Abstract
Refurbishment and upgrading of ageing hydropower plants contribute to increase of renewable energy share in modern electrical grid systems. The potential increase of discharge and flexibility of load variation may result in much higher dynamic loads on both refurbished and non-refurbished plant components during transient operating events. First, water hammer control strategies are outlined including operational scenarios, surge control devices, redesign of the pipeline components, or limitation of operating conditions. Water hammer models and solutions are briefly discussed in the light of their capability, availability and uncertainty. The core of the paper is devoted to investigations of water hammer effects in a high-head hydropower plant Piva, Montenegro which is currently in the final phase of refurbishment. The flow-passage system of the Piva HPP is comprised of the intake structure, followed by three parallel penstocks each with Francis type water turbine at the downstream e...
Anton Bergant hasn't uploaded this paper.
Let Anton know you want this paper to be uploaded.
Ask for this paper to be uploaded.