International Journal of Integrated Engineering
Severalmetrics in the supply chain performance assessment system cannot be uncovered by merely pu... more Severalmetrics in the supply chain performance assessment system cannot be uncovered by merely putting a strategy into action. Meanwhile, the balanced scorecard strategynecessitates the incorporation of numerous measures derived from the implementation of strategies,ultimately guidingthe business towardits long-term orientation. The same is true for evaluating the effectiveness of a supply chain. The Business Service Chain (BSC)takes three viewpoints of the Supply Chain Operations Reference (SCOR)and expands them into four: financial, customer, internal business, and innovation and learning. Both the SCORand BSC methods can be utilized to implement a sustainable supply chain management system. These two methodswereemployed to solve supply chain issues in the constructionindustry. BSC aimed to compensate forSCOR’s limited focus on performance by considering two angles—those of internal business operations and customers. When compared to SCOR, BSC’s uniformity in the supply chain allo...
Syntax Literate ; Jurnal Ilmiah Indonesia
A competitive strategy that can be relied upon by construction service providers and consultant s... more A competitive strategy that can be relied upon by construction service providers and consultant services is a quality strategy.. A construction has five overall construction project aspects, that is the cost aspect, the time aspect, the quality aspect, the environmental aspect and the K3 aspect. In the context of construction there are several parts that become the level of quality management, that is Quality Inspection, Quality Control, Quality Assurance, and Total Quality Management. The method used to determine the process of implementing quality management in X construction projects is a qualitative method by reviewing, analyzing project contract documents based on quality aspects and some literature. The results of this study are that each level of quality management in this project is able to apply quality management well by taking into account all the conditions of use and the provisions that apply and have been agreed upon. In X construction projects implement quality planni...
Syntax Literate ; Jurnal Ilmiah Indonesia
Construction projects in the construction sector are often faced with the issue of risk uncertain... more Construction projects in the construction sector are often faced with the issue of risk uncertainty. Risk has significant value because it has a high level of consequences if not properly managed, whether it brings opportunities or results in losses. Effective risk control plays an important role in preventing delays at the time of project implementation. A total of five (5) bridge construction projects were reviewed. Identification based on literature by determining the source of risk. The next step is to obtain answers from risk identification before doing a priority risk analysis, followed by data obtained from the survey questionnaire according to the prescription of 30 respondents. The aim of this study is to identify the priority factors that influence the construction of a bridge project as measured by the size of the presentation value on each risk indicator by the Saverity Index (SI) method by analysing the risk management on the bridge construction project. The results of ...
Risk Management Treatise for Engineering Practitioners, 2018
While project risks are generally acknowledged merely from owner and contractor perspectives, oth... more While project risks are generally acknowledged merely from owner and contractor perspectives, other parties also play important roles in the project. The aim of this study is to analyze the application of risk management in the toll road project from stakeholders' perception, such as contractor, owner, design consultant, supervisory consultant, and community surrounding the project. Data of risk factors were collected through interviews with each stakeholder, including the probability of occurrence and their impacts. Risk Breakdown Structure (RBS) has been adapted to breakdown project risks from various stakeholders. Risk level of each risk factor is obtained by multiplying the probability and the impact. The overall results of risk analysis show various risks as perceived by each stakeholder due to different roles and interests in the project. This research provides an understanding of how project risks need to be fully comprehended for the success of the project.
IOP Conference Series: Earth and Environmental Science, 2021
Construction activities gradually consume energy during their life cycle, namely material extrusi... more Construction activities gradually consume energy during their life cycle, namely material extrusion, transportation, production, assembly line, installation, demolition and disposal. This research aimed to identify research about energy such as embodied and operational energy. Operational energy is energy that is used during building life cycle to decrease global warming effect. This research used a qualitative method to identify and review some literature related to decreased energy construction. This study showed that 98% of researchers focus on energy efficiency in the design, construction and operational stages. Only 2% were investigating at the initiation stage. Some recommendations can be drawn suggesting that energy reduction is possible by applying optimization strategy to all project life cycle (PLC). Initiation and design phase are indirect energy optimization phase through policies and design buildings, which significantly impact energy decrease for further phases. In con...
Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil, 2020
Flood is a disaster that has the biggest threat, in terms of the number of victims or losses. Sem... more Flood is a disaster that has the biggest threat, in terms of the number of victims or losses. Semarang City is a city that is classified as a flood prone area, this is due to the geographical location in the lowlands and highlands. The impact of the flood disaster caused damage and losses from various sectors of public infrastructure including the education service sector and health services. Damage and loss of public infrastructure will burden the government in the post-flood recovery phase. An assessment of infrastructure damage and losses from flooding is needed in order to help the Semarang City Government prepare a budget plan and manage rehabilitation and reconstruction. The purpose of this research is to explore the loss of public infrastructure due to the impact of the flood disaster, so that it can accelerate the post-disaster recovery process and management strategies for the risk of further flood disasters. The valuation method used is ECLAC (Economic Commission for Latin...
Civil Engineering and Architecture, 2021
Green building is a solution to address the impact of buildings on the environment. In its develo... more Green building is a solution to address the impact of buildings on the environment. In its development, green buildings require sustainable green management during the operational and maintenance phase in order to meet the current and future needs of users. As the longest phase in the green building life cycle, it is important to track and map the development of studies related to this field. This paper aims to map the development of literature related to the operational and maintenance phases of sustainable green buildings from 1999 to 2019. Literature data were obtained from the Scopus database and the analysis was conducted using a science mapping approach with VOSviewers. Based on literature data, 746 publications are found to be relevant to this study, the results of this study are in the form of scientific mapping covering wave of research, source and publication types, influential countries, references with strongest citation burst, author contributions, research subjects, an...
The construction industry played a central role in supporting the national economy as a developin... more The construction industry played a central role in supporting the national economy as a developing country and as an archipelago. However, the role of the organization of the construction was not maximized. This is because the function of the organization of materials and construction equipment (MCE) national had not been fully able to be integrated as part of the implementation of the system of national construction and also as part of the national economic system. This condition was due to some functions on the basis of implementation of the MCE which was still part of the institutional authority and regulation of products outside the construction sector (law construction services) as supporting sector. This encouraged researcer to propose a comprehensive study to fill the gap related to the implementation of MCE. The purpose to be achieved in this study was to obtain formulation conceptualization MCE implementation in Indonesia, whereas the objectives to be achieved include: (1) ...
IOP Conference Series: Earth and Environmental Science, 2021
LCA has been utilized over the past two decades to estimate the environmental impacts of pavement... more LCA has been utilized over the past two decades to estimate the environmental impacts of pavement in infrastructures. The purpose of this study is to systematically map research on the use of LCA to calculate energy and emissions in road infrastructure projects. The research method is carried out by a literature review, in terms of systematic mapping study of a number of previous scientific publications, in the form of documents that have been published in international and national journals and proceedings, etc., in the last thirty years. The results show that: The topic of LCA is still an interesting area of research, and the trend from year to year shows an increase in the publication of articles in reputable journals. As much as 57.8% research, using the process based calculation method. Only 15.6% of research calculated energy and emissions in the four completed stages of the project life cycle. As much as 37.5% research compared the flexible and rigid pavement as research obje...
IOP Conference Series: Earth and Environmental Science, 2021
The operation and maintenance phase is one of the most important and longest phase in the green b... more The operation and maintenance phase is one of the most important and longest phase in the green building life cycle. In this phase, the existence of internal support and facilitating that is oriented towards sustainable green management can have a major impact on building performance. Its existence is both a support and a catalyst for other processes to be undertaken during this phase. This study aims to assess the content validity in the preparation of a questionnaire for the assessment instrument for internal support and facilitating of sustainable green management, particularly the operation and maintenance phase of buildings in Indonesia. Internal support and facilitation is divided into 3 key variables in this research: leadership, policy, and people. Meanwhile, the study stage consists of instrument design, expert panel determination, and content validity quantification. The method used in the content validity analysis consists of: I-CVI, S-CVI, CVR and Kappa statistical coeff...
Rapid urban growth has caused an increase of infrastructure and building construction projects in... more Rapid urban growth has caused an increase of infrastructure and building construction projects in recent years in terms of project scale and number. Many of which certainly involve the construction of deep foundation, including pile foundation. In particularly densely populated urban areas, the need for more environmentally friendly pile driving equipment, such as hydraulic static pile driver (HSPD), is therefore inevitable. The aim of this study is to study HSPD productivity in construction project using Artificial Neural Network (ANN). The objective is to produce charts model of HSPD productivity. Data were collected through site observation from four building projects in Semarang and Gresik. Some data also were got through simulation. An ANN model has been designed utilizing 252 data of point piling from the four projects and simulation, i.e. size of driven piles, piling depth, and cycle time. The results show that the productivity of HSPD for driving equilateral triangle 32 cm i...
Operation and maintenance phase is one important part of pavement management system on non-toll n... more Operation and maintenance phase is one important part of pavement management system on non-toll national road (ntNR) because its management cost is relatively high. Therefore, it needs to be managed more optimal. The facts showed, ntNR management practices indicated is poor and inefficient. One of many ways can be used to improve management practices and efficiency of ntNR’s outcome treatment is applying the principle of result accountability that should be accounted for. According to the Law on construction service, the accountability of a facility in operation and maintenance phase can be measured if the pavement condition may be related to clause of building failure. Unfortunately, the Law on construction service related to building failure is still very difficult to implement because the operational restrictions of building failure about pavement is not clearly yet. Besides, the failure category such as PCI (pavement condition index) < 10 is considered less comprehensive beca...
The government procurement of goods and services is expected to be effective and efficient and me... more The government procurement of goods and services is expected to be effective and efficient and meet the principles of healthy competition, transparency, openness, and fairness for all parties involved. By implementing scoring system it is hoped that the principles will be realized in the government goods/services procurement. The set of problems in this research is the minimum use of Scoring System (Scrutinizing List and Passing Grade) in the Goods/Services bid. This leads to the many findings of less-than-minimum-score projects in Temanggung Regency by the Auditing Team. The object being researched is the goods and services auction of budget ceiling below five billion rupiahs. The objectives of the research are: 1) to analyze the difference between elimination system and scoring system in a bid evaluation, 2) to determine the factor most dominantly affecting passing grade and scrutinizing list within the process of choosing the winner for the contracting work, using AHP method, 3) ...
Rapid urban growth has caused an increase of infrastructure and building construction projects in... more Rapid urban growth has caused an increase of infrastructure and building construction projects in recent years in terms of project scale and number. Many of which certainly involve the construction of deep foundation, including pile foundation. In particularly densely populated urban areas, the need for more environmentally friendly pile driving equipment, such as hydraulic static pile driver (HSPD), is therefore inevitable. The aim of this study is to study HSPD productivity in construction project. The objective is to produce charts model of HSPD productivity. Data were collected through site observation from five building projects in Semarang, Surakarta, Pati, and Cepu. Modeling uses analytic, Cyclone simulation, ANN, and regression method. The model has been designed utilizing 150 data of point piling from the five projects and simulation, i.e. size of driven piles, piling depth, and cycle time. Validity, sensitivity, and statistic test been done to derive the best model of HSPD...
International Journal of Engineering and Advanced Technology, 2021
In pavement structures that are often submerged by water, the damage to pavement is often caused ... more In pavement structures that are often submerged by water, the damage to pavement is often caused by the loss of bonds or adhesions between the aggregate and asphalt, the type of damage that occurs due to the loss of adhesion between the aggregate and asphalt is the exfoliation of asphalt granules so that the road is cracked and corrugated. To reduce the release of aggregate granules and improve the bond between aggregates and asphalt can be made with the addition of anti-exfoliating additives or antistripping agent additives. This study aims to analyze the performance of wear-coated concrete asphalt mixture (ACWC) with the addition of antistripping additives. Antistripping agents used in this study were Zycotherm, Morlife and Adhebit with variations of 0.1% addition, 0.3% and 0.5% of the weight of asphalt mixture. The results of this study showed that ACWC mixture with the addition of Zycotherm additives resulted in optimum Marshall stability and increased durability at 0.5% and Adh...
Civil Engineering and Architecture, 2021
The construction industries had a significant role as emission gas contributors through direct ac... more The construction industries had a significant role as emission gas contributors through direct activities, such as the construction process, the operation and demolition of the building, and indirect activities, which is the designing process to decide the types of materials and the shapes of the building. This paper aimed to create an embodied and operational energy assessment concept based on a project life cycle using qualitative methods through a research questionnaire. In the questionnaire, there were 18 indicators based on a literature review relating to embodied and operational energy within the scope of the project life cycle (initiation, design, construction, and operation). Indicator assessment used a Likert scale and was analyzed by Structural Equation Modeling Partial Least Squares. Respondents in this study include consultants, contractors, and stakeholders. The results of the study showed a significant relationship between the initiation and design phases of the construction phase and the operational phase to minimize energy. Stakeholder commitment to the environment and planning that prioritizes energy efficiency (embodied and operational energy) had the highest T-Statistic values of 100.479 and 61.581 with a 95% confidence level. This showed the role of stakeholders and designers is crucial to the reduction in energy embodied and operational during the project life cycle, so that awareness and commitment are needed in realizing green construction.
Civil Engineering and Architecture, 2020
Construction activities consume a lot of energy and produce emissions which damage the environmen... more Construction activities consume a lot of energy and produce emissions which damage the environment. Furthermore, bridge construction is one of the infrastructure buildings which consume the largest amount of energy due to the materials, transportation, and heavy equipment used in the process. It is, however, important to reduce the energy consumed at each stage of the construction in order to ensure a decrease in the environmental impacts. This study was conducted to calculate the total energy consumed in a bridge project and the process was optimized to reduce the amount of energy used in the initiation, design, construction, and operation activities. Data were collected through observations of 3 bridge projects in the Central Java region, Indonesia. Furthermore, a reinforced concrete type of bridge was used and the amount of energy at each stage was determined by multiplying the volume of materials, electricity, and fuel used with the energy coefficient. The results showed the total energy generated in bridge projects 1
IOP Conference Series: Materials Science and Engineering, 2021
The number of road construction projects continues to grow, potentially causing more impacts on t... more The number of road construction projects continues to grow, potentially causing more impacts on the environment. This research analyses the impacts of road construction projects of flexible and rigid pavement by adopting the Life Cycle Impact Assessment (LCIA) approach, and by means of the Eco-Indicator 99 (EI99). The impact values at the production, construction and maintenance stages for the flexible pavement are 86.60 kPt (49.34%), 65.40 (37.26%) and 23.50 kPt (13.39%), while for the rigid pavement equals 47.70 kPt (60.46%), 31.20 (39.54%) and 0 kPt (0%), respectively. It is smaller than the flexible pavement, i.e. 175.50 kPt and 78.9 kPt, respectively. The results of the EI99 show the impact values of the flexible pavement from the aspects of human health, ecosystem quality, and resources are 11.99 kPt (6.83%), 2.17 kPt (1.24%), and 161.40 kPt (91.93%), while for the rigid pavement of 29.49 kPt (37.43%), 37.80 kPt (4.79%), and 45.54 kPt (57.78%), respectively. The total impact v...
Journal of Physics: Conference Series, 2020
While sustainable green infrastructure research has progressed substantially in the last decade, ... more While sustainable green infrastructure research has progressed substantially in the last decade, there has been a lack of study mapping on the developments of existing research publications in this area. This research aims to systematically review and map the development of existing publications during the period of 2009 – 2019 using the Scientometric review approach of Scopus metadata and VOSviewer software. The results show there were 1784 publications and 4894 authors from 109 countries, with the top 3 countries, i.e. the United States (472 publications), the UK (162 publications) and China (151 publications). The top 3 rankings of the main research area trends were green infrastructure (260), sustainability (211), and sustainability development (134). The publications were dominated by articles (50.2%), conference papers (32.2%), book chapters (7%), reviews (7%), and books (6.4%), which consist of 338 open-access documents, and 1396 closed-access documents. The top 3 authors wit...
Journal of Physics: Conference Series, 2020
At the initiation and design stage, the stakeholders (owners and planners) are faced with the cho... more At the initiation and design stage, the stakeholders (owners and planners) are faced with the choice to determine which type of pavement will be used in accordance with the budget provided yet they must also consider for the long-life maintenance and the environmental aspect the of the road pavement project. One indicator of an environmentally friendly road pavement project is that it must be low in energy and low in emissions. The aims of this study are to conduct a literature review to determine the extent of the previous research that have been carried out, as well as the consumption of energy in the construction projects. The results will be used as a basis for developing critical thinking and conceptual frameworks to fill the research gaps and provide novelty for further research. The study was conducted using a qualitative bibliometric analysis method by identifying selected academic publications from Scopus database with the use of VOSviewer software to process the data. The ...
International Journal of Integrated Engineering
Severalmetrics in the supply chain performance assessment system cannot be uncovered by merely pu... more Severalmetrics in the supply chain performance assessment system cannot be uncovered by merely putting a strategy into action. Meanwhile, the balanced scorecard strategynecessitates the incorporation of numerous measures derived from the implementation of strategies,ultimately guidingthe business towardits long-term orientation. The same is true for evaluating the effectiveness of a supply chain. The Business Service Chain (BSC)takes three viewpoints of the Supply Chain Operations Reference (SCOR)and expands them into four: financial, customer, internal business, and innovation and learning. Both the SCORand BSC methods can be utilized to implement a sustainable supply chain management system. These two methodswereemployed to solve supply chain issues in the constructionindustry. BSC aimed to compensate forSCOR’s limited focus on performance by considering two angles—those of internal business operations and customers. When compared to SCOR, BSC’s uniformity in the supply chain allo...
Syntax Literate ; Jurnal Ilmiah Indonesia
A competitive strategy that can be relied upon by construction service providers and consultant s... more A competitive strategy that can be relied upon by construction service providers and consultant services is a quality strategy.. A construction has five overall construction project aspects, that is the cost aspect, the time aspect, the quality aspect, the environmental aspect and the K3 aspect. In the context of construction there are several parts that become the level of quality management, that is Quality Inspection, Quality Control, Quality Assurance, and Total Quality Management. The method used to determine the process of implementing quality management in X construction projects is a qualitative method by reviewing, analyzing project contract documents based on quality aspects and some literature. The results of this study are that each level of quality management in this project is able to apply quality management well by taking into account all the conditions of use and the provisions that apply and have been agreed upon. In X construction projects implement quality planni...
Syntax Literate ; Jurnal Ilmiah Indonesia
Construction projects in the construction sector are often faced with the issue of risk uncertain... more Construction projects in the construction sector are often faced with the issue of risk uncertainty. Risk has significant value because it has a high level of consequences if not properly managed, whether it brings opportunities or results in losses. Effective risk control plays an important role in preventing delays at the time of project implementation. A total of five (5) bridge construction projects were reviewed. Identification based on literature by determining the source of risk. The next step is to obtain answers from risk identification before doing a priority risk analysis, followed by data obtained from the survey questionnaire according to the prescription of 30 respondents. The aim of this study is to identify the priority factors that influence the construction of a bridge project as measured by the size of the presentation value on each risk indicator by the Saverity Index (SI) method by analysing the risk management on the bridge construction project. The results of ...
Risk Management Treatise for Engineering Practitioners, 2018
While project risks are generally acknowledged merely from owner and contractor perspectives, oth... more While project risks are generally acknowledged merely from owner and contractor perspectives, other parties also play important roles in the project. The aim of this study is to analyze the application of risk management in the toll road project from stakeholders' perception, such as contractor, owner, design consultant, supervisory consultant, and community surrounding the project. Data of risk factors were collected through interviews with each stakeholder, including the probability of occurrence and their impacts. Risk Breakdown Structure (RBS) has been adapted to breakdown project risks from various stakeholders. Risk level of each risk factor is obtained by multiplying the probability and the impact. The overall results of risk analysis show various risks as perceived by each stakeholder due to different roles and interests in the project. This research provides an understanding of how project risks need to be fully comprehended for the success of the project.
IOP Conference Series: Earth and Environmental Science, 2021
Construction activities gradually consume energy during their life cycle, namely material extrusi... more Construction activities gradually consume energy during their life cycle, namely material extrusion, transportation, production, assembly line, installation, demolition and disposal. This research aimed to identify research about energy such as embodied and operational energy. Operational energy is energy that is used during building life cycle to decrease global warming effect. This research used a qualitative method to identify and review some literature related to decreased energy construction. This study showed that 98% of researchers focus on energy efficiency in the design, construction and operational stages. Only 2% were investigating at the initiation stage. Some recommendations can be drawn suggesting that energy reduction is possible by applying optimization strategy to all project life cycle (PLC). Initiation and design phase are indirect energy optimization phase through policies and design buildings, which significantly impact energy decrease for further phases. In con...
Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil, 2020
Flood is a disaster that has the biggest threat, in terms of the number of victims or losses. Sem... more Flood is a disaster that has the biggest threat, in terms of the number of victims or losses. Semarang City is a city that is classified as a flood prone area, this is due to the geographical location in the lowlands and highlands. The impact of the flood disaster caused damage and losses from various sectors of public infrastructure including the education service sector and health services. Damage and loss of public infrastructure will burden the government in the post-flood recovery phase. An assessment of infrastructure damage and losses from flooding is needed in order to help the Semarang City Government prepare a budget plan and manage rehabilitation and reconstruction. The purpose of this research is to explore the loss of public infrastructure due to the impact of the flood disaster, so that it can accelerate the post-disaster recovery process and management strategies for the risk of further flood disasters. The valuation method used is ECLAC (Economic Commission for Latin...
Civil Engineering and Architecture, 2021
Green building is a solution to address the impact of buildings on the environment. In its develo... more Green building is a solution to address the impact of buildings on the environment. In its development, green buildings require sustainable green management during the operational and maintenance phase in order to meet the current and future needs of users. As the longest phase in the green building life cycle, it is important to track and map the development of studies related to this field. This paper aims to map the development of literature related to the operational and maintenance phases of sustainable green buildings from 1999 to 2019. Literature data were obtained from the Scopus database and the analysis was conducted using a science mapping approach with VOSviewers. Based on literature data, 746 publications are found to be relevant to this study, the results of this study are in the form of scientific mapping covering wave of research, source and publication types, influential countries, references with strongest citation burst, author contributions, research subjects, an...
The construction industry played a central role in supporting the national economy as a developin... more The construction industry played a central role in supporting the national economy as a developing country and as an archipelago. However, the role of the organization of the construction was not maximized. This is because the function of the organization of materials and construction equipment (MCE) national had not been fully able to be integrated as part of the implementation of the system of national construction and also as part of the national economic system. This condition was due to some functions on the basis of implementation of the MCE which was still part of the institutional authority and regulation of products outside the construction sector (law construction services) as supporting sector. This encouraged researcer to propose a comprehensive study to fill the gap related to the implementation of MCE. The purpose to be achieved in this study was to obtain formulation conceptualization MCE implementation in Indonesia, whereas the objectives to be achieved include: (1) ...
IOP Conference Series: Earth and Environmental Science, 2021
LCA has been utilized over the past two decades to estimate the environmental impacts of pavement... more LCA has been utilized over the past two decades to estimate the environmental impacts of pavement in infrastructures. The purpose of this study is to systematically map research on the use of LCA to calculate energy and emissions in road infrastructure projects. The research method is carried out by a literature review, in terms of systematic mapping study of a number of previous scientific publications, in the form of documents that have been published in international and national journals and proceedings, etc., in the last thirty years. The results show that: The topic of LCA is still an interesting area of research, and the trend from year to year shows an increase in the publication of articles in reputable journals. As much as 57.8% research, using the process based calculation method. Only 15.6% of research calculated energy and emissions in the four completed stages of the project life cycle. As much as 37.5% research compared the flexible and rigid pavement as research obje...
IOP Conference Series: Earth and Environmental Science, 2021
The operation and maintenance phase is one of the most important and longest phase in the green b... more The operation and maintenance phase is one of the most important and longest phase in the green building life cycle. In this phase, the existence of internal support and facilitating that is oriented towards sustainable green management can have a major impact on building performance. Its existence is both a support and a catalyst for other processes to be undertaken during this phase. This study aims to assess the content validity in the preparation of a questionnaire for the assessment instrument for internal support and facilitating of sustainable green management, particularly the operation and maintenance phase of buildings in Indonesia. Internal support and facilitation is divided into 3 key variables in this research: leadership, policy, and people. Meanwhile, the study stage consists of instrument design, expert panel determination, and content validity quantification. The method used in the content validity analysis consists of: I-CVI, S-CVI, CVR and Kappa statistical coeff...
Rapid urban growth has caused an increase of infrastructure and building construction projects in... more Rapid urban growth has caused an increase of infrastructure and building construction projects in recent years in terms of project scale and number. Many of which certainly involve the construction of deep foundation, including pile foundation. In particularly densely populated urban areas, the need for more environmentally friendly pile driving equipment, such as hydraulic static pile driver (HSPD), is therefore inevitable. The aim of this study is to study HSPD productivity in construction project using Artificial Neural Network (ANN). The objective is to produce charts model of HSPD productivity. Data were collected through site observation from four building projects in Semarang and Gresik. Some data also were got through simulation. An ANN model has been designed utilizing 252 data of point piling from the four projects and simulation, i.e. size of driven piles, piling depth, and cycle time. The results show that the productivity of HSPD for driving equilateral triangle 32 cm i...
Operation and maintenance phase is one important part of pavement management system on non-toll n... more Operation and maintenance phase is one important part of pavement management system on non-toll national road (ntNR) because its management cost is relatively high. Therefore, it needs to be managed more optimal. The facts showed, ntNR management practices indicated is poor and inefficient. One of many ways can be used to improve management practices and efficiency of ntNR’s outcome treatment is applying the principle of result accountability that should be accounted for. According to the Law on construction service, the accountability of a facility in operation and maintenance phase can be measured if the pavement condition may be related to clause of building failure. Unfortunately, the Law on construction service related to building failure is still very difficult to implement because the operational restrictions of building failure about pavement is not clearly yet. Besides, the failure category such as PCI (pavement condition index) < 10 is considered less comprehensive beca...
The government procurement of goods and services is expected to be effective and efficient and me... more The government procurement of goods and services is expected to be effective and efficient and meet the principles of healthy competition, transparency, openness, and fairness for all parties involved. By implementing scoring system it is hoped that the principles will be realized in the government goods/services procurement. The set of problems in this research is the minimum use of Scoring System (Scrutinizing List and Passing Grade) in the Goods/Services bid. This leads to the many findings of less-than-minimum-score projects in Temanggung Regency by the Auditing Team. The object being researched is the goods and services auction of budget ceiling below five billion rupiahs. The objectives of the research are: 1) to analyze the difference between elimination system and scoring system in a bid evaluation, 2) to determine the factor most dominantly affecting passing grade and scrutinizing list within the process of choosing the winner for the contracting work, using AHP method, 3) ...
Rapid urban growth has caused an increase of infrastructure and building construction projects in... more Rapid urban growth has caused an increase of infrastructure and building construction projects in recent years in terms of project scale and number. Many of which certainly involve the construction of deep foundation, including pile foundation. In particularly densely populated urban areas, the need for more environmentally friendly pile driving equipment, such as hydraulic static pile driver (HSPD), is therefore inevitable. The aim of this study is to study HSPD productivity in construction project. The objective is to produce charts model of HSPD productivity. Data were collected through site observation from five building projects in Semarang, Surakarta, Pati, and Cepu. Modeling uses analytic, Cyclone simulation, ANN, and regression method. The model has been designed utilizing 150 data of point piling from the five projects and simulation, i.e. size of driven piles, piling depth, and cycle time. Validity, sensitivity, and statistic test been done to derive the best model of HSPD...
International Journal of Engineering and Advanced Technology, 2021
In pavement structures that are often submerged by water, the damage to pavement is often caused ... more In pavement structures that are often submerged by water, the damage to pavement is often caused by the loss of bonds or adhesions between the aggregate and asphalt, the type of damage that occurs due to the loss of adhesion between the aggregate and asphalt is the exfoliation of asphalt granules so that the road is cracked and corrugated. To reduce the release of aggregate granules and improve the bond between aggregates and asphalt can be made with the addition of anti-exfoliating additives or antistripping agent additives. This study aims to analyze the performance of wear-coated concrete asphalt mixture (ACWC) with the addition of antistripping additives. Antistripping agents used in this study were Zycotherm, Morlife and Adhebit with variations of 0.1% addition, 0.3% and 0.5% of the weight of asphalt mixture. The results of this study showed that ACWC mixture with the addition of Zycotherm additives resulted in optimum Marshall stability and increased durability at 0.5% and Adh...
Civil Engineering and Architecture, 2021
The construction industries had a significant role as emission gas contributors through direct ac... more The construction industries had a significant role as emission gas contributors through direct activities, such as the construction process, the operation and demolition of the building, and indirect activities, which is the designing process to decide the types of materials and the shapes of the building. This paper aimed to create an embodied and operational energy assessment concept based on a project life cycle using qualitative methods through a research questionnaire. In the questionnaire, there were 18 indicators based on a literature review relating to embodied and operational energy within the scope of the project life cycle (initiation, design, construction, and operation). Indicator assessment used a Likert scale and was analyzed by Structural Equation Modeling Partial Least Squares. Respondents in this study include consultants, contractors, and stakeholders. The results of the study showed a significant relationship between the initiation and design phases of the construction phase and the operational phase to minimize energy. Stakeholder commitment to the environment and planning that prioritizes energy efficiency (embodied and operational energy) had the highest T-Statistic values of 100.479 and 61.581 with a 95% confidence level. This showed the role of stakeholders and designers is crucial to the reduction in energy embodied and operational during the project life cycle, so that awareness and commitment are needed in realizing green construction.
Civil Engineering and Architecture, 2020
Construction activities consume a lot of energy and produce emissions which damage the environmen... more Construction activities consume a lot of energy and produce emissions which damage the environment. Furthermore, bridge construction is one of the infrastructure buildings which consume the largest amount of energy due to the materials, transportation, and heavy equipment used in the process. It is, however, important to reduce the energy consumed at each stage of the construction in order to ensure a decrease in the environmental impacts. This study was conducted to calculate the total energy consumed in a bridge project and the process was optimized to reduce the amount of energy used in the initiation, design, construction, and operation activities. Data were collected through observations of 3 bridge projects in the Central Java region, Indonesia. Furthermore, a reinforced concrete type of bridge was used and the amount of energy at each stage was determined by multiplying the volume of materials, electricity, and fuel used with the energy coefficient. The results showed the total energy generated in bridge projects 1
IOP Conference Series: Materials Science and Engineering, 2021
The number of road construction projects continues to grow, potentially causing more impacts on t... more The number of road construction projects continues to grow, potentially causing more impacts on the environment. This research analyses the impacts of road construction projects of flexible and rigid pavement by adopting the Life Cycle Impact Assessment (LCIA) approach, and by means of the Eco-Indicator 99 (EI99). The impact values at the production, construction and maintenance stages for the flexible pavement are 86.60 kPt (49.34%), 65.40 (37.26%) and 23.50 kPt (13.39%), while for the rigid pavement equals 47.70 kPt (60.46%), 31.20 (39.54%) and 0 kPt (0%), respectively. It is smaller than the flexible pavement, i.e. 175.50 kPt and 78.9 kPt, respectively. The results of the EI99 show the impact values of the flexible pavement from the aspects of human health, ecosystem quality, and resources are 11.99 kPt (6.83%), 2.17 kPt (1.24%), and 161.40 kPt (91.93%), while for the rigid pavement of 29.49 kPt (37.43%), 37.80 kPt (4.79%), and 45.54 kPt (57.78%), respectively. The total impact v...
Journal of Physics: Conference Series, 2020
While sustainable green infrastructure research has progressed substantially in the last decade, ... more While sustainable green infrastructure research has progressed substantially in the last decade, there has been a lack of study mapping on the developments of existing research publications in this area. This research aims to systematically review and map the development of existing publications during the period of 2009 – 2019 using the Scientometric review approach of Scopus metadata and VOSviewer software. The results show there were 1784 publications and 4894 authors from 109 countries, with the top 3 countries, i.e. the United States (472 publications), the UK (162 publications) and China (151 publications). The top 3 rankings of the main research area trends were green infrastructure (260), sustainability (211), and sustainability development (134). The publications were dominated by articles (50.2%), conference papers (32.2%), book chapters (7%), reviews (7%), and books (6.4%), which consist of 338 open-access documents, and 1396 closed-access documents. The top 3 authors wit...
Journal of Physics: Conference Series, 2020
At the initiation and design stage, the stakeholders (owners and planners) are faced with the cho... more At the initiation and design stage, the stakeholders (owners and planners) are faced with the choice to determine which type of pavement will be used in accordance with the budget provided yet they must also consider for the long-life maintenance and the environmental aspect the of the road pavement project. One indicator of an environmentally friendly road pavement project is that it must be low in energy and low in emissions. The aims of this study are to conduct a literature review to determine the extent of the previous research that have been carried out, as well as the consumption of energy in the construction projects. The results will be used as a basis for developing critical thinking and conceptual frameworks to fill the research gaps and provide novelty for further research. The study was conducted using a qualitative bibliometric analysis method by identifying selected academic publications from Scopus database with the use of VOSviewer software to process the data. The ...