A Simulation Model for Logical and Operative Clash Detection (original) (raw)

STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION TOOL IN BUILDING DESIGN

Building Information Modeling (BIM) is recently becoming popular and a extremely economical resolution for information management in Architecture, Engineering and Construction (AEC) industry. In Indian construction state of affairs most of the projects are still using 2D CAD drawing for his or her execution purpose. These 2D CAD drawings have lot of issues during execution like miscommunication, misunderstanding and time consuming process etc., This sort of errors and cost is reduced while using this BIM process Clash detection tool is an application of BIM which is employed for the coordination of building systems within 3D building models. This report gives a short introduction about Clash detection in BIM and it focus the methodology involved conducting clash detection analysis using building information modeling. This work involves searching for, how this clash detection tool helps to optimize of clashes in construction of particular building using BIM Coordination. The methodology involved in this report will be study of a G+3 residential building which consist of an architectural, structural and Mechanical, Electrical and Plumbing (MEP) BIM models and their subsequent clash detection analysis is done in this study, commercial software like as Autodesk Revit 2021, Autodesk Navisworks Manage 2022 are used. It also focuses on the methods of simplifying and standardizing the method of Clash Detection using Autodesk Navisworks. The entire cost of the project won't be increased and completion of the project on time and avoids overruns of budget.

Based BIM techniques to clash detection for construction projects

Periodicals of Engineering and Natural Sciences (PEN), 2023

Building Information Modeling (BIM) has brought about a qualitative change in the design and management of construction projects because it represents a digital simulation of the physical characteristics of the building, and this increases its efficiency before the actual construction begins. In Iraq, most construction projects still use CAD two-dimensional drawing for the purpose of the implementation process, especially government projects, and this causes many problems due to the difficulty of communication between the various disciplines involved in the design and misunderstanding during implementation. This type of problem is reduced by combining BIM drawings prepared by designers and making them into a single model. In this process of merging conflicts are found using BIM tools such as Autodesk Navisworks. There are three main types of detection. This article includes how a clash detector can help improve clashes in the design phase before starting to construct a specific building using BIM applications and focuses on hard detection type (overlap of a particular element with the others). The methodology involved in this research is to study an educational building (24-classroom model school) consisting of structural and architectural BIM models only, clash detection analysis is done using Autodesk Revit and Autodesk Navisworks Manage software.

IRJET- Making a Construction Project More Efficient using Clash Detection Tool of Building Information Modeling

IRJET, 2021

This review paper summarizes how Building Information Modeling (BIM) has emerged as a highly efficient solution for information management in the Architecture, Engineering, and Construction (AEC) industry. In the Indian construction scenario, most of the projects are still using a 2D CAD drawing for their design and execution purpose. These 2D drawings have a lot of limitations during execution like miscommunication, misunderstanding, and time-consuming, etc., This type of errors will be reduced while using BIM process. Clash detection tool is an application of BIM which is used for the coordination of building systems within 3D building models. This review paper gives a brief idea about how effective clash detection in BIM is and it focuses on the methodology involved in conducting clash detection analysis using Building Information Modeling software. Also, this tool is used in foreign countries due to its efficiency in improving the construction work. This work also involves finding out, how this clash detection tool helps to optimize the cost and time for the construction using BIM Coordination. The benefits and drawbacks of 4D BIM model were discussed. In this study, commercial software such as Autodesk Revit 2018, Autodesk Navisworks Manage 2019 are used. It also focuses on the process of simplifying and standardizing the process of Clash Detection using Autodesk Navisworks. The researchers have unanimously found that total cost of the project will not be increased and surety of completion of the project on time avoids overruns by using clash detection.

Cost and Time Optimization for Construction of Residential Building by Clash detection in Building Information Model(BIM)

Building Information Modelling(BIM) has recently emerged as a highly efficient solution for information management in Architecture, Engineering and Construction(AEC) industry. Clash detection tool is an application of BIM which is used for the coordination of building systems within 3D building models. This paper gives a brief introduction about Clash detection in BIM. The prime objective of this research is to identify the extent of cost optimization and time optimization for the construction of residential building using BIM Coordination (Clash Detection). This research involves the case study of a residential building constructed using conventional methods of building information management. The scope of utilization of BIM Coordination for the project under consideration was identified from the acquired data. This research also focuses on simplifying and standardizing the process of BIM coordination using Autodesk Navisworks.

BIM for construction clash detection process after design stage: a case study of high residential complex in Nur-Sultan city

Technobius, 2021

The construction industry is one of the most unpredictable and human-dependent sectors of production. This is due to the large flow of information during construction, which requires clear organizational activities. Traditionally established methods of communication on construction sites require modernization. That is why the concept for practitioners "Building Description System and Construction Product Modeling" was developed in 1970. The building society supported this concept and called it "Building Information Modeling" - BIM. The new wave of digital design required a strong material and technical base, the analysis of existing documentation and the creation of design tools began. The authors of the article use the highly specialized NavisWorks software to analyze possible losses as a result of combining the existing design documentation into BIM models on the example of one of the Nur-Sultan projects. The residential complex located in Nur-Sultan was chosen...

A Framework for Construction Workspace Management: A Serious Game Engine Approach

Computing in Civil Engineering (2012), 2012

Construction workspace is regarded as one of the main constraints on construction sites. Construction workspaces are generally difficult to proactively plan and manage due to the dynamic nature of a site where workspace requirements keep changing as time evolves. However, project managers are looking for ways to develop proactive site plan for the workspaces required for construction activities as this can impact not only on the cost and project duration, but can also contribute to provide a safer site. This research paper presents an approach for integrating workspace management within the planning process using a serious game engine technology. This paper first illustrates a review of the workspace management practices and advanced visualization techniques in the construction industry. Then, it presents a process framework for an interactive decision support system that integrates workspace planning into 5D planning in order to enable safer, efficient and more productive construction sites. The decision support system will identify schedule conflicts, workspace conflicts and the severity of their conflicts, and workspace congestions on a construction site and allow construction planners to resolve spatial conflicts prior to construction. Finally, the paper shows the current progress in the development of an initial prototype and outlines the future work and research.

Relative Study on Clash Detection and its Effects on BIM Modelling

International Journal for Research in Applied Science and Engineering Technology (IJRASET), 2022

Designers and builders can simulate a physical environment using BIM, a type of digital technology, before starting actual construction. When developing and building things, various disciplines must work closely together. Each discipline is responsible for providing a unique contribution to the overall design. The objects from other disciplines may, however, occupy the same position in space or the same orientation when the incomplete designs are merged known as 'clash'. A collision of this nature is frequently discovered during construction, necessitating a significant amount of extra time and price. To avoid clashes in the final design, early collaboration is essential. BIM automation techniques can do this and perhaps reduce clashes by coordination of 3D Models. A case study that comprised clash detection between architectural, structural, and MEP BIM models was used to conduct the inquiry. The current study used Autodesk Navisworks Manage and Autodesk Revit as BIM tools to design capabilities to streamline and automatically discover clashes. The analysis of the case study data showed that BIM is a useful tool for identifying conflicts between building components. And an investigative study was done to know the reason why these clashes are created during modeling based on the questioners answered by BIM Modelers. The findings emphasize the need for greater transparency in partnerships where designers from varied backgrounds can work on projects simultaneously. This open and inclusive approach may have an impact on how architects, engineers, and construction professionals are trained in the future.

Clash detection analysis with BIM-based software on midrise building construction project

IOP conference series, 2020

The goal of this research is to conduct clash detection analysis using BIM-based software for construction of mid-rise building using the BIM technology. The research method implemented in this study is analysis of clash detection using building information modeling (BIM) software for structural, architectural, and MEP of mid-rise building in Jakarta. The result of this thesis is BIM-based 3D construction modelling, the analysis of clash detection which detected namely 104 clashes within overall models, and the estimate analysis of change in construction cost due to clash resolves with result of nearly 1% change of cost and quantity within structural, and MEP model.

Minimizing conflicts during construction stage by using building information modeling

2015

Public Works Department of Malaysia (PWDM) is one of the main governments’ technical agency in Malaysia. PWDM has supervised numerous government projects but still faces problems such as delays and variations due to conflicts during construction. The main study is to investigate the effectiveness of applying Building Information Modeling (BIM) in managing conflicts during construction. The results of the analysis were established from surveys of questionnaires, interviews and lastly from PWDM’s own database. The analysis was based on mixed method which combines the qualitative and quantitative analysis approach and finally comparing it with literatures that discusses conventional projects and projects using BIM. This study which focuses on the conflicts during construction, finds that conflicts are attributed to the lack of communication and coordination which eventually contributes to the project delay. This study was conducted in order to find the root cause of the problem and pro...