Knowledge based-system for alternative design, cost estimating and scheduling (original) (raw)
Knowledge based-system for alternative design, cost estimating and scheduling
Knowledge Based Systems, 2002
Abstract
... Because forming schedule manually is very costly and time consuming the scheduler cannot perform several schedule alternative to evaluate time integrated cost that indicate the timing of capital needs for the design decisions and construction methods selection. ...