(Saltern) APC power limit pass, telecom server prototype fixes by CawsForConcern · Pull Request #2451 · ss14Starlight/space-station-14 (original) (raw)
…out power loads (no APC over 20kW)
- fix: (Saltern) A lot of APC wiring was cleaned up and improved
- fix: (Saltern) SMES and PA that fed the PA / Emitters was hooked up downstream from main SMES bank (now hooked up straight to engine)
- fix: (Saltern) SMES and PA that fed the PA / Emitters was also powering stuff like telecoms, moved that connection to the engineering substation instead