Cost and Productivity Analysis of Equipments for Flexible Pavement- a Case Study (original) (raw)
Equipments being a necessity of any construction project still needs major research to improve preestimation accuracy for productivity and costs related to equipment. A case study conducted to evaluate per hour owning and operating cost(O&O cost) and per hour productivity of excavator, loader, backhoe loader, grader, paver, hot mix plant , soil compactor, tipper truck and tandem roller used in various projects in Punjab and Chandigarh for construction of flexible pavement with appropriate methods are represented in this paper with appropriate results.
Sign up for access to the world's latest research.
checkGet notified about relevant papers
checkSave papers to use in your research
checkJoin the discussion with peers
checkTrack your impact