Perancangan PLTS Sebagai Sumber Energi Listrik Pada Kantor Energi Dan Sumber Daya Mineral Propinsi Sulawesi Tengah (original) (raw)
2016
Abstract
One of the technologies that utilizes solar energy in delivering electric energy is photovoltaic (PV) system. It converts solar energy into electric energy directly which is environmental friendly, non-pollution, not taking fossil fuel and low cost maintenance. Mineral Resources (ESDM) is one of the offices which uses PV system in Palu municipality. However, only 3 AC powered by non battery-PV is used in ESDM. In the future, ESDM have planned to add the capacity of PV system to supply the other AC. The objective of this study was to design PLTS system for supplying other AC and lighting especially in evening. In this case, sun panel capacity, battery, BCR, and inventers will be determined. This study also aims giving information about investment cost which is needed by PLTS with battery without battery and PLN. The calculation in this study used data from BMKG Meteorology Station Palu and Mineral Sources (ESDM) office of Central Sulawesi. The results showed that the capacity power f...
Ambo Asse hasn't uploaded this paper.
Let Ambo know you want this paper to be uploaded.
Ask for this paper to be uploaded.