First light of the 6.5-m MMT adaptive optics system (original) (raw)
2003, Proceedings of SPIE
The adaptive optics system of the 6.5m MMT with its deformable secondary has seen first light on the sky in November 2002. Since then, it has logged over 30 nights at the telescope and has been used with several scientific cameras and a dedicated IR infrared camera. Results so far are extremely encouraging with Strehls of up to 20% in H-band and 98% in M limited in part by the control algorithm that is being improved. Reliability of the deformable secondary mirror (DM) has been remarkable with only one occurrence of a malfunction that required removing the secondary from its hub. In this paper, we review the milestones achieved and the performances obtained in the first year of operation. We will also address the operational constraints associated with the deformable secondary and the steps taken to relax these constraints. We show that despite its apparent complexity, an adaptive secondary AO system can be operated with modest effort from the telescope and AO staff
Sign up for access to the world's latest research.
checkGet notified about relevant papers
checkSave papers to use in your research
checkJoin the discussion with peers
checkTrack your impact
Loading Preview
Sorry, preview is currently unavailable. You can download the paper by clicking the button above.