hamed omidi - Academia.edu (original) (raw)
Uploads
Papers by hamed omidi
2009 IEEE Electrical Power & Energy Conference (EPEC), 2009
improvement of the power system economical dispatch from voltage stability margin viewpoint is st... more improvement of the power system economical dispatch from voltage stability margin viewpoint is studied in this paper and for that a methodology is proposed. The considered time interval is short term operation. Active and reactive power (generation) re-dispatch injection is the basis of proposed method and voltage stability will be achieved using generated reactive power by shunt capacitors in power system. This method is implemented via modal analysis with specifying participation factor of generators and Synchronous condensers (units), and shunt capacitors. Using modal index, units with negative impact on voltage stability margin are revealed and penalized with high costs in objective function of the optimal power flow program used to run the re-dispatch process. Results indicate significant improve in voltage stability margin. So, the new method is applied in order to update penalty factor of units. In this research it is assumed that contingency occurred in system does not lead ...
2009 IEEE Electrical Power & Energy Conference (EPEC), 2009
improvement of the power system economical dispatch from voltage stability margin viewpoint is st... more improvement of the power system economical dispatch from voltage stability margin viewpoint is studied in this paper and for that a methodology is proposed. The considered time interval is short term operation. Active and reactive power (generation) re-dispatch injection is the basis of proposed method and voltage stability will be achieved using generated reactive power by shunt capacitors in power system. This method is implemented via modal analysis with specifying participation factor of generators and Synchronous condensers (units), and shunt capacitors. Using modal index, units with negative impact on voltage stability margin are revealed and penalized with high costs in objective function of the optimal power flow program used to run the re-dispatch process. Results indicate significant improve in voltage stability margin. So, the new method is applied in order to update penalty factor of units. In this research it is assumed that contingency occurred in system does not lead ...