Algorithms for Flexible Flow Shop Problems with Unrelated Parallel Machines, Setup Times and Dual Criteria (original) (raw)

International Journal of Advanced Manufacturing Technology, Vol. 37, 2008, 354 - 370

In textile industries, production facilities are established as multi-stage production flow shop facilities where a production stage may be made up of parallel machines. It is known as flexible or hybrid flow shop environment. This paper considers the problem of scheduling n independent jobs in such an environment. In addition, we also consider the general case in which parallel machines in each stage may be unrelated. Each job is processed in ordered operations on a machine of each stage. Its release date and due date are given. Preemption of jobs is not permitted. We consider both sequence- and machine-dependent setup times. The problem is to determine a schedule that minimizes a convex combination of makespan and the number of tardy jobs. A 0-1 mixed integer program of the problem is formulated. Since this problem is NP-hard in the strong sense, we develop heuristic algorithms to solve it approximately. Firstly, several basic dispatching rules and well-known constructive heuristics for flow shop makespan scheduling problems are generalized to the problem under consideration. We sketch how from a job sequence a complete schedule for the flexible flow shop problem with unrelated parallel machines can be constructed. To improve the solutions, polynomial heuristic improvement methods based on shift moved of jobs are applied. Then genetic algorithms are suggested. We discuss the components of these algorithms and test their parameters. The performance of the heuristics is compared relative to each other on a set of test problems with up to 50 jobs and 20 stages.

Loading...

Loading Preview

Sorry, preview is currently unavailable. You can download the paper by clicking the button above.