Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation (original) (raw)

Critical Path Method in a Project Network using Ant Colony Optimization

Prof. Ravi Shankar Nowpada

2011

View PDFchevron_right

Using Ant Colony Optimization algorithm for solving project management problems

ahmed bahgat

Expert Systems with Applications, 2009

View PDFchevron_right

Time-cost trade-off analysis in project management: An ant system approach

Hadi Mokhtari

IEEE Transactions on Engineering Management (ISI-indexed)

View PDFchevron_right

Comparison of Project Scheduling techniques: PERT versus Monte Carlo simulation

Neela Rajhans

Industrial Engineering Journal, 2018

View PDFchevron_right

ORIGINAL ARTICLES Determining project completion time in stochastic networks using discrete event simulation method 1

Fariborz Jolai

2013

View PDFchevron_right

Scenario selection optimization in system engineering projects under uncertainty: A multi-objective Ant Colony method based on a learning mechanism

Cédrick Béler

2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2016

View PDFchevron_right

A mathematical model for crashing projects by considering time, cost, quality and risk

Mohammad Feylizadeh

Journal of Project Management, 2017

View PDFchevron_right

MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-RISK USING ANT COLONY OPTIMIZATION

Arun Chandramohan

View PDFchevron_right

A risk-based approach applied to system engineering projects: A new learning based multi-criteria decision support tool based on an Ant Colony Algorithm

Cédrick Béler

Engineering Applications of Artificial Intelligence

View PDFchevron_right

A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management

Walter Gutjahr

Informs Journal on Computing, 2000

View PDFchevron_right

Optimal reduction of project risk severity: A case study

Moheeb Saeid

2015

View PDFchevron_right

Network Analysis for Projects with High Risk Levels in Uncertain Environments

Asmaa Atef

Computers, Materials & Continua

View PDFchevron_right

A Fuzzy Simulated Annealing approach for project time-cost tradeoff

Rita A Ribeiro

Journal of Intelligent and Fuzzy Systems, 2012

View PDFchevron_right

Mulit Objective Ant Colony Optimization for Time-Cost- Risk Trade for Consstruction Projects

S.Lakshmi Narayanan

View PDFchevron_right

Optimization of Project Scheduling Activities in Dynamic CPM and PERT Networks Using Genetic Algorithms

M. Ali Akcayol

Süleyman Demirel Üniversitesi Fen Bilimleri Enstitüsü Dergisi

View PDFchevron_right

Project time-cost trade-off scheduling: a hybrid optimization approach

Hadi Mokhtari

International Journal of Advanced Manufacturing Technology (ISI-indexed)

View PDFchevron_right

Comparison of a Fuzzy Genetic and Simulated Annealing Algorithm Approach for Project Time-Cost Tradeoff

Natasa Glisovic

Journal of Applied Mathematics, 2014

View PDFchevron_right

Activity modes selection for project crashing through deterministic simulation

Biswajit Satpathy

Journal of Industrial Engineering and Management, 2011

View PDFchevron_right

An optimization model for stochastic project networks with cash flows

Stefano Benati

Computational Management Science, 2006

View PDFchevron_right

PROJECT SCHEDULING USING MICROSOFT PROJECT AND PROPOSED ANT COLONY OPTIMIZATION TECHNIQUE USING MATLAB

IRJET Journal

View PDFchevron_right

Improved simulated annealing based risk interaction network model for project risk response decisions

Leon Pretorius

Decision Support Systems, 2019

View PDFchevron_right

An Optimistic Risk management in project by simulation

Interal Res journa Managt Sci Tech

View PDFchevron_right

Project Reliability Model Considering Time – Cost – Resource Relationship under Uncertainty

Yudha A SAPUTRA

Procedia Computer Science, 2015

View PDFchevron_right

Measuring uncertainty and criticality in network planning by PERT-path technique

Giovanni Mummolo

International Journal of Project Management, 1997

View PDFchevron_right

Risk Assessment for Discrete Stochastic Time-Cost-Quality Trade-Off Problem Using Simulation-Based Integer Linear Programming Approach

Khalid Al-Gahtani

IEEE Access, 2019

View PDFchevron_right

Project management for arbitrary random durations and cost attributes by applying network approaches

Yi-Kuei Lin

2008

View PDFchevron_right

Scheduling Critical Activities of Stochastic Projects Management

علاء احمد

Journal of Economics and Administrative Sciences, 2012

View PDFchevron_right

A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management

Rafik Nafkha

View PDFchevron_right