Estimating the amount of labour and materials needed for manufacturing the reinforced soilcement piles by deep soil mixing technology (original) (raw)

2016

Abstract

This paper deals with the process of pile foundation installation for a civil building. Deep soil mixing technology is under investigation. We’ve used time study method to obtain a necessary material for designing of cost. We've calculated normative values of time, workers’ labor and building materials for the manufacturing of a 1 m 3 of reinforced soil-cement pile for the first time. Presented results allow adequate calculation of an estimate and designing of a project for construction with an application of the reinforced soil-cement piles.