sastra wibawa - Academia.edu (original) (raw)
Uploads
Papers by sastra wibawa
Proceedings Series on Physical & Formal Sciences
The construction projects are always faced with the possibility of risk problems. The rapid devel... more The construction projects are always faced with the possibility of risk problems. The rapid development in the Denpasar area is in line with the many construction projects, especially buildings such as hotel construction, construction of new school buildings, etc. For construction projects in Denpasar, risk control is necessary. In this regard, it is necessary to research the Analysis of Risk Factors. This study aimed to determine the dominant risk factors causing construction project delays, mitigation and risk ownership of the dominant risk factors. This research used the quantitative descriptive analysis method. The measuring instrument of this study used a questionnaire and interviews with contractor respondents. Based on the results, the dominant risk analysis was labor risk with an average frequency value of 13.70 and 17.13 consequences. The dominant question from the labor risk variable was the low productivity of the workforce due to lack of experience with a frequency perce...
Proceedings Series on Physical & Formal Sciences
The construction projects are always faced with the possibility of risk problems. The rapid devel... more The construction projects are always faced with the possibility of risk problems. The rapid development in the Denpasar area is in line with the many construction projects, especially buildings such as hotel construction, construction of new school buildings, etc. For construction projects in Denpasar, risk control is necessary. In this regard, it is necessary to research the Analysis of Risk Factors. This study aimed to determine the dominant risk factors causing construction project delays, mitigation and risk ownership of the dominant risk factors. This research used the quantitative descriptive analysis method. The measuring instrument of this study used a questionnaire and interviews with contractor respondents. Based on the results, the dominant risk analysis was labor risk with an average frequency value of 13.70 and 17.13 consequences. The dominant question from the labor risk variable was the low productivity of the workforce due to lack of experience with a frequency perce...