An intelligent operations scheduling system in a job shop (original) (raw)
Access this article
Subscribe and save
- Starting from 10 chapters or articles per month
- Access and download chapters and articles from more than 300k books and 2,500 journals
- Cancel anytime View plans
Buy Now
Price excludes VAT (USA)
Tax calculation will be finalised during checkout.
Instant access to the full article PDF.
References
- R. W. Conway,Theory of Scheduling, Addison-Wesley, 1967.
- M. S. Fox, “Constraint-directed search: A case study of jop-shop scheduling”,Carnegie Mellon University CMU-RI-TR-83-22, 1983.
- C. Le Pape, “SOJA: A daily workshop scheduling system”,Proceedings of the Fifth Technical Conference of the BCS Specialist Group on Expert Systems, Warwick, UK, 1985.
- S. F. Smith, M. S. Fox and P. S. Ow, “Constructing and maintaining detailed prodution plans: investigations into the development of knowledge-based factory scheduling systems”,AI Magazine,7(4), pp. 45–61, 1986.
Google Scholar - A. Collinot, C. Le Pape and G. Pinoteau; “SONIA: A knowledge-based scheduling system”,Artificial Intelligence in Engineering,3, pp. 86–94, 1988.
Google Scholar - S. F. Smith, “A constraint-based framework for reactive management of factory schedules”,Intelligent Manufacturing, pp. 113–130, 1988.
- K. Hadavi, M. S. Shahraray and K. Voigt, “ReDS — A dynamic planning, scheduling, and control system for manufacturing”,Journal of Manufacturing System,9(4), pp. 332–344, 1990.
Google Scholar - P. Burke and P. Prosser, “Distributed asynchronous scheduling”,Proceedings of the Fifth International Conference of Application of Artificial Intelligence in Engineering V, vol. 2: Manufacture and Planning, Boston, USA, July 1990.
- K. Mckay, F. Safayeni and J. Buzacott, “Job shop scheduling theory: what is relevant?”,Interfaces,18(4), pp. 84–90, 1988.
Google Scholar - S. F. Smith, “Knowledge-based production management: approaches, results and prospects”,Production Planning and Control,3(4), pp. 350–380, 1992.
Google Scholar - K. McKay, J. Buzacott and F. Safayeni, “The scheduler's knowledge of uncertainty: The missing link”,Proceedings IFIP Working Conference on Knowledge-Based Production Management Systems, Galway, Ireland, 1988.
- C. C. Meng and M. Sullivan, “LOGOS: A constraint-directed reasoning shell for operations management,”IEEE Expert,6(1), pp. 20–28, 1991.
Google Scholar - J. J. Kanet and V. Sridaran, “The electronic leitstand: a new tool for shop scheduling”,Manufacturing Review,3(3), pp. 161–169, 1990.
Google Scholar - M. Kang, Y.G. Kim and J. H. Park, “Interactive production control by simultaneous consideration of schedules and loads”,Proceedings of the 2nd International Conference on Automation Technology,4, pp. 99–103, Taiwan, 1992.
Google Scholar - R. J. Stokey, “Al factory scheduling: multiple problem formulations”,SIGART Newsletter,110, pp. 27–30, 1989.
Google Scholar - F. A. Roadammer, “A recent survey of production scheduling”,IEEE Transactions on Systems, Man and Cybernetics,18(6), pp. 841–859, 1988.
Google Scholar - S. C. Graves, “A review of production scheduling”,Operations Research 29(4), pp. 647–675, 1981.
Google Scholar - J. H. Park, “A study on the intelligent operations scheduling system in a job shop”, PhD dissertation, Seoul National University, 1993.
- R. Engelmore and T. Morgan,Blackboard Systems, Addison-Wesley, 1988.
- P. O'grady and K. H. Lee, “An intelligent cell control system for automated manufacturing”,International Journal of Production Research,26(5), pp. 845–861, 1988.
Google Scholar - A. Barr, P. R. Cohen and E. A. Feigenbaum,The Handbook of Artificial Intelligence IV, Addison-Wesley, 1989.