Magnetic Measurements of HL-LHC AUP Cryo-Assemblies at Fermilab (original) (raw)

Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project

IEEE Transactions on Applied Superconductivity, 2021

The U.S. Hi-Lumi LHC Accelerator Upgrade Project (AUP) and CERN have joined efforts to develop high field quadrupoles for the Hi-Lumi LHC upgrade. The US national laboratories in the AUP project will deliver 10 magnets and each cryostat has two 4.2 m high gradient quadrupoles in it. These magnets are made of Nb3Sn conductors, with large aperture (150 mm) and integrated gradient of 556.9 T. This paper reports on magnetic measurements performed during the vertical test at Brookhaven National Laboratory (BNL) in 2019-2020. A warm measurement Z-Scan (+/-15 A) with 42 Z-positions before cool-down was performed at BNL. The results were directly compared to field data measured at LBNL during magnet assembly. Measured harmonics and magnetic center offsets (ΔX and ΔY) have provided timely and informative diagnostics on the magnet structure's shape at both warm and cold temperatures. A new centering fixture was designed and added to better center the warm bore tube which contains the rotating coil probe. After the quench training to 16.47 kA was achieved, a complete set of cold measurements (Z-Scan at 16.47 kA and I-Scan from 960 A to 16.47 kA and back to 960 A) was made. Periodic axial variation of allowed and nonallowed harmonics was observed which is related to the coil radial and/or mid-plane variations along the magnet axis. Overall, the average harmonics in the straight section are within the required field boundaries.

Performance of the Room Temperature Systems for Magnetic Field Measurements of the LHC Superconducting Magnets

IEEE Transactions on Applied Superconductivity, 2006

The LHC will be composed of 1232 horizontally curved, 15-meter long, superconducting dipole assemblies and 474 Short Straight Sections containing various types of quadrupoles. These magnets are manufactured by several European companies and half of them are currently produced. The field quality at room temperature is strictly monitored to guide and validate the assembly at different stages of the production in the industry. Dipoles and quadrupoles are measured with two different rotating coil systems. These "moles" travel inside the 50 mm aperture and accurately measure the field and gradient strength integrated over the length, the field direction and high order harmonics. We describe here these two systems, their performance and the experience gained through the two first years of operation.

A system for series magnetic measurements of the LHC main quadrupoles

IEEE Transactions on Appiled Superconductivity, 2002

More than 400 twin aperture lattice quadrupoles are needed for the Large Hadron Collider (LHC) which is under construction at CERN. The main quadrupole is assembled with correction magnets in a common cryostat called the Short Straight Section (SSS). We plan to measure all SSSs in cold conditions with an unprecedented accuracy: integrated gradient of the field within 150 ppm, harmonics in a range of 1 to 5 ppm, magnetic axis of all elements within 0.1 mm and their field direction within 0.2 mrad. In this paper we describe the automatic measurement system that we have designed, built, and calibrated. Based on the results obtained on the two first prototypes of the SSSs (SSS3 and SSS4) we show that this system meets all above requirements.

Power Test of the First Two HL-LHC Insertion Quadrupole Magnets Built at CERN

IEEE Transactions on Applied Superconductivity, 2022

The High-Luminosity project (HL-LHC) of the CERN Large Hadron Collider (LHC), requires low β* quadrupole magnets in Nb 3 Sn technology that will be installed on each side of the ATLAS and CMS experiments. After a successful shortmodel magnet manufacture and test campaign, the project has advanced with the production, assembly, and test of full-size 7.15m-long magnets. In the last two years, two CERN-built prototypes (MQXFBP1 and MQXFBP2) have been tested and magnetically measured at the CERN SM18 test facility. These are the longest accelerator magnets based on Nb 3 Sn technology built and tested to date. In this paper, we present the test and analysis results of these two magnets, with emphasis on quenches and training, voltage-current measurements and the quench localization with voltage taps and a new quench antenna. Index Terms-Low beta quadrupole, Nb 3 Sn, quench, superconducting magnets. I. INTRODUCTION A S PART of the HL-LHC project at CERN, the Nb-Ti inner triplet quadrupole magnets near the ATLAS and CMS interaction points will be replaced with large aperture Nb 3 Sn quadrupole magnets, named MQXF [1], [2]. These magnets are developed, manufactured, and tested in a collaboration between CERN and the US HL-LHC Accelerator Upgrade Project (AUP). The MQXF program includes the construction and test of several short-length model magnets, the 4.2-m-long magnets for Q1 and Q3 (constructed by AUP [3]), and the 7.15-m-long magnets for Q2a and Q2b (MQXFB, constructed by CERN). The first two MQXFB full-length prototype magnets (MQXFBP1 and MQXFBP2) were manufactured, assembled and cryostated at CERN [4]. MQXFBP1 was tested in summer-fall 2020, and MQXFBP2 was tested in winter-spring and fall 2021.

Test Results of the First Pre-Series Quadrupole Magnets for the LHC Hi-Lumi Upgrade

IEEE Transactions on Applied Superconductivity, 2021

The future high luminosity (Hi-Lumi) upgrade of the Large Hadron Collider (LHC) at CERN will include eight (plus two spares) 10.2 m-long Cryo-assemblies which will be components of the triplets for two LHC insertion regions. Each cold mass in the Cryo-assemblies will consist of two 4.2 m-long Nb3Sn high gradient quadrupole magnets, designated MQXFA, with aperture 150 mm and operating gradient 132.2 T/m, for a total of twenty magnets. Before assembling and testing the final cold masses at Fermilab, the component quadrupoles are being tested first at the vertical superconducting magnet test facility of the Superconducting Magnet Division (SMD) at Brookhaven National Laboratory (BNL), in superfluid He at 1.9 K and up to 18.0 kA, in accordance with operational requirements of the LHC. The tests of the first two full-length prototype quadrupole magnets MQXFAP1 and MQXFAP2 at BNL have been reported previously. The first two pre-series magnets, the first two that will be used in the LHC, have also now been tested. This paper reports on the quench test and training results of these two magnets. The test results of these magnets will be important for validating the final MQXFA design for operational magnets.

Alignment of production quadrupole magnets for the LHC interaction regions

IEEE Transactions on Appiled Superconductivity, 2003

High-gradient superconducting quadrupole magnets are being developed by the US LHC Accelerator Project for the Interaction Regions of the Large Hadron Collider. Determination of the magnetic axis for alignment of these magnets will be performed using a single stretched wire system. These measurements will be done both at room and cryogenic temperatures with very long wire lengths, up to 20m. This paper reports on the stretched wire alignment methodology to be employed and the results of recent room-temperature measurements on a 2 m model magnet with long wire lengths.

Measurements of the LHC Corrector Magnets at Room and Cryogenic Temperatures

The superconducting twin aperture main dipole magnets of the LHC accelerator are equipped with pairs of sextupole and decapole correctors at their ends. Similarly, octupole correctors are aligned at t he end of the main quadrupole magnets. Dedicated stations have been built for tests of these correctors at room temperature as well as superfluid helium temperature. Measurements of the training behav iour and of the magnetic field quality are routinely performed. The search for the magnetic axis and the transfer of its position to fiducials are performed at room temperature. A description and the performances obtained with these two benches are also presented.

A novel device for the measurement of the mechanical and magnetic axes of superconducting magnet assemblies for accelerators

IEEE Transactions on Appiled Superconductivity, 2002

In the context of the LHC superconducting magnet production, especially for dipoles and quadrupoles due to their complexity, it is foreseen to perform acceptance tests, at an early production stage, to detect possible significant deviations from the design values. The knowledge of the magnetic field geometry is very important, especially for the main magnets. In order to get this information a new device has been conceived that measures the magnets at room temperature during different stages of construction. This device incorporates a sensitive measuring probe and an efficient data acquisition system because the coils are only powered at about 10 5 of the nominal D.

Electrical and Magnetic Performance of the LHC Short Straight Sections

IEEE Transactions on Applied Superconductivity, 2006

The Short Straight Section (SSS) for the Large Hadron Collider arcs, containing in a common cryostat the lattice quadrupoles and correction magnets, have now entered series production. The foremost features of the lattice quadrupole magnets are a two-in-one structure containing two 56 mm aperture, two-layers coils wound from 15.1 mm wide NbTi cables, enclosed by the stainless steel collars and ferromagnetic yoke, and inserted into the inertia tube. Systematic cryogenic tests are performed at CERN in order to qualify these magnets with respect to their cryogenic and electrical integrity, the quench performance and the field quality in all operating conditions. This paper reports the main results obtained during tests and measurements in superfluid helium. The electrical characteristics, the insulation measurements and the quench performance are compared to the specifications and expected performances for these magnets. The field in the main quadrupole is measured using three independent systems: 10-m long twin rotating coils, an automatic scanner, and single stretched wire. A particular emphasis is given to the integrated transfer function which has a spread of around 12 units rms in the production and is a critical issue. The do-decapole harmonic component, which required trimming through a change in coil shims, is also discussed. Finally, the magnetic axis measurements at room temperature and at 1.9 K, providing the nominal vertical shift for installation are reported.