Safety management on bus rapid transit corridor Delhi: process and outcomes (original) (raw)
Injury Prevention, 2010
Abstract
IntroductionDelhi government operationalised 5.8 km, phase-1 length of (14.8 km long) bus rapid transit system corridor in April 2008. First 6 months of operations witnessed six fatal accidents as against an annual average of nine during the preconstruction period; prompting this study to find reasons and measure efficacy of interventions.MethodThe corridor operator, Delhi Integrated Multi-Modal Transit System, introduced monitoring processes,