sri sukmawati - Academia.edu (original) (raw)
Uploads
Papers by sri sukmawati
Jurnal Rekayasa Sipil dan Lingkungan, 2019
Roads are a means of transportation that is often used by Indonesians to travel. Some class II ro... more Roads are a means of transportation that is often used by Indonesians to travel. Some class II road segments in Lumajang Regency include Tempeh-Sumberjati, Sumberjati-Karangrejo, Karangrejo-Yosowilangun, and Jalan Lintas Timur. The four sections are collector roads outside the city so that large vehicles often pass. Before handling the road, it must first be assessed on the condition of the pavement. The road surface condition assessment system uses the PCI method and the IRI method. The purpose of this study was to determine the condition of road damage and handling damage to the road so that the maintenance category was obtained. The IRI method is obtained from the Bina Marga Lumajang PU, while the PCI method is done visually. The average results of the four PCI methods are 76.54 with very good conditions and the IRI method is obtained 3.94 with good conditions so that both of these methods produce the same conclusions Maintenance for the PCI method and the IRI method uses routine...
MATRAPOLIS: Jurnal Perencanaan Wilayah dan Kota
Pada Rencana Penetapan Kawasan Strategis, dalam penetapan strategis pengembangan kawasan perekono... more Pada Rencana Penetapan Kawasan Strategis, dalam penetapan strategis pengembangan kawasan perekonomian jalur selatan terdapat wisata pantai. Pantai Watu Pecak memang menawarkan banyak keindahan dan keunikan tersendiri. Partisipasi masyarakat Desa Selok Awar–Awar sangat dibutuhkan dalam meningkatkan jumlah wisatawan di Pantai Watu Pecak. Tujuan dilakukan penelitian adalah untuk mengidentifikasi faktor yang mempengaruhi pengembangan pariwisata Pantai Watu Pecak dalam mendukung sektor kepariwisataan di Kabupaten Lumajang, untuk mengetahui bentuk partisipasi yang dilakukan masyarakat dalam pengembangan Pantai Watu Pecak dan merumuskan strategi pengembangan pariwisata Pantai Watu Pecak di Kabupaten Lumajang. Metode analisis yang digunakan dalam menentukan faktor-faktor adalah Delphi, untuk penentuan bentuk partisipasi masyarakat menggunakan metode Deskriptif, sedangkan dalam penentuan strategi pengembangan wisata dilakukan dengan menggunakan metode SWOT. Berdasarkan hasil analisa, diketa...
Konstruksia, 2021
Proyek Apartemen Grand Shamaya Surabaya merupakan salah satu proyek gedung tinggi di Surabaya yan... more Proyek Apartemen Grand Shamaya Surabaya merupakan salah satu proyek gedung tinggi di Surabaya yang dibangun di atas lahan yang memiliki kondisi tanah yang buruk dan sempit serta berada di antara gedung tinggi yang berdekatan. Pada pekerjaan basemen gedung ini memerlukan metode pelaksanaan yang tepat karena metode pelaksanaan ini sangat berpengaruh terhadap ketercapaian tujuan proyek (biaya, mutu dan waktu). Oleh karena itu perlu adanya analisa yang mendalam dengan mempertimbangkan semua variabel yang berpengaruh dalam penentuan metode konstruksi. Salah satu metode yang dapat diaplikasikan untuk membantu dalam pengambilan keputusan metode konstruksi yang tepat adalah Metode Analytical Hierarchy Process (AHP). Metode ini memiliki kemampuan dalam menyusun skala prioritas (sebagai faktor bobot) dari variabel yang kompleks dan mudah diaplikasikan, sehingga metode ini dapat dijadikan alat untuk pengambilan keputusan penentuan metode konstruksi yang mudah dan cepat. Pengambilan data dilaku...
High Rise Building project has a very high work complexity so that the probability of the risk is... more High Rise Building project has a very high work complexity so that the probability of the risk is enormous. The risks are likely to occur can inhibit the work of the project and can affect costs. It is therefore necessary to risk management to minimize the impacts caused by therisk. This research aims to know the factor dominant risk on construction projects that have an impact on costs. Identification of risk review of aspects of the internal non technical : construction management cost, risk, uncertainty work, terlamba t his project, the uncertainties of material and equipment. The methods used by conducting a detailed questionnaire on the project of High Rise Building. Methods of analysis using the method of Pearson. The dominant risk analysis obtained from the main questionnaire and is calculated based on the method of the concept of Severity Index (SI) as well as the measurement of the value of the level of risk. Analysis on the dominant risk against 12 can cost. The most domin...
The traveler is always looking for the fastest route to reach the destination point. Similarly, g... more The traveler is always looking for the fastest route to reach the destination point. Similarly, guests of the Jember University come from outside the city, especially from the direction of Surabaya and reverse direction. To find the quickest route to the University of Jember, it takes distance and time information throughout the road leading to the campus of University of Jember. Using Dijkstra's algorithm method, distance and time of data may be processed in order to determine the fastest route to the Campus University of Jember. The results of the survey and analysis shows that the main roads include Jl. HayamWuruk, Jl. Gajah Mada, Jl. Sultan Agung and Jl. PB Sudirman became the fastest route to get to the Campus of the University of Jember.
Jurnal Rekayasa Sipil dan Lingkungan, 2019
Roads are a means of transportation that is often used by Indonesians to travel. Some class II ro... more Roads are a means of transportation that is often used by Indonesians to travel. Some class II road segments in Lumajang Regency include Tempeh-Sumberjati, Sumberjati-Karangrejo, Karangrejo-Yosowilangun, and Jalan Lintas Timur. The four sections are collector roads outside the city so that large vehicles often pass. Before handling the road, it must first be assessed on the condition of the pavement. The road surface condition assessment system uses the PCI method and the IRI method. The purpose of this study was to determine the condition of road damage and handling damage to the road so that the maintenance category was obtained. The IRI method is obtained from the Bina Marga Lumajang PU, while the PCI method is done visually. The average results of the four PCI methods are 76.54 with very good conditions and the IRI method is obtained 3.94 with good conditions so that both of these methods produce the same conclusions Maintenance for the PCI method and the IRI method uses routine...
MATRAPOLIS: Jurnal Perencanaan Wilayah dan Kota
Pada Rencana Penetapan Kawasan Strategis, dalam penetapan strategis pengembangan kawasan perekono... more Pada Rencana Penetapan Kawasan Strategis, dalam penetapan strategis pengembangan kawasan perekonomian jalur selatan terdapat wisata pantai. Pantai Watu Pecak memang menawarkan banyak keindahan dan keunikan tersendiri. Partisipasi masyarakat Desa Selok Awar–Awar sangat dibutuhkan dalam meningkatkan jumlah wisatawan di Pantai Watu Pecak. Tujuan dilakukan penelitian adalah untuk mengidentifikasi faktor yang mempengaruhi pengembangan pariwisata Pantai Watu Pecak dalam mendukung sektor kepariwisataan di Kabupaten Lumajang, untuk mengetahui bentuk partisipasi yang dilakukan masyarakat dalam pengembangan Pantai Watu Pecak dan merumuskan strategi pengembangan pariwisata Pantai Watu Pecak di Kabupaten Lumajang. Metode analisis yang digunakan dalam menentukan faktor-faktor adalah Delphi, untuk penentuan bentuk partisipasi masyarakat menggunakan metode Deskriptif, sedangkan dalam penentuan strategi pengembangan wisata dilakukan dengan menggunakan metode SWOT. Berdasarkan hasil analisa, diketa...
Konstruksia, 2021
Proyek Apartemen Grand Shamaya Surabaya merupakan salah satu proyek gedung tinggi di Surabaya yan... more Proyek Apartemen Grand Shamaya Surabaya merupakan salah satu proyek gedung tinggi di Surabaya yang dibangun di atas lahan yang memiliki kondisi tanah yang buruk dan sempit serta berada di antara gedung tinggi yang berdekatan. Pada pekerjaan basemen gedung ini memerlukan metode pelaksanaan yang tepat karena metode pelaksanaan ini sangat berpengaruh terhadap ketercapaian tujuan proyek (biaya, mutu dan waktu). Oleh karena itu perlu adanya analisa yang mendalam dengan mempertimbangkan semua variabel yang berpengaruh dalam penentuan metode konstruksi. Salah satu metode yang dapat diaplikasikan untuk membantu dalam pengambilan keputusan metode konstruksi yang tepat adalah Metode Analytical Hierarchy Process (AHP). Metode ini memiliki kemampuan dalam menyusun skala prioritas (sebagai faktor bobot) dari variabel yang kompleks dan mudah diaplikasikan, sehingga metode ini dapat dijadikan alat untuk pengambilan keputusan penentuan metode konstruksi yang mudah dan cepat. Pengambilan data dilaku...
High Rise Building project has a very high work complexity so that the probability of the risk is... more High Rise Building project has a very high work complexity so that the probability of the risk is enormous. The risks are likely to occur can inhibit the work of the project and can affect costs. It is therefore necessary to risk management to minimize the impacts caused by therisk. This research aims to know the factor dominant risk on construction projects that have an impact on costs. Identification of risk review of aspects of the internal non technical : construction management cost, risk, uncertainty work, terlamba t his project, the uncertainties of material and equipment. The methods used by conducting a detailed questionnaire on the project of High Rise Building. Methods of analysis using the method of Pearson. The dominant risk analysis obtained from the main questionnaire and is calculated based on the method of the concept of Severity Index (SI) as well as the measurement of the value of the level of risk. Analysis on the dominant risk against 12 can cost. The most domin...
The traveler is always looking for the fastest route to reach the destination point. Similarly, g... more The traveler is always looking for the fastest route to reach the destination point. Similarly, guests of the Jember University come from outside the city, especially from the direction of Surabaya and reverse direction. To find the quickest route to the University of Jember, it takes distance and time information throughout the road leading to the campus of University of Jember. Using Dijkstra's algorithm method, distance and time of data may be processed in order to determine the fastest route to the Campus University of Jember. The results of the survey and analysis shows that the main roads include Jl. HayamWuruk, Jl. Gajah Mada, Jl. Sultan Agung and Jl. PB Sudirman became the fastest route to get to the Campus of the University of Jember.