structural design - structural engineering

137

Artikel: The Øresund tunnel - "Design and build" in practice

139

Artikel: Design of reinforcement to control cracking due to imposed strains

151

Artikel: Numerical modelling of prefabricated segmental tunnels under embankments

157

Artikel: Development of Wing Segments

163

Artikel: Full scale live load tests on a corrugated steel culvert

169

Artikel: Øresund tunnel - control of early age cracking

175

Artikel: Cut-and-cover tunnels at the Arlanda link

181

Artikel: Evaluation of steel-concrete composite structures applied for multi-micro shield tunnel

187

Artikel: Design of tunnel structures and linings for ice pressure

193

Artikel: The design of the Western Harbour Crossing, Hong Kong

203

Artikel: The design of the Western Immersed Tube Tunnel, Hong Kong

209

Rubrik: Session 3: Fire - prediction and mitigation

215

Artikel: Fire protection in traffic tunnels: resu of EUREKA research project "EU 49 FIRETUN"

217

Artikel: Full-scale fire tests as part of risk analyses

225

Artikel: Probabilistic fire analysis, Limfjordstunnel, Denmark

231

Artikel: Risk analysis and safety concept: Norra and Södra Länken

237

Artikel: Fire safety cheking of tunnels based on probabilistic analysis

245

Artikel: Fire Hazard Mitigation for the Øresund Link Immersed Tunnel

251

Rubrik: Session 4: Security and environmental aspects

263

Artikel: Risk analysis as a tool to determine designe load due to explosion in a tunnel

265

Artikel: Security aspects of the new railway link with Brussels Airport

277

Artikel: Cut-and-cover tunnel a karst environment

289

Artikel: Seismic design for large-scale cut-and-cover tunnels

295

Artikel: Environmental consideratios for highway tunnels

307

Artikel: Ventilation combined with air cleaning technology for particels and NOx for road tunnels

313

Artikel: Managing impacts of ground movement in urban tunneling

319

Artikel: Influence of road enclosure structures on ventialtion

327

Artikel: Hazard and risk analysis in the design and construction of tunnels in carbonate rock mass of the adriatic area

333

Rubrik: Session 5: Construction

341

Artikel: Construction of elements for the Øresund immersed tunnel

343

Artikel: Deep soil-cement mixing for CA/T project

355

Artikel: Discrete supports in submerged tunnels

367

Artikel: Safe backfilling due to finite element precalculations

373

Artikel: Railway tunnel under Sydhavn Station

379

Artikel: Laong distance underpass construction beneath railway

385

Artikel: Advantages of british steel bi-steel in immersed tunnel construction

395

Artikel: Soldier pile tremie concrete walls as part of the final tunnel structure

405

Rubrik: Session 6: Maintenance and repair

413

Artikel: Maintenance and repair : keynote address

415

Artikel: Repair of the Linfjord tunnel, Denmark

431

Artikel: An effective and eternal maintenance method for concrete tunnel structures

439

Artikel: Reconstruction of the Dewey Square tunnel

445

Artikel: The prediction of the costs of maintenance

451

Artikel: Laser scanning for tunnel state assessment

457

Artikel: Concrete pavements in tunnels

469

Artikel: Rehabilitation of two existing tunnels in West Malaysia: a case study

475

Artikel: Rehabilitation work for the upheaval disaster at underground station caused by the groundwater rising

485