Optimal batch sizing in a multi-stage production system with rework consideration (original) (raw)

Optimal manufacturing batch size with rework process at a single-stage production system

Ghulam Mustafa, Bhaba Sarker

View PDFchevron_right

Optimal manufacturing batch size with rework in a single-stage production system – A simple derivation

Leopoldo Eduardo Cárdenas-Barrón

Computers & Industrial Engineering, 2008

View PDFchevron_right

On optimal manufacturing batch size with rework process at single-stage production system

Leopoldo Eduardo Cárdenas-Barrón

Computers & Industrial Engineering, 2007

View PDFchevron_right

Optimal manufacturing batch size with rework for a finite-horizon and time-varying demand rates inventory model

L. Benkherouf

RAIRO - Operations Research, 2017

View PDFchevron_right

The optimal manufacturing batch size with rework under time-varying demand process for a finite time horizon

Siti Suzlin Supadi

2014

View PDFchevron_right

Optimal decision-making for a single-stage manufacturing system with rework options

Bhaba Sarker

International Journal of Systems Science: Operations & Logistics, 2018

View PDFchevron_right

Batching for work and rework processes on dedicated facilities to minimize the makespan

Irina Gribkovskaia, Frank Werner

Omega, 2010

View PDFchevron_right

Batching Work and rework Processes on Dedicated Facilities to Minimize the Makespan

Irina Gribkovskaia, Frank Werner

OMEGA, Vol. 38, No. 6, 2010, 522 - 527

View PDFchevron_right

Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework

Hong-Dar Lin

International Journal for Numerical Methods in Biomedical Engineering, 2010

View PDFchevron_right

Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables

Frank Werner

International Journal of Production Economics, Vol. 105, 2007, 345 - 356., 2007

View PDFchevron_right

Batching Work and Rework Processes with Limited Deterioration of Reworkables

Frank Werner

Computers & Operations Research, Vol. 33, 2006, 1595 - 1605, 2006

View PDFchevron_right

An Imperfect Multi-Item Single Machine production system with Shortage, Rework, and Scrapped Considering Inspection, Dissimilar Deficiency Levels, and Non-Zero Setup Times

Wee Hui Meng

Scientia Iranica, 2018

View PDFchevron_right

Optimal manufacturing lot size for a single-stage production system with rework in a fuzzy environment

S. Amiri, Ehsan Shekarian

View PDFchevron_right

Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework

Hong-Dar Lin

2013

View PDFchevron_right

Lot Sizing with Non-Zero Setup Times for Rework

Mehdi Sajadifar

View PDFchevron_right

Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

abdul hakim halim

International Journal of Industrial Engineering Computations, 2016

View PDFchevron_right

Production lot sizing with quality screening and rework

Walid Nasr

Applied Mathematical Modelling, 2016

View PDFchevron_right

Multi-machine economic production quantity for items with scrapped and rework with shortages and allocation decisions

Leopoldo Eduardo Cárdenas-Barrón

Scientia Iranica

View PDFchevron_right

Optimization of Batch Volume in a Multi-Part Manufacturing System

Niyati Raut

2016

View PDFchevron_right

Optimizing multi-stage production with constant lot size and varying number of unequal sized batches

Zvi Drezner

Omega, 2001

View PDFchevron_right

Optimal common manufacturing cycle length for a multi-product inventory system with rework and an outside contractor

Hong-Dar Lin

International Journal for Engineering Modelling, 2019

View PDFchevron_right

An economic production quantity model for deteriorating items with multiple production setups and rework

Gede Widyadana

2012

View PDFchevron_right

Multi products single machine EPQ model with immediate rework process

Leopoldo Eduardo Cárdenas-Barrón

international journal of industrial engineering computations, 2012

View PDFchevron_right

Optimal production strategy and design of multiproduct batch plants

Jaime Dante Canchanya Gutierrez

Industrial & Engineering Chemistry Research, 1990

View PDFchevron_right

Multiproduct EPQ model with single machine, backordering and immediate rework process

Seyed Sadjadi

European J. of Industrial Engineering, 2011

View PDFchevron_right

Inventory optimization in a one product recoverable manufacturing system

javad jafarzadeh

International Journal of Production Economics, 2010

View PDFchevron_right

Optimal synthesis of multiproduct batch plants with cyclic scheduling and inventory considerations

Ignacio Grossmann

Industrial & Engineering Chemistry Research, 1993

View PDFchevron_right

Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs

Harun Kemal ÖZTÜRK

Operational Research, 2018

View PDFchevron_right

Optimal production and maintenance scheduling for a multiproduct batch plant considering degradation

Ala Bouaswaig

Computers & Chemical Engineering, 2020

View PDFchevron_right

An optimal batch size for a production system operating under periodic delivery policy

Ruhul Sarker

Computers & Industrial Engineering, 1999

View PDFchevron_right

A new methodology for the optimal design and production schedule of multipurpose batch plants

Manuel Vicente

Industrial & Engineering Chemistry Research, 1989

View PDFchevron_right

Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework

Hong-Dar Lin

Economic Modelling, 2013

View PDFchevron_right