Minimizing Maximum Lateness for a No-Wait Flowshop Scheduling (original) (raw)
Related papers
More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness
International Journal of Industrial Engineering Computations
International Journal of Industrial Engineering Computations, 2022
Earliness/tardiness minimization in a no-wait flow shop with sequence-dependent setup times
Journal of Project Management, 2022
Heuristics for no-wait flow shop scheduling problem
International Journal of Industrial Engineering Computations, 2016
Journal of Industrial & Management Optimization, 2017
New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness
International Journal of Production Research, 2009
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
Applied Mathematical Modelling, 2014
International Journal of Production Research, 2012
Sequence-dependent flow shop scheduling problem minimising the number of tardy jobs
The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times
International Journal of …, 2007
RAIRO - Operations Research
A heuristic approach to minimizing the waiting time of jobs in two-stage flow shop scheduling
Badania Operacyjne i Decyzje/Operations Research and Decisions, 2024
Computers & Mathematics with Applications, 2010
Batch Scheduling to Minimize Total Flow Time in No-Wait Flow Shop
Minimizing total completion time for flowshop scheduling problem with uncertain processing times
RAIRO - Operations Research
Minimizing the Number of Tardy Jobs in Flow Shop Sequence Dependent Setup Times Scheduling Problem
2011
Mathematical and Computer Modelling, Vol. 29, 1999, 101 - 126.
International Journal of Engineering Research and Applications, 2017
Flow-Shop Scheduling with Transportation Capacity and Time Consideration
Computers, Materials & Continua
Computers & Industrial Engineering, 2013
Permutation flow shop scheduling with earliness and tardiness penalties
International Journal of Production Research, 2009
Flow Shop Scheduling Problem: a Computational Study
2002
Improved Exact Methods for Solving No-Wait Flowshop Scheduling Problems With Due Date Constraints
International Journal of Advanced Manufacturing Technology, Vol. 37, 2008, 354 - 370
A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups
Computers & Operations Research, 2006
A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups
Operations Research Letters, 2000
Solving Permutation Flow Shop Scheduling Problem with Sequence-Independent Setup Time
Journal of Applied Mathematics