Sumaiyah 1105344_Skripsi Complete.pdf (original) (raw)

Skripsi MULI.pdf

pengaruh ekstrak n-hexan terhadap fungsi reproduksi mencit betina

JUrnal Skripsi Mahruroji (indo).doc

The purpose of this research is to know the influence of nasyid art education on the formation of morality of students in Pondok Pesantren Darul Ihsan Cimanuk Pandeglang Banten. This research was conducted in Pondok Pesantren Darul Ihsan Cimanuk Pandeglang Banten. This research involves a population of 150 students, while the sample 20% of the total population, which amounted to 30 students, by way of Random Sampling. The techniques used are observation, questionnaire, and interview with the Chief of Pondok and some asatidz / guru, with Correlation methodology, and then analyzed by logic and statistic approach. The result of analysis shows that the moral value of santri through the mean quantitative observation 61.3 and the calculation result of coefficient termination is obtained 85,08% which influence to the formation of santri character of PondokPesantrenDarulIhsan, thus 14,92% other factor. It was concluded that the education of nasyid art influenced the formation of santri morality.

Skripsi (Anugrah Rachmat - E121 10 255)

Diajukan sebagai salah satu persyaratan Untuk mencapai derajat Sarjana S-1 Program Studi Ilmu Pemerintahan Oleh ANUGRAH RACHMAT E 121 10 255 JURUSAN ILMU POLITIK DAN ILMU PEMERINTAHAN FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNVERSITAS HASANUDDIN MAKASSAR 2015 LEMBAR PENGESAHAN SKRIPSI BANTAENG ANALISIS KEBIJAKAN PENANAMAN MODAL ASING DI KABUPATEN yang diajukan oleh: Anugrah Rachmat

4213100058_Rachmat Gunawan_Skripsi.pdf

this study analyzes about the cause of flooding in KM Nusantara Akbar’s engine room. However, this study mainly focuses on flooding that caused by shaft deflection. It was found that the cause of the flooding was packing, driven by a deflection shaft. Analysis was done by a review of the technical and non-technical factors. The analyze of engine room flooding is carried out by using 5 whys method to asses the root causes. The results show that the causes of flooding are reconditioned flange bolts that have been damaged and the addition of flax on the bearing shaft has to cope without straightening axle deflection itself, equipment to overcome the failure system is very less, the workplace is dirty and uncomfortable and happened miss communication between the crews.