Building on 50 Years of Systems Engineering Experience for a New Era of Space Exploration (original) (raw)
Related papers
First Year in Review: NASA's Ares I Crew Launch Vehicle and Ares V Cargo Launch Vehicle
43rd AIAA/ASME/SAE/ASEE Joint Propulsion Conference & Exhibit, 2007
The U.S. Vision for Space Exploration guides NASA's challenging missions of scientific discovery.' Developing safe, reliable, and affordable space transportation systems for the human and robotic exploration of space is a key component of fulfilling the strategic goals outlined in the Vision, as well as in the U.S. Space Policy.-' In October 2005, the Exploration Systems Mission Directorate and its Constellation Program chartered the Exploration Launch Projects Office, located at the Marshall Space Flight Center, to design, develop, test, and field a new generation of launch vehicles that would fulfill customer and stakeholder requirements for trips to the Moon, Mars, and beyond.
Engineering America's Future in Space: Systems Engineering Innovations for Sustainable Exploration
2008
The National Aeronautics and Space Administration (NASA) delivers space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides U.S. capability for both crew and cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010, as outlined in the 2006 NASA Strategic Plan. I In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I Crew Launch Vehicle/Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle/Altair Lunar Lander. The goals for this new system include increased safety and reliability, coupled with lower operations costs that promote sustainable space exploration over a multi-decade schedule. This paper will provide details of the in-house ...
SpaceOps 2008 Conference, 2008
The United States (U.S.) is charting a renewed course for lunar exploration, with the fielding of a new human-rated space transportation system to replace the venerable Space Shuttle, which will be retired after it completes its missions of building the International Space Station (ISS) and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Altair Lunar Lander, which will be delivered by the Ares V Cargo Launch Vehicle (fig. 1). This configuration wiD empower rekindled investigation of Earth's natural satellite in the not too distant future. This new exploration infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit (LEO) for extended lunar missions and preparation for the first long-distance journeys to Mars. All space-based operations-to LEO and beyond-are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective architecture solutions to sustain this multi-billiondollar program across several decades. Leveraging SO years of lessons learned, NASA is partnering with private industry and academia, while building on proven hardware experience. This paper outlines a few ways that the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Constellation Program and its project offices to streamline ground operations concepts by designing for operability, which reduces Iifecycle costs and promotes sustainable space exploration.
Operational considerations and comparisons of the Saturn, Space Shuttle and Ares launch vehicles
2009 IEEE Aerospace conference, 2009
of two large launch vehicles to return humans to the Moon. A deliberate effort is being made to ensure a high level of operability in order to significantly increase safety and availability as well as reduce recurring costs of this new launch vehicle. It is the Ares Project's goal to instill operability as part of the requirements development, design and operations of the vehicle. This paper will identify important factors in launch vehicle design that affect the operability and availability of the system. Similarities and differences in operational constraints will also be compared between the Saturn V, Space Shuttle and current Ares I design. Finally, potential improvements in operations and operability for large launch vehicles will be addressed. From the examples presented, the paper will discuss potential improvements for operability for future launch vehicles. 1 2 7. CONCLUSIONS.
Next generations space transportation systems
Future generations Reusable Launch Vehicles (RLV) need to be developed through an extensive use of flight demonstration. But, instead of full scale, expensive, highly system-integrated flight vehicles, future research light vehicles need to be simpler and cheaper. Consequently, the approach emphasizes sub-scale, unmanned, autonomous or remotely piloted vehicles to be flight tested at reduced cost and risk. The Italian Aerospace Research Program PRORA has allowed up to now the realization of a number of ground based laboratories and world-class facilities, like the 70MW Plasma Wind Tunnel SCIROCCO. In 2000, the Unmanned Space Vehicles (USV) program was approved dealing with technology maturation toward RLVs. USV is a technology development program including theoretical, numerical, on-ground experimental and flight test activities. It aims also to realise experimental flying platforms that can complement and integrate the available ground facilities at CIRA. USV was defined based on the belief that in the long run space access and re-entry will be guaranteed by aviation-like vehicles (SSTO-HTHL, sometime called aerospaceplanes). Among others not less important, such vehicles will require innovation and maturation in three main areas: atmospheric re-entry, reusability, sustained hypersonic flight. The USV Program includes thus technology developments along these three directions, up to their validation either on ground and on board Flying Test Beds.
NASA Space Launch System Operations Outlook
13th International Conference on Space Operations 2014, 2014
The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion MultiPurpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the life-cycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reachback support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-ofthe-art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than sequentially, saving both time and money. These themes are accomplished under the context of a new cross-program integration model that emphasizes peer-to-peer accountability and collaboration towards a common, shared goal. Utilizing the lessons learned through 50 years of human space flight experience, SLS is assigning the right number of people from appropriate backgrounds, providing them the right tools, and exercising the right processes for the job. The result will be a powerful, versatile, and capable heavy-lift, human-rated asset for the future human and scientific exploration of space.
The Space Shuttle—a mostly reusable, human-rated launch vehicle
The Space Shuttle-a mostly reusable, human-rated launch vehicle, spacecraft, space habitat, laboratory, re-entry vehicle, and aircraft-was an unprecedented structural engineering challenge. The design had to meet several demands, which resulted in innovative solutions. The vehicle needed to be highly reliable for environments that could not be simulated on Earth or fully modeled analytically for combined mechanical and thermal loads. It had to accommodate payloads that were not defined or characterized. It needed to be weight efficient by employing a greater use of advanced composite materials, and it had to rely on fracture mechanics for design with acceptable life requirements. It also had to be certified to meet strength and life requirements by innovative methods. During the Space Shuttle Program, many such structural design innovations were developed and extended to vehicle processing from flight to flight.