Perturbation Analysis to set the number of automated guided vehicles in a flexible manufacturing system (original) (raw)
The Fourth International Conference on Control and Automation 2003 ICCA Final Program and Book of Abstracts ICCA-03, 2003
Abstract
By using perturbation analysis on a simulation model of a flexible manufacturing system, this paper proposes a procedure to size this system in order to maximize its productivity. This procedure is based on the identification of the function between flowtime (i.e., the flowtime for each product is computed as the delay between its completion time and its arrival time) and
Karim Labadi hasn't uploaded this paper.
Let Karim know you want this paper to be uploaded.
Ask for this paper to be uploaded.